- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueInner Layer Precision & Yields
In this issue, we examine the critical nature of building precisions into your inner layers and assessing their pass/fail status as early as possible. Whether it’s using automation to cut down on handling issues, identifying defects earlier, or replacing an old line...
Engineering Economics
The real cost to manufacture a PCB encompasses everything that goes into making the product: the materials and other value-added supplies, machine and personnel costs, and most importantly, your quality. A hard look at real costs seems wholly appropriate.
Alternate Metallization Processes
Traditional electroless copper and electroless copper immersion gold have been primary PCB plating methods for decades. But alternative plating metals and processes have been introduced over the past few years as miniaturization and advanced packaging continue to develop.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - pcb007 Magazine
Estimated reading time: 3 minutes
Contact Columnist Form
To Be Lean is to Be Human
The concepts related to Lean thinking continue to be interpreted in different ways by different people. Relating what happens in real life with principles of Lean as applied to manufacturing can serve to demystify the subject, opening up appreciation and acceptance for the adoption of new Lean ideas in a way that is simple and non-threatening.
Let’s take the example of queues, which have evolved naturally as a respectable alternative to a mad, free-for-all scramble. However, a queue for some people is a less-than-humanizing experience. They associate it with being driven like sheep or cattle, wasting precious time. Being stuck in queues is frustrating if the concept of queuing is abused.
For example, the number and frequency of people arriving at a postal office counter is variable, as is the time that each person will spend at the counter, depending on the transaction. The number of people who can be processed at the counter is relatively fixed by the number of counters that are open. If more people come in to the post office than the available counters, the queue grows longer. If fewer people come in, the queue grows shorter or disappears. The most efficient length of the queue is one person. If this was to stay constant, it would ensure that all counters were busy all of the time, at the same time, and that no one is needlessly waiting in line.
If we apply the principles of Lean thinking to the queue, the target should be to keep the queue size to one. The process has to be adjusted to achieve this with an uncontrolled input variable, in this example, the counter staff, to open or close windows dynamically. But rather than applying Lean principles to the post office worker’s job, which is valid, we can look at process optimization from a higher level. Many such levels of any problem can be looked at simultaneously when applying Lean principles. In practice, however, the application of Lean to the different levels of the problem hits an imposed ceiling.
In our example, the resource to work the counters is limited in the short term by the number of counter staff present, unless the manager steps in at peak times. In the longer term, the post office does not want to employ staff if the budget does not allow it and their time will not be fully utilized. Fixed management principles get in the way of process improvement. The cost of having excess counter staff would be more significant to the business than the cost of the longer queues for extended periods throughout the day, the majority of which is borne by customers or the public infrastructure.
Applying this queue theory to a problem with a complexity similar to that of manufacturing is illustrated by a recent trip to the emergency room. The average waiting time to be seen was four hours, which has become normal in the United Kingdom. Instead of taking the four-hour wait, a suggestion was made to go and “take your chances” at a nearby Minor Injury Unit (MIU). Even a 30-minute drive each way sounded better than four hours queuing, so it seemed worth a try. The MIU was totally unlike the emergency room scenario. In, processed, X-rayed, splinted up and out in 20 minutes. Barely time to check any emails. Queue size: one. This was not unusual. The MIU deals with a focused range of issues, mainly suspected broken bones or minor burns. The staff, who are all nurses, simply deal with cases one by one like a simple production line. Even busy times do not seem to put a strain on the operation because the flow is continuous, similar to a high-volume SMT production line.
Editor's Note: This article originally appeared in the April issue of SMT Magazine.
More Columns from The Essential Pioneer's Survival Guide
If It's My Data, I Can Do What I Want, Right?The Essential Pioneer's Survival Guide: One Size Fits All?
Smart for Smart’s Sake, Part 3: Unification & Traceability
Smart for Smart's Sake, Part 2: Material Management
The 'New Face' of Automotive Traceability
Industry 4.0: Who Benefits?
Stop the SMT Conspiracy, Part 2: Abduction
The Future of SMT: Welcome to the 4th Dimension