- News
- Books
Featured Books
- I-Connect007 Magazine
Latest Issues
Current Issue
Beyond the Rulebook
What happens when the rule book is no longer useful, or worse, was never written in the first place? In today’s fast-moving electronics landscape, we’re increasingly asked to design and build what has no precedent, no proven path, and no tidy checklist to follow. This is where “Design for Invention” begins.
March Madness
From the growing role of AI in design tools to the challenge of managing cumulative tolerances, these articles in this issue examine the technical details, design choices, and manufacturing considerations that determine whether a board works as intended.
Looking Forward to APEX EXPO 2026
I-Connect007 Magazine previews APEX EXPO 2026, covering everything from the show floor to the technical conference. For PCB designers, we move past the dreaded auto-router and spotlight AI design tools that actually matter.
- Articles
- Columns
- Links
- Media kit
||| MENU - I-Connect007 Magazine
Estimated reading time: 1 minute
All About Flex: Flexible Circuits and Kaizen Events
All Flex uses a variety of different tools and techniques in its continuous improvement efforts. A Kaizen event or Blitz is one technique that has resulted in significant improvements in our yields, productivity and customer satisfaction. A Kaizen event is a short-term effort using a dedicated team that is highly focused on improving a narrowly defined process. Kaizen teams usually consist of 3–8 members that include operators, engineers and other support personnel. The implementation phase of the event usually lasts 3–6 working days and the team members are removed from their daily duties to focus 100% of their time on the Kaizen effort. A Kaizen event is highly structured, and while the exact steps may vary from project to project, the process consists of three phases:
- Planning and preparation
- Implementation
- Follow-up and tracking
Action items, analysis and recommendations are formally documented during each phase. The first step is to select and define the project. Kaizen events, as well as other improvement efforts, are selected based on a Pareto analysis that is presented to the management team. Selection is based on the process improvement that would have the biggest impact on one of the following:
- Scrap
- Throughput
- Quality
- Customer satisfaction
The planning and preparation phase of a Kaizen blitz can take 2–6 weeks. During this phase, the project charter is defined, a team is chosen, data collected and project orientation is performed. The Kaizen event can be disruptive, so the affected departments need to plan on how to deal with the potential disruptions.
Editor's Note: This article is originally published in the April 2016 issue of The PCB Magazine.
More Columns from All About Flex
All About Flex: Terms and ConditionsAll About Flex: ISO 9001 Basics
All About Flex: FAQs on UL Listings for Flexible Circuits
All About Flex: Avoiding Trace Fracturing in a Flexible Circuit
Polyimide vs. Silicone for Flexible Heaters
All About Flex: Copper Thickness Requirements for Flex Circuits
All About Flex: Copper Grain Direction
All About Flex: Options for Purchasing Flexible Heaters