-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueInventing the Future with SEL
Two years after launching its state-of-the-art PCB facility, SEL shares lessons in vision, execution, and innovation, plus insights from industry icons and technology leaders shaping the future of PCB fabrication.
Sales: From Pitch to PO
From the first cold call to finally receiving that first purchase order, the July PCB007 Magazine breaks down some critical parts of the sales stack. To up your sales game, read on!
The Hole Truth: Via Integrity in an HDI World
From the drilled hole to registration across multiple sequential lamination cycles, to the quality of your copper plating, via reliability in an HDI world is becoming an ever-greater challenge. This month we look at “The Hole Truth,” from creating the “perfect” via to how you can assure via quality and reliability, the first time, every time.
- Articles
- Columns
- Links
- Media kit
||| MENU - pcb007 Magazine
Happy’s Essential Skills: Engineering Economics (ROI)
August 10, 2016 | Happy HoldenEstimated reading time: 7 minutes

Engineering economics is fundamental in engineering, especially for manufacturing support. For simplicity, I am using the term here as a process engineer for printed circuit equipment and automation of production. Principles of Engineering Economy[1], written by Stanford University Professor Dr. Grant Ireson, is the text that I used and one of the basics for understanding engineering economics.
Interest Variables
Here are the five primary variables that make up all of the interest formulas for the time value of money:
I = interest rate per period
n = number of interest periods
PV = present sum of money
FV = future sum of money after n periods at i interest
PMT = end of period payment
All of these calculations lend themselves for use in spreadsheets and are found as part of MS Excel.
Interest Formulas
The interest formulas for these calculations are defined and seen below. For some reason, each of these formulas have been given a specific name and abbreviation. Single amounts do not have an apostrophe after the three-letter-acronym (tla). A series of amounts have the apostrophe (‘). The short-cut way of writing this out is to use this form:
(tla-interest rate-period) seen as: (caf’-6%-10)
- Single Payment-Compound Amount Factor (caf’) for future value (FV) based on the present value (PV):
FV=PV(1+i)^n (caf')
- Single Payment-Present Worth Factor (pwf’) for present value (PV) based on the FV
PV=FV[1/(1+i)^n] (pwf')
- Series Sinking fund factor (sff) for series payment (PMT) based on the FV
PMT=FV[i/(1+i)^n-1] (sff)
- Series Compound Recovery Factor (crf) for series payment (PMT) based on the PV
PMT=PV[i(1+i)^n/(1+i)^n-1] (crf)
or PMT=PV[i/{(1+i)^n-1}+i]
- Series Compound Amount Factor (caf) for future value based on the payments
FV=PMT[(1+i)^n-1/i] (caf)
- Series Present Worth Factor (pwf) for PV based on the series of payments
PV=PMT[(1+i)^n-1/i(1+i)^n] (pwf)
Or PV=PMT[1/{i/(1+i)^n-1}+i]
Examples using Three Variables
You can see how all of these financial formulas are related by looking at the examples in Figure 1. We start with just three variables: present value (PV) = $1000; period of 10 years (N); and annual interest rate of 6%.
1. We start with $1000 (PV) and want to know what it is worth after 10 years with an interest rate of 6% per year. The caf’ equation is used: (caf’-6%-10). The future value (FV) is $1791.
2. What if we want to know what the FV would be if we withdraw it six years early? The pwf’ is used: (pwf’-6%-6) and the PV is $1263.
3. What PV would it take seven years earlier to get this $1263? Again, pwf’ is used: (pwf’-6%-7) and a PV of $840 would be required.
4. If we took the $840 and invested it over 10 years what payments would we receive at 6% interest? The crf is used (crf-6%-10) to get a payment (PMT) of $114/period.
5. If instead we made payments of $114 per period for 10 years, what would that be worth now? The caf equation is used (caf-6%-10) and the future value (FV) is $1504.
6. What annual payment is required to get $1504 over seven years? The sff equation is used (sff-6%-7) and PMT would be $179/ year.
7. What present value would $179 in interest income at 6% give us over seven years? The pwf is used (pwf-6%-7) and the V is $1000, the same as we started with.
Figure 1: Seven financial calculations all involving $1000 at 6% interest over various years.
Important Engineering Metrics
- ROI (return on investment) is the equivalent bank interest rate of all the money you spent and all the profits you made over a fixed time span
- NPV (net present value) is the current value of all the cash flows over time assuming cash is worth, x %, say 3 % as an interest rate.
- BET is the breakeven time (or the time to money) before the profits you gain pay for all that you spent to get the profits. Or, how long before you truly make a PROFIT?
- TVM is the time value of money. Because of inflation, future money is worth less than current money, or it is discounted.
- DEPRECIATION is the value of equipment that the government lets you deduct each year as equipment gets older. This encourages you to buy new equipment. Some may be depreciated very fast, perhaps in three years instead of five.
The common practice in equipment justification is to calculate the ROI or the NPV of the cash flows associated with implementing the equipment, including all purchases of equipment, installation, taxes (depreciation), water treatment savings and operating costs against the labor saving, and yield improvement by NOT installing automation.
The rate of return is easiest calculated by Excel. To do it manually requires a trial-and-error calculation of assuming an interest rate (I) over the period of the investment (n) and calculating the compound recovery factors (crf) for each year. When the sum of all the crfs equals the initial investment, then the interest rate is the ROI.
The NPV is easier to calculate. It is the present worth factor (pwf) for all the cash flows each year for the life of the investment using current or future interest rates.
The classical trade-off is between the purchase of an automated system (and its advantages) and the continued increase in direct labor. But quality, process yields and waste water treatment costs also enter into the calculation. Return on investment is the calculation of the equivalent interest rate of all the moneys invested based on all the cash flows over the useful life of the equipment.
Page 1 of 2
Testimonial
"We’re proud to call I-Connect007 a trusted partner. Their innovative approach and industry insight made our podcast collaboration a success by connecting us with the right audience and delivering real results."
Julia McCaffrey - NCAB GroupSuggested Items
Trouble in Your Tank: Minimizing Small-via Defects for High-reliability PCBs
08/27/2025 | Michael Carano -- Column: Trouble in Your TankTo quote the comedian Stephen Wright, “If at first you don’t succeed, then skydiving is not for you.” That can be the battle cry when you find that only small-diameter vias are exhibiting voids. Why are small holes more prone to voids than larger vias when processed through electroless copper? There are several reasons.
The Government Circuit: Navigating New Trade Headwinds and New Partnerships
08/25/2025 | Chris Mitchell -- Column: The Government CircuitAs global trade winds continue to howl, the electronics manufacturing industry finds itself at a critical juncture. After months of warnings, the U.S. Government has implemented a broad array of tariff increases, with fresh duties hitting copper-based products, semiconductors, and imports from many nations. On the positive side, tentative trade agreements with Europe, China, Japan, and other nations are providing at least some clarity and counterbalance.
How Good Design Enables Sustainable PCBs
08/21/2025 | Gerry Partida, Summit InterconnectSustainability has become a key focus for PCB companies seeking to reduce waste, conserve energy, and optimize resources. While many discussions on sustainability center around materials or energy-efficient processes, PCB design is an often overlooked factor that lies at the heart of manufacturing. Good design practices, especially those based on established IPC standards, play a central role in enabling sustainable PCB production. By ensuring designs are manufacturable and reliable, engineers can significantly reduce the environmental impact of their products.
50% Copper Tariffs, 100% Chip Uncertainty, and a Truce
08/19/2025 | Andy Shaughnessy, I-Connect007If you’re like me, tariffs were not on your radar screen until a few months ago, but now political rhetoric has turned to presidential action. Tariffs are front-page news with major developments coming directly from the Oval Office. These are not typical times. President Donald Trump campaigned on tariff reform, and he’s now busy revamping America’s tariff policy.
Global PCB Connections: Understanding the General Fabrication Process—A Designer’s Hidden Advantage
08/14/2025 | Markus Voeltz -- Column: Global PCB ConnectionsDesigners don’t need to become fabricators, but understanding the basics of PCB fabrication can save you time, money, and frustration. The more you understand what’s happening on the shop floor, the better you’ll be able to prevent downstream issues. As you move into more advanced designs like HDI, flex circuits, stacked vias, and embedded components, this foundational knowledge becomes even more critical. Remember: the fabricator is your partner.