NASA Seeks Input from U.S. Industry on Artemis Lander Development
July 22, 2019 | NASAEstimated reading time: 3 minutes
In a major step toward returning astronauts to the surface of the Moon under the Artemis lunar exploration program and preparing for future missions to Mars, NASA is seeking comments from American companies interested in providing an integrated human landing system to put the first woman and next man on the Moon by 2024.
The agency’s internal studies point toward a three-stage human landing system, but NASA is also interested in alternative approaches that can accomplish the same long-term goals of global lunar access and a reusable landing system. The three-stage concept includes a transfer element for the journey from the lunar Gateway to low-lunar orbit, a descent element to carry the crew to the surface, and an ascent element to return them to the Gateway. From there, they would board Orion for the 250,000-mile trip back to Earth.
Private sector innovation is key to NASA’s goal of sustainable lunar exploration and the agency’s many public-private partnerships are already advancing capabilities for human spaceflight in deep space while stimulating commercial activities.
“The Gateway will be our home base in lunar orbit – it is our command and service module for missions to the surface of the Moon. Using it as a port for the human landing system, its orbit around the Moon will give us access to the entire lunar surface, and a place to refurbish and refuel the landing system,” said NASA Administrator, Jim Bridenstine. “This is no small feat, and building a 21st century landing system takes the best of our government and private-sector teams.”
NASA published the draft solicitation under Appendix H of the second Next Space Technologies for Exploration Partnerships (NextSTEP-2) Broad Agency Announcement (BAA). Depending on the responses from industry, which are due August 2, NASA may elect to do one more draft before finalizing the solicitation.
"As part of our efforts to accelerate our return to the Moon, we're putting out this draft solicitation earlier than is typical," said Marshall Smith, director of human lunar exploration programs at NASA Headquarters in Washington. “We want to make sure the final solicitation released reflects what NASA and industry think is the best approach to meeting our goals.”
The first stop on the lunar surface will be the South Pole region. Believed to contain water ice and potentially rich in other resources, the region is a good target for future human landing, and one the agency has already studied heavily with robots. Though far from the Apollo landing sites near the lunar equator, NASA’s Lunar Reconnaissance Orbiter has collected precise information offering details about the South Pole’s topography, temperature and locations of likely frozen water – a necessity for sustainable human exploration.
While water ice is important for sustaining human life, it has other qualities that sustain lunar exploration as well. Through other initiatives, the agency also is looking at refueling capabilities to make the landing system reusable and working on in-situ resource utilization technologies to make rocket propellants using water ice and regolith from the Moon. Once the ability to harness resources becomes viable, NASA could refuel lunar lander elements with the Moon’s own resources.
Key pieces for a human lunar return are increasing at an accelerated pace:
- NASA is already working with 11 companies to conduct risk-reduction studies and build component-level prototypes for the integrated human landing system.
- In May, NASA awarded a contract to Maxar Technologies to build, launch, and demonstrate in space the first Gateway element, the power and propulsion element.
- In June, the agency issued a draft solicitation for lunar cargo delivery services.
- NASA has indicated intent to procure a Gateway crew cabin from a single U.S. provider. That, together with the power and propulsion element, will comprise the Phase 1 Gateway.
Ahead of sending astronauts to the Moon, the agency will use a series of commercial Moon deliveries to send science instruments and technology demonstrations to the surface to continue studying Earth’s nearest neighbor.NASA’s human lunar exploration plans are based on a two-phase approach: the first is focused on speed – landing on the Moon within five years, while the second will establish a sustained human presence on and around the Moon by 2028. The agency will use what we learn on the Moon to prepare for the next giant leap – sending astronauts to Mars.
For more information about NASA’s Moon to Mars exploration plans, visit: https://www.nasa.gov/moontomars.
Testimonial
"Advertising in PCB007 Magazine has been a great way to showcase our bare board testers to the right audience. The I-Connect007 team makes the process smooth and professional. We’re proud to be featured in such a trusted publication."
Klaus Koziol - atgSuggested Items
Sensors: The Invisible Force Behind Modern Convenience and Safety
10/24/2025 | Sanjeev Mane, Brooks AutomationSensors and sensor technology are fundamental components of modern life that drive innovation across various electronics and devices. From smartphones to industrial machinery, these small but powerful tools enable seamless interaction with the environment, ensuring efficiency and safety. This article serves as an introduction and overview of sensor technology, highlighting its significance in modern applications and its growing importance in the market as we embrace smarter, more connected systems.
Technica USA Partners with Creative Electron
10/22/2025 | Technica USATechnica USA is proud to announce the partnership with Creative Electron Inc. located in San Marcos, CA.
MES Software Tools Need Thoughtful Integration
10/21/2025 | Nolan Johnson, SMT007 MagazineThe Global Electronics Association recently published a survey report on the state of EMS production software. This project, led by Thiago Guimaraes, director of industry intelligence, connects the dots across the global electronics value chain to uncover practical insights that individual companies might not have seen on their own. In this interview, Thiago discusses the whys and hows of this report.
Light-curable Solutions for Reliable Electronics in Space Applications
10/15/2025 | Virginia Hogan, DymaxDesigning electronics for space environments, particularly those in low Earth orbit (LEO), requires careful consideration of materials that can withstand extreme conditions while supporting long-term reliability. Engineers designing satellite systems, aerospace instrumentation, and high-altitude platforms face a familiar set of challenges: contamination control, mechanical stress, thermal cycling, and manufacturability.
Analog Devices Launches ADI Power Studio™ and New Web-Based Tools
10/14/2025 | Analog Devices, Inc.Analog Devices, Inc., a global semiconductor leader, announced the launch of ADI Power Studio, a comprehensive family of products that offers advanced modeling, component recommendations and efficiency analysis with simulation. In addition, ADI is introducing early versions of two new web-based tools with a modernized user experience under the Power Studio umbrella: