-
-
News
News Highlights
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueSpotlight on India
We invite you on a virtual tour of India’s thriving ecosystem, guided by the Global Electronics Association’s India office staff, who share their insights into the region’s growth and opportunities.
Supply Chain Strategies
A successful brand is built on strong customer relationships—anchored by a well-orchestrated supply chain at its core. This month, we look at how managing your supply chain directly influences customer perception.
What's Your Sweet Spot?
Are you in a niche that’s growing or shrinking? Is it time to reassess and refocus? We spotlight companies thriving by redefining or reinforcing their niche. What are their insights?
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
ifm Relies on Automated Component Storage from Totech
December 6, 2019 | Super Dry TotechEstimated reading time: 1 minute

Totech today announced another strong partnership with ifm electronic GmbH, a global progressive sensor and automation company, headquartered in Germany. The Totech Dry Tower, a fully automated SMD warehouse, will be installed at the ifm electronic Bechlingen location in Tettnang at the beginning of next year.
After several months of intensive project work with the ifm team, an exciting concept has been finalised that meets the technical requirements of modern SMD production and, at the same time, offers great savings potential.
Brief summary of the overall Dry Tower project:
- Dimensions of the storage system (LxWxH): 4.1mx5.3mx6m, with space for up to 13,000 reels of mixed sizes.
- The future-proofing option of doubling the storage area is accounted for with the modular design.
- The Dry Tower will be erected on the 1st floor above the set-up area to save storage space.
- Storage is via trolleys with space for up to 60 reels.
- A total of up to 4 set-up stations are supplied with material.
- The material is removed from storage in accordance with a defined optimum setup sequence.
- The MSL open times are stopped and logged in the Dry Tower - expired reels are blocked for retrieval until floor life has been reset.
- Expired MSL components are actively dried in the Dry Tower and only then released for production.
- Software interfaces to ASM, Fuji and ifm internal software applications.
According to Bernhard Joos, Head of Department for Central Prefabrication at ifm electronic GmbH and the person responsible for the project, there were several key criteria which drove the investment in Totech's Dry Tower; High efficiency and stability in the storage and set-up processes; High storage volume/area; Modular design and resulting scalability; and Controlled MSL processes.
After completion of a new logistics hall, the installation is planned for the first quarter of 2020.
Testimonial
"The I-Connect007 team is outstanding—kind, responsive, and a true marketing partner. Their design team created fresh, eye-catching ads, and their editorial support polished our content to let our brand shine. Thank you all! "
Sweeney Ng - CEE PCBSuggested Items
A.R.T. Invests in Latest Equipment to Further Enhance Electronics Training Facilities
09/17/2025 | A.R.T. Ltd.Advanced Rework Technology Ltd. (A.R.T.), a leading independent IPC-accredited training provider, has announced a series of new equipment investments at its state-of-the-art training centre.
Richardson Electronics Appoints Daniel Albers to Drive Made-in-USA Contract Manufacturing Expansion
09/17/2025 | Globe NewswireRichardson Electronics, Ltd., a global provider of engineered solutions for the green energy, power management, and custom display markets, announced the appointment of Daniel Albers to spearhead business development for its expanded, Made-in-USA contract manufacturing efforts.
STMicroelectronics to Advance Next-generation Chip Manufacturing Technology with New PLP Pilot Line in Tours, France
09/17/2025 | STMicroelectronicsSTMicroelectronics, a global semiconductor leader serving customers across the spectrum of electronics applications, today announced new details regarding the development of the next generations of Panel-Level Packaging (PLP) technology through a pilot line in its Tours site, France, which is expected to be operational in Q3 2026.
Indium President and CEO to Deliver ELCINA CEO Forum Keynote at Productronica India
09/17/2025 | Indium CorporationIndium Corporation President and CEO Ross Berntson will deliver the Electronic Industries Association of India (ELCINA) CEO Forum keynote at Productronica India, to be held September 17-19 in Bengaluru, India.
TTCI and The Training Connection Strengthen Electronics Manufacturing with Test Services and Training at PCB West 2025
09/16/2025 | The Test Connection Inc.The Test Connection Inc. (TTCI), a trusted provider of electronic test and manufacturing solutions, and The Training Connection LLC (TTC-LLC) will exhibit at PCB West 2025, taking place Wednesday, October 1, 2025, at the Santa Clara Convention Center in California. Visitors are invited to Booth 113 to explore the companies’ complementary expertise in test engineering services and workforce development for the electronics industry.