Spaceflight Inc. Signs Multi-Launch Agreement with SpaceX for Rideshare Services
June 18, 2020 | Business WireEstimated reading time: 2 minutes
Spaceflight Inc., the leading satellite rideshare and mission management provider, announced it inked an agreement with SpaceX to secure rideshare capacity on multiple launches. This agreement between the two companies secures Spaceflight capacity to launch manifest payloads on several SpaceX launches through the end of 2021, providing launch schedule assurance to smallsat customers needing frequent, reliable, and cost-effective launches to Sun-synchronous orbit.
“By offering a variety of launch options, we can better meet our customers’ specific launch needs and offer increased launch flexibility," said Curt Blake, president and CEO of Spaceflight. “This agreement with SpaceX will be particularly attractive to smallsat customers. SpaceX's consistent launch schedule, coupled with our deep expertise in mission management and integration services, offers rideshare options with greater reliability. This agreement will allow us to package multiple payloads onto a single port to significantly reduce the cost per spacecraft for the end-customer.”
According to a recent research study by Bryce Space and Technology, delays are commonplace throughout the launch industry. “Launch delays are inevitable and are typically out of the control of rideshare customers. In order to offer launch flexibility and minimize the impact of significant delays, it’s critical to have capacity on a wide range of launches to easily re-manifest customers from one launch to another,” said Devon Papandrew, vice president of business operations at Spaceflight. “Having this guaranteed capacity with SpaceX improves our customers’ odds of getting on orbit when they need to and helps us ensure flights are as full as possible, lowering costs for all and minimizing environmental impacts.”
The agreement builds on a long-standing relationship between the two companies. Spaceflight and SpaceX have partnered for several industry firsts, including SSO-A, the first dedicated rideshare mission with 64 smallsats aboard a Falcon 9 in December 2018. Additionally, Spaceflight and SpaceX teamed up on the first-ever rideshare mission to Geosynchronous Transfer Orbit carrying a commercial lunar lander in February 2019. Spaceflight also announced today it will launch two rideshare payloads aboard SpaceX’s tenth Starlink mission, marking the first SpaceX Starlink mission that will be accompanied by Spaceflight rideshare payloads.
“Spaceflight is one of the most experienced companies offering mission management and integration services for smallsat operators, and we are proud to offer their customers the best launch solution on the market,” says SpaceX Vice President of Commercial Sales Tom Ochinero. “Together, Spaceflight and SpaceX are providing small satellite operators access to space in the most reliable and cost-effective way possible.”
Spaceflight works with a large portfolio of launch vehicles, including Falcon 9, Antares, Electron, Vega, and PSLV, to provide a variety of launch options to its customers. The company has launched more than 270 satellites across nearly 30 rideshare missions. In 2019, the company successfully executed nine missions, the most it’s ever launched in one year, sending more than 50 payloads to space.
Testimonial
"Our marketing partnership with I-Connect007 is already delivering. Just a day after our press release went live, we received a direct inquiry about our updated products!"
Rachael Temple - AlltematedSuggested Items
Ventec Evaluates US Manufacturing Facility to Support North American Growth
04/28/2026 | Ventec International GroupVentec International Group today announced that it is evaluating the potential establishment of a manufacturing facility in the United States to support its growing North American customer base with high-performance laminate and prepreg materials.
The Chemical Connection: When the Industry Moves Faster Than the Standards
04/29/2026 | Don Ball -- Column: The Chemical ConnectionAs a supplier of wet processing equipment, we have rules and standards we must adhere to, including both regional and national electrical codes and safety and environmental regulations, as well as myriad other standards to make the equipment safe to use. Things are a little different when it comes to rules and standards for manufacturing PCBs, though, because technical advances and requirements change so quickly that standards can’t keep up.
Cicor Secures New Customers in Q1
04/14/2026 | CicorCicor Group recorded a strong order intake in the first quarter of 2026, in particular driven by the Aerospace & Defence (A&D) market.
Standard of Excellence: Engineering Is the New Sales—How Technical Collaboration Wins Business
04/15/2026 | Anaya Vardya -- Column: Standard of ExcellenceWhen it comes to complex, high-performance electronics, the line between sales and engineering has all but disappeared. Customers want more than a quote. They’re not simply buying boards; they’re buying understanding, so engineering is now the front line of customer trust, problem-solving, and long-term success. There was a time when sales meant persuasion, and engineering meant production. Today, the two are inseparable.
Technica Announces Tech Day Event Dates and Agenda
04/13/2026 | Technica USATechnica USA announced today the return of its highly anticipated Tech Day events, marking the revival of a long‑standing customer engagement series. Personal invitations have been issued to customers detailing event dates, participating partners, and the technical agenda.