U.S. Navy Approves Full-Rate Production for Lockheed Martin's Sikorsky CH-53K Helicopter
December 28, 2022 | Lockheed MartinEstimated reading time: 1 minute
The U.S. Navy declared full-rate production of the Sikorsky CH-53K helicopter, a decision that is expected to increase production to more than 20 helicopters annually in the coming years. Sikorsky, a Lockheed Martin company, is procuring long-lead items and critical materials to support building full rate production CH-53K helicopters in its digital factory.
“Ramping up production of the most technologically advanced helicopter in the world allows the U.S. Marine Corps to build out its CH-53K King Stallion fleet and support mission success,” said Bill Falk, director of the Sikorsky CH-53K program. “This production authorization stabilizes Sikorsky’s domestic supply chain and is a testament to our enduring partnership with the Marine Corps.”
Milestone Benefits More Than 200 CH-53K Suppliers Nationwide
This full-rate production decision instills confidence in the diverse network of more than 200 CH?53K suppliers across 34 states. The Marine Corps’ commitment to the CH-53K will allow suppliers to purchase in bulk, creating efficiencies and driving down overall costs for the U.S. military and international allies.
The Marine Corps’ approved acquisition objective is 200 aircraft.
The U.S. Marine Corps declared Initial Operational Capability (IOC) for the CH-53K helicopter in April 2022, validating the platform’s operational readiness to forward deploy Marines and equipment across the globe.
The CH?53K is a multi-mission helicopter with heavy-lift capabilities that exceed all other U.S. Department of Defense rotary wing aircraft and is the only heavy-lift helicopter that will remain in production through 2032 and beyond. The CH-53K can carry a 27,000-pound external load over 110 nautical miles in high/hot conditions, which is more than triple the external load carrying capacity of the legacy CH-53E aircraft.
The CH-53K King Stallion is designed to conduct expeditionary assault transport of armored vehicles, equipment, and personnel to support distributed operations deep inland from a sea-based center of operations, critical in the Indo-Pacific region. The CH-53K is a digitally designed, market available aircraft, enabling a range of operations such as humanitarian relief, firefighting and search and rescue.
Suggested Items
Intervala Hosts Employee Car and Motorcycle Show, Benefit Nonprofits
08/27/2024 | IntervalaIntervala hosted an employee car and motorcycle show, aptly named the Vala-Cruise and it was a roaring success! Employees had the chance to show off their prized wheels, and it was incredible to see the variety and passion on display.
KIC Honored with IPC Recognition for 25 Years of Membership and Contributions to Electronics Manufacturing Industry
06/24/2024 | KICKIC, a renowned pioneer in thermal process and temperature measurement solutions for electronics manufacturing, is proud to announce that it has been recognized by IPC for 25 years of membership and significant contributions to electronics manufacturing.
Boeing Starliner Spacecraft Completes Successful Crewed Docking with International Space Station
06/07/2024 | BoeingNASA astronauts Barry "Butch" Wilmore and Sunita "Suni" Williams successfully docked Boeing's Starliner spacecraft to the International Space Station (ISS), about 26 hours after launching from Cape Canaveral Space Force Station.
KIC’s Miles Moreau to Present Profiling Basics and Best Practices at SMTA Wisconsin Chapter PCBA Profile Workshop
01/25/2024 | KICKIC, a renowned pioneer in thermal process and temperature measurement solutions for electronics manufacturing, announces that Miles Moreau, General Manager, will be a featured speaker at the SMTA Wisconsin Chapter In-Person PCBA Profile Workshop.
The Drive Toward UHDI and Substrates
09/20/2023 | I-Connect007 Editorial TeamPanasonic’s Darren Hitchcock spoke with the I-Connect007 Editorial Team on the complexities of moving toward ultra HDI manufacturing. As we learn in this conversation, the number of shifting constraints relative to traditional PCB fabrication is quite large and can sometimes conflict with each other.