-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueDon’t Just Survive, Thrive
If we are to be relevant and prosper during these next critical decades in electronics, we must do more than survive. As an industry, we can and must thrive. In this issue, our contributors explore these concepts meant to help you take your business to the next level.
Material Matters
Materials management is nuanced, multifaceted, and requires a holistic systems approach for business success. When building high mix, low volume, and high technology, managing materials and overall cost containment are even greater challenges.
Additive Manufacturing
In this month’s issue, we explore additive manufacturing technology for the PCB fabricator: where it stands today, the true benefits, and where it seems to be headed.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - pcb007 Magazine
Happy’s Essential Skills: Project/Program Management
July 27, 2016 | Happy HoldenEstimated reading time: 13 minutes
![](https://iconnect007.com/application/files/4417/1686/6064/happy_holden_col_300.jpg)
My first opportunity to use the Gantt Chart was as part of my Senior Project while in college. At that time, it was all manual. Today, numerous software packages offer it along with other project visibility techniques (Figure 1):
- Gantt Chart
- Pert Chart
- Critical Path Analysis
- Affinity Diagrams
- Gap Analysis
- TimeLine
Figure 1: Some of the visualization tools used for project management
No matter what your job, you may have to manage, or play an active role in, a project at some point during your career. It takes a great deal of skill to do this well, but the time you invest in building good project management skills can pay off enormously.
You contribute to meeting an organization's objectives by completing projects on time and on budget. This can produce real business results and enhance your reputation. And when you know how to organize, schedule and delegate tasks, you make yourself more visible for promotions.
Gantt Chart
In the late 1800s, Polish engineer Karol Adamiecki developed a visual work flow chart that he called a "harmonogram."
In around 1910, Henry Gantt, a management consultant and engineer, took Adamiecki's concept to the next stage. His chart was designed to help manufacturing supervisors see whether their work was on, ahead of, or behind schedule, and it formed the foundation of the tool we use today.
When you set up a Gantt chart, you need to think through all of the tasks involved in your project. As part of this process, you'll work out who will be responsible for each task, how long each task will take, and what problems your team may encounter. This detailed thinking helps you ensure that the schedule is workable, that the right people are assigned to each task, and that you have workarounds for potential problems before you start. They also help you work out practical aspects of a project, such as the minimum time it will take to deliver, and which tasks need to be completed before others can start. Plus, you can use them to identify the critical path—the sequence of tasks that must individually be completed on time if the whole project is to deliver on time.
Finally, you can use them to keep your team and your boss informed of progress. Simply update the chart to show schedule changes and their implications, or use it to communicate that key tasks have been completed, as seen in Figure 2.
Figure 2: Example of a Gantt chart.
Page 1 of 5
Suggested Items
Airbus to Lead NATO Next Generation Rotorcraft Capability Concept Study
07/26/2024 | AirbusThe NATO Support and Procurement Agency (NSPA) has awarded a contract to Airbus Helicopters to lead a concept study in the frame of the Next Generation Rotorcraft Capability (NGRC) project under which the participants combine efforts to work on design, development and delivery of a medium multi-role helicopter.
We Energies, Foxconn Complete Clean Energy Project in Wisconsin
07/25/2024 | FoxconnWe Energies, a Wisconsin-based utility company of WEC Energy Group, and Hon Hai Technology Group (Foxconn) are pleased to announce the completion of a solar panel installation project at Foxconn’s Science and Technology Park in Mount Pleasant, Wisconsin.
BAE Systems to Deliver Advanced Microelectronics to U.S. Defense Industrial Base
07/23/2024 | BUSINESS WIREThe contract will support the Strategic Transition of Microelectronics to Accelerate Modernization by Prototyping and Innovating in the Packaging Ecosystem (STEAM PIPE) project and will be managed by National Security Technology Accelerator (NSTXL).
SIA Applauds CHIPS Act Incentives for GlobalWafers Projects in Texas and Missouri
07/18/2024 | SIAThe Semiconductor Industry Association (SIA) released the following statement from SIA President and CEO John Neuffer applauding semiconductor manufacturing incentives announced by the U.S. Department of Commerce and GlobalWafers.
Global Flexible Substrate Market Size To Worth USD 2520.19 Million by 2033; CAGR Of 14.50%
07/16/2024 | Globe NewswireThe Global Flexible Substrate Market Size is to Grow from USD 650.62 Million in 2023 to USD 2520.19 Million by 2033, at a Compound Annual Growth Rate (CAGR) of 14.50% during the projected period.