-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueBox Build
One trend is to add box build and final assembly to your product offering. In this issue, we explore the opportunities and risks of adding system assembly to your service portfolio.
IPC APEX EXPO 2024 Pre-show
This month’s issue devotes its pages to a comprehensive preview of the IPC APEX EXPO 2024 event. Whether your role is technical or business, if you're new-to-the-industry or seasoned veteran, you'll find value throughout this program.
Boost Your Sales
Every part of your business can be evaluated as a process, including your sales funnel. Optimizing your selling process requires a coordinated effort between marketing and sales. In this issue, industry experts in marketing and sales offer their best advice on how to boost your sales efforts.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - smt007 Magazine
Five Key Components of an NPI Report
May 16, 2019 | Neil Sharp, JJS ManufacturingEstimated reading time: 3 minutes
Taking a new product from initial design through to final production requires care and attention at every step of the process. Thus, it's vital to entrust your new product introduction (NPI) to a contract manufacturer that has the right methodology.
A “new product” is any product or product variant that your electronics manufacturing services (EMS) provider hasn’t built for you before. It may be an item that’s still at the prototype stage, an up-issue to an existing design, or a product that has already been outsourced but that you’ve chosen to transfer to a new assembly partner.
If you’ve opted to hand over this process to an EMS provider, then you must verify their NPI procedures before work begins. Every assembly partner is different and likely to have their own unique approach to how they see through the creation of new products within their own manufacturing environment. However, one of the critical elements for success is the provision of an NPI report, which will accompany the delivery of your first batch of assemblies.
An NPI report is an opportunity for your contract manufacturer to highlight any outstanding issues that will need to be addressed for future builds. And the information that your EMS partner provides can play a pivotal role in ensuring that they continue to deliver your products on time, within budget, and to the highest quality standards.
So, what exactly should an NPI report look like? Here are five key components.
1. Basic Details of the Build
An NPI report should begin by providing a written record of the crucial details of the job. This will include the following:
- The product name and date of manufacture
- An overview of the product accompanied by pictures and a brief description
- A list of all the subassembly part numbers and revisions
- A compilation of the drawings, information, and data used during the build
- The Restriction of Hazardous Substances (RoHS) status of the project
- A description of any applicable build or quality standards
2. How the Product Was Built
This aspect of the NPI report should describe the processes the product went through, including the equipment that was used and a description of any special tooling. While an overview may be all that’s required, your EMS partner may choose to provide more detail, which will be helpful in avoiding or resolving any future problems.
3. Internal Feedback and Observations
This element provides a candid summary of fundamental observations of each stage of the NPI process from procurement of materials to assembly, test, inspection, and packaging. Inviting internal feedback at each stage provides a valuable opportunity for everyone involved in the build to contribute their comments, suggestions, or concerns. It can also be hugely useful as a checklist to refer to if any issues arise later on.
4. Suggestions for Improvement
Wherever possible, an NPI report should describe and justify any recommendations that will improve any element of the product or processes. These might include amendments to the supply of materials or the manufacturing process, changes to documentation, or even tweaks to the product design itself.
5. What Needs to Happen Next
The final stage of the report should provide a brief summary of what action needs to be taken, who’s accountable for which tasks, and the deadline for completion. Making sure that everyone understands their roles and responsibilities will be vital in eliminating errors and ensuring the success of future builds. Any product or product variant that’s being built for the first time needs to be put through a robust NPI process to ensure that future production volumes can be efficiently achieved.
Working with an EMS partner who understands the unique requirements of each key step of the NPI process will ensure a product that launches on time, stays within budget, and meets (or exceeds) your quality and service expectations.
Neil Sharp is the director of marketing for JJS Manufacturing.
Suggested Items
Real Time with… IPC APEX EXPO 2024: Tools, Training, and Trends in Manufacturing Engineering
04/25/2024 | Real Time with...IPC APEX EXPOGuest Editor Kelly Dack and Product Specialist Erik Bateham of Polar Instruments discuss Polar's latest technology, including their role in aiding manufacturing engineers. They highlight the advanced capabilities of Polar's tools and the critical role of signal integrity analysis, as well as the importance of accurate modeling in board manufacturing. Polar's unique training approach and demonstration contact details are also explored.
TTM Celebrates the Grand Opening of Its First Manufacturing Facility in Penang
04/25/2024 | TTM Technologies, Inc.TTM Technologies, Inc., a leading global manufacturer of technology solutions including mission systems, radio frequency (RF) components and RF microwave/microelectronic assemblies, and quick-turn and technologically advanced printed circuit boards (PCBs), officially opened its first manufacturing plant in Penang, Malaysia with an investment of USD200 million (approximately RM958 million).
Listen Up! The Intricacies of PCB Drilling Detailed in New Podcast Episode
04/25/2024 | I-Connect007In episode 5 of the podcast series, On the Line With: Designing for Reality, Nolan Johnson and Matt Stevenson continue down the manufacturing process, this time focusing on the post-lamination drilling process for PCBs. Matt and Nolan delve into the intricacies of the PCB drilling process, highlighting the importance of hole quality, drill parameters, and design optimization to ensure smooth manufacturing. The conversation covers topics such as drill bit sizes, aspect ratios, vias, challenges in drilling, and ways to enhance efficiency in the drilling department.
Elevating PCB Design Engineering With IPC Programs
04/24/2024 | Cory Blaylock, IPCIn a monumental stride for the electronics manufacturing industry, IPC has successfully championed the recognition of the PCB Design Engineer as an official occupation by the U.S. Department of Labor (DOL). This pivotal achievement not only underscores the critical role of PCB design engineers within the technology landscape, but also marks the beginning of a transformative journey toward nurturing a robust, skilled workforce ready to propel our industry into the future.
Fujitsu, METRON Collaborate to Drive ESG Success
04/24/2024 | JCN NewswireFujitsu Limited and METRON SAS, a French cleantech company specializing in energy management solutions for industrial decarbonization, today announced a strategic initiative to contribute to the realization of carbon neutrality in the manufacturing industry.