-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueBox Build
One trend is to add box build and final assembly to your product offering. In this issue, we explore the opportunities and risks of adding system assembly to your service portfolio.
IPC APEX EXPO 2024 Pre-show
This month’s issue devotes its pages to a comprehensive preview of the IPC APEX EXPO 2024 event. Whether your role is technical or business, if you're new-to-the-industry or seasoned veteran, you'll find value throughout this program.
Boost Your Sales
Every part of your business can be evaluated as a process, including your sales funnel. Optimizing your selling process requires a coordinated effort between marketing and sales. In this issue, industry experts in marketing and sales offer their best advice on how to boost your sales efforts.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - smt007 Magazine
ifm Relies on Automated Component Storage from Totech
December 6, 2019 | Super Dry TotechEstimated reading time: 1 minute
Totech today announced another strong partnership with ifm electronic GmbH, a global progressive sensor and automation company, headquartered in Germany. The Totech Dry Tower, a fully automated SMD warehouse, will be installed at the ifm electronic Bechlingen location in Tettnang at the beginning of next year.
After several months of intensive project work with the ifm team, an exciting concept has been finalised that meets the technical requirements of modern SMD production and, at the same time, offers great savings potential.
Brief summary of the overall Dry Tower project:
- Dimensions of the storage system (LxWxH): 4.1mx5.3mx6m, with space for up to 13,000 reels of mixed sizes.
- The future-proofing option of doubling the storage area is accounted for with the modular design.
- The Dry Tower will be erected on the 1st floor above the set-up area to save storage space.
- Storage is via trolleys with space for up to 60 reels.
- A total of up to 4 set-up stations are supplied with material.
- The material is removed from storage in accordance with a defined optimum setup sequence.
- The MSL open times are stopped and logged in the Dry Tower - expired reels are blocked for retrieval until floor life has been reset.
- Expired MSL components are actively dried in the Dry Tower and only then released for production.
- Software interfaces to ASM, Fuji and ifm internal software applications.
According to Bernhard Joos, Head of Department for Central Prefabrication at ifm electronic GmbH and the person responsible for the project, there were several key criteria which drove the investment in Totech's Dry Tower; High efficiency and stability in the storage and set-up processes; High storage volume/area; Modular design and resulting scalability; and Controlled MSL processes.
After completion of a new logistics hall, the installation is planned for the first quarter of 2020.
Suggested Items
ZESTRON Academy Launches 2024 Advanced Packaging & Power Electronics Webinar Series
05/01/2024 | ZESTRONZESTRON, the leading global provider of high-precision cleaning products, services, and training solutions in the electronics manufacturing and semiconductor industries, proudly announces the launch of its highly anticipated webinar series on Advanced Packaging & Power Electronics, a webinar series on the latest innovations, cleaning, and corrosion challenges.
Worldwide Silicon Wafer Shipments Dip 5% in Q1 2024
05/01/2024 | SEMIWorldwide silicon wafer shipments decreased 5.4% quarter-over-quarter to 2,834 million square inches in the first quarter of 2024, a 13.2% drop from the 3,265 million square inches recorded during the same quarter last year, the SEMI Silicon Manufacturers Group (SMG) reported in its quarterly analysis of the silicon wafer industry.
NextFlex Convenes the Hybrid Electronics Community at Binghamton University
05/01/2024 | NextFlexBinghamton University hosted the NextFlex hybrid electronics community on April 18 for a day of expert presentations, breakout sessions on technology and manufacturing topics, and networking.
HQ NextPCB of HQ Electronics Debut on the International Stage for Electronics Manufacture at IPC APEX 2024
05/01/2024 | PRNewswireHQ NextPCB of HQ Electronics, a leading Chinese-based multilayer PCB manufacturer and assembly house showcased its industrial prowess on the international stage for the first time at the IPC APEX Expo 2024.
GPV’s Q1 2024 Interim Financial Report Shows Strong Navigation in Uncertain Times
05/01/2024 | GPVDanish-based GPV recorded an expected drop in sales to DKK 2.3 billion for the first quarter of 2024. The decline also affected the operating profit, which was DKK 155 million compared to DKK 179 million in the same quarter last year, although the EBITDA margin was maintained. In general, demand has been softer in 2024, but GPV continues to invest for the long-term and expects the trend to turn in the second half of 2024.