- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueBox Build
One trend is to add box build and final assembly to your product offering. In this issue, we explore the opportunities and risks of adding system assembly to your service portfolio.
IPC APEX EXPO 2024 Pre-show
This month’s issue devotes its pages to a comprehensive preview of the IPC APEX EXPO 2024 event. Whether your role is technical or business, if you're new-to-the-industry or seasoned veteran, you'll find value throughout this program.
Boost Your Sales
Every part of your business can be evaluated as a process, including your sales funnel. Optimizing your selling process requires a coordinated effort between marketing and sales. In this issue, industry experts in marketing and sales offer their best advice on how to boost your sales efforts.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - smt007 Magazine
Cycle Time Reduction in the Eye of AOI
October 16, 2015 | Stephen Las Marias, I-Connect007Estimated reading time: 2 minutes
In our survey for this month’s topic for SMT Magazine—cycle time reduction—inspection was identified as one of the key issues highlighted by respondents as a bottleneck in their manufacturing process when it comes to cycle times. I spoke with Norihiko Koike, COO of Saki Co. Ltd, to get his insights on this, and how his company is helping their customers address the issue. He also talked about the future technology developments that we can expect in the AOI industry.
Las Marias: From your perspective, nori, what can you say about cycle time?
Norihiko Koike: As a provider of 2D and 3D AOI, and AXI inspection machines, 2D AOI is the most traditional inspection machine that we have. When we talk about 3D AOI there’s always not much issue about cycle time because ours is much faster than the cycle time of the production line; but when it comes to 3D AOI or AXI, cycle time is slower than the actual production time. So we need to start tightening up our technology so that it can meet the actual cycle time. Right now, the trend is 3D AOI. A lot of our customers are chasing us to trim the cycle time of 3D AOI mainly. Our 3D AOI is in the range between 1.2x and 1.5x the cycle time of 2D AOI. So I think it’s quite close, and I believe in the near future it will be within the requirement of our customers.
Las Marias: Considering your customers, why do you think they have longer cycle times in their processes, and how do you think they can cut that down?
Koike: The biggest issue from our customers’ point of view will be the slowest machine in the line. In 2D AOI, it will never be the bottleneck, but it will be with 3D AOI. From the customer’s point of view, the best solution is to have all equipment become faster and faster. So, it depends on what kind of line that our customer designs. If it is a very long line with mounters mounting many components, then often the bottleneck will be the mounters, not the AOI. But on the other hand, if the components are so tiny that they will need X-ray inspection, the problem is bottlenecking at X-ray inspection.
Editor’s Note: This article originally appeared in the October 2015 issue of The PCB Magazine.
Suggested Items
Micron First to Ship Critical Memory for AI Data Centers
05/01/2024 | MicronMicron Technology, Inc. announced it is leading the industry by validating and shipping its high-capacity monolithic 32Gb DRAM die-based 128GB DDR5 RDIMM memory in speeds up to 5,600 MT/s on all leading server platforms.
HQ NextPCB of HQ Electronics Debut on the International Stage for Electronics Manufacture at IPC APEX 2024
05/01/2024 | PRNewswireHQ NextPCB of HQ Electronics, a leading Chinese-based multilayer PCB manufacturer and assembly house showcased its industrial prowess on the international stage for the first time at the IPC APEX Expo 2024.
GPV’s Q1 2024 Interim Financial Report Shows Strong Navigation in Uncertain Times
05/01/2024 | GPVDanish-based GPV recorded an expected drop in sales to DKK 2.3 billion for the first quarter of 2024. The decline also affected the operating profit, which was DKK 155 million compared to DKK 179 million in the same quarter last year, although the EBITDA margin was maintained. In general, demand has been softer in 2024, but GPV continues to invest for the long-term and expects the trend to turn in the second half of 2024.
The Knowledge Base: A CM’s Perspective on Box Build Practices
04/30/2024 | Mike Konrad -- Column: The Knowledge BaseIn the ever-evolving landscape of electronics manufacturing, the box-build process stands out as a critical phase that bridges the gap between individual component manufacturing and the delivery of a fully functional electronic system. This intricate procedure, encompassing the assembly of everything from PCBs to wire harnesses and mechanical enclosures, demands a high level of precision, efficiency, and innovation. As the electronics assembly industry expands and diversifies, understanding the best practices within box-build assembly has become paramount for manufacturers aiming to stay ahead in a competitive market.
I-Connect007 Editor’s Choice: Five Must-Reads for the Week
04/26/2024 | Andy Shaughnessy, Design007 MagazineIn this week’s roundup, we have a variety of articles covering everything from design through assembly, and even box build. I’ve always wondered whether box build was all it was cracked up to be. Do customers really pick one EMS provider over another because one company offers box build? And if you’ve ever wanted to volunteer, IPC’s Thought Leaders Program is looking for a few good technologists to help them on their mission. Check out Stanton Rak’s article, which was published in the spring issue of IPC Community.