Robotic Toolkit Added to NASA's Mars 2020 Rover
August 19, 2019 | NASAEstimated reading time: 2 minutes

The bit carousel — a mechanism that will play a key role in the acquisition, containment and eventual return to Earth of humanity's first samples from another planet — has been incorporated into NASA's Mars 2020 rover.
"The bit carousel is at the heart of the sampling and caching subsystem," said Keith Rosette, Mars 2020 sample handling delivery manager at NASA's Jet Propulsion Laboratory in Pasadena, California. "It contains all of the tools the coring drill uses to sample the Martian surface and is the gateway for the samples to move into the rover for assessment and processing."
Looking somewhat like an extraterrestrial version of a 1960s slide projector, Mars 2020's bit carousel is home to nine drill bits that facilitate sample acquisition and surface analysis: two for abrading, one for regolith (rock and soil) and six for coring. The coring and regolith bits are used to place Martian samples in a clean sample collection tube, while the abrader bit is used to scrape the top layers of rocks to expose un-weathered surfaces for study.
When the rover team is ready to drill, the carousel whirrs into action. If, for instance, the goal is to abrade, the carousel maneuvers the appropriate bit into position so that the drill at the end of the rover's robotic arm can extract it. Once the drilling's done, the bit goes back into the carousel.
For core sampling, a sample tube is inserted inside the appropriate bit before the carousel moves the combination into position for the drill. Once the sample tube has been filled, the robotic arm returns the drill bit and tube to the carousel, where they wend their way to processing stations and storage.
"The bit carousel was the last piece of the Mars 2020 rover's Sample Caching System to be installed," said JPL's John McNamee, project manager of Mars 2020. "And while the rover interior is essentially complete — a battery and a camera used during landing are planned in coming weeks — the assembly and test team will not be resting on their laurels. Months of evaluation and fine tuning lie ahead to make absolutely certain this rover is on the launch pad and ready to go on July 17, 2020."
JPL is building and will manage operations of the Mars 2020 rover for the NASA Science Mission Directorate at the agency's headquarters in Washington. NASA will use Mars 2020 and other missions, including to the Moon, to prepare for human exploration of the Red Planet. The agency intends to establish a sustained human presence on and around the Moon by 2028 through NASA's Artemis lunar exploration plans.
Testimonial
"Our marketing partnership with I-Connect007 is already delivering. Just a day after our press release went live, we received a direct inquiry about our updated products!"
Rachael Temple - AlltematedSuggested Items
New Podcast Episode Drop: MKS’ Atotech’s Role in Optimize the Interconnect
09/08/2025 | I-Connect007In this episode of On the Line With…, host Nolan Johnson sits down with Patrick Brooks, MKS' Atotech's Global Product Director, EL Systems, to discuss the critical role that wet processes play alongside laser systems in advancing the Optimize the InterconnectSM initiative. Brooks points to Bondfilm as a key example—a specialized coating that enables CO₂ lasers to ablate more effectively than ever before.
New Episode Drop: MKS’ ESI’s Role in Optimize the Interconnect
08/26/2025 | I-Connect007In this latest episode, Casey Kruger, director of product marketing at MKS’ ESI, joins On the Line With… host Nolan Johnson to share how CO₂ laser technology delivers faster, more accurate vias in a smaller, more energy-efficient footprint.
New Podcast Episode Drop: Optimize the Interconnect and the Future of HDI
07/28/2025 | I-Connect007The Optimize the Interconnect podcast series continues with its second installment, featuring Chris Ryder, senior director of business development at MKS’ ESI. In this episode, Ryder shares compelling real-world examples that illustrate why Optimize the Interconnect is gaining traction across the industry.
New Podcast Series Launches: Optimize the Interconnect
07/16/2025 | I-Connect007I-Connect007 is excited to announce the debut of Optimize the Interconnect—a new podcast series featuring guest Chris Ryder, senior director of business development at MKS’ ESI. This insightful series explores how MKS’ ESI is rethinking microvia formation for today’s most advanced HDI PCB and substrate designs.
Trouble in Your Tank: Can You Drill the Perfect Hole?
07/07/2025 | Michael Carano -- Column: Trouble in Your TankIn the movie “Friday Night Lights,” the head football coach (played by Billy Bob Thornton) addresses his high school football team on a hot day in August in West Texas. He asks his players one question: “Can you be perfect?” That is an interesting question, in football and the printed circuit board fabrication world, where being perfect is somewhat elusive. When it comes to mechanical drilling and via formation, can you drill the perfect hole time after time?