Northrop Grumman Selected to Build Tranche 2 Transport Layer-Beta Data Transport Satellites
August 22, 2023 | Northrop GrummanEstimated reading time: 1 minute
Northrop Grumman Corporation has been selected by the Space Development Agency (SDA) to design and build 36 data transport satellites, the first space vehicles in the latest generation of its low-Earth orbit Proliferated Warfighter Space Architecture (PWSA). The team will now update the company’s Tranche 1 design to add new broadcast and tactical communications capabilities to PWSA.
The satellites will integrate with, and expand the PWSA mesh network, utilizing high-data-capacity optical crosslinks to deliver accessible, near-real time communications to U.S. warfighters and defensive platforms operating around the globe. The design for this latest iteration, known as Tranche 2 Transport Layer Beta (T2TL Beta), builds on the 42 Tranche 1 Transport Layer (T1TL) and 14 Tranche 1 Tracking Layer (T1TRK) satellites that SDA previously announced it had awarded Northrop Grumman. The T2TL Beta space vehicles add new broadcast and tactical waveforms improving the capabilities of the overall PWSA.
“Creating a low-Earth orbit communications architecture that meets the needs of the warfighter is complex,” said Blake Bullock, vice president, communication systems, Northrop Grumman. “With Northrop Grumman's extensive military satellite communication experience and deep mission understanding, we are helping SDA make its vision a reality.”
Northrop Grumman announced in April it had completed critical design review on its T1TL design in just over a year and in May completed optical interoperability testing. The company is on track to launch its first plane of 21 space vehicles in Q4 2024.
Suggested Items
ITW EAE Achieves ISO 14001 Certification Across All Manufacturing Sites
01/14/2025 | ITW EAEITW EAE, the Electronic Assembly Equipment division of ITW, proudly announces that its manufacturing facilities in Camdenton, Missouri; Lakeville, Minnesota; and Suzhou, China have achieved ISO 14001 certification.
January 2025 Issue of Design007 Magazine: The Designer of the Future
01/13/2025 | I-Connect007 Editorial TeamAs we enter the new year, it’s a great time to be a PCB designer. The job is more complex than ever, and a lot of fun too. We can only wonder what the PCB designers of 1975 would think about the typical PCB designer’s workday. What will the designers' job be like for the next generations?
The Shaughnessy Report: The Designer of Tomorrow
01/14/2025 | Andy Shaughnessy -- Column: The Shaughnessy ReportIt’s a great time to be a PCB designer. The job is more complex than ever, but it's also a lot of fun. We can only wonder what the PCB designers of 1975 would think about today’s typical workday. What will the designer's job look like in the future? There has been a move toward working remotely, driven partly by the COVID pandemic and partly by reality: Many experienced designers simply will not relocate, even for a more lucrative job.
IPC Announces New Training Course: PCB Design for Manufacturability
01/10/2025 | IPCThis three-week online program, taught by an industry expert with over 40 years of experience, is designed to equip PCB designers with the knowledge and skills to reduce or eliminate design, documentation, and capability issues that often arise during PCB fabrication.
Focus on electronica: Future Challenges From a Designer’s Viewpoint
01/09/2025 | I-Connect007 Editorial TeamThomas Romont is CEO of WorldWide Electronic Circuits in Nantes, France, and chair of the IPC Designers Council France. He gave a presentation at electronica titled Challenges for the Future From a PCB/PCBA Designer Perspective. We asked Thomas to share his thoughts about the class, why this topic is so important, and what he hoped attendees would take away from his class.