-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueCreating the Ideal Data Package
Why is it so difficult to create the ideal data package? Many of these simple errors can be alleviated by paying attention to detail—and knowing what issues to look out for. So, this month, our experts weigh in on the best practices for creating the ideal design data package for your design.
Designing Through the Noise
Our experts discuss the constantly evolving world of RF design, including the many tradeoffs, material considerations, and design tips and techniques that designers and design engineers need to know to succeed in this high-frequency realm.
Learning to Speak ‘Fab’
Our expert contributors clear up many of the miscommunication problems between PCB designers and their fab and assembly stakeholders. As you will see, a little extra planning early in the design cycle can go a long way toward maintaining open lines of communication with the fab and assembly folks.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - design007 Magazine
Renesas Extends Tender Offer for Proposed Acquisition of Sequans
December 28, 2023 | RenesasEstimated reading time: 1 minute
Renesas Electronics Corporation and Sequans Communications S.A. announced that Renesas has extended the expiration date of its tender offer to acquire all of the outstanding ordinary shares of Sequans for $0.7575 per ordinary share and American Depositary Shares (ADSs) of Sequans for $3.03 per ADS (each ADS representing four ordinary shares) in cash, without interest and less any applicable withholding taxes.
The tender offer, which was previously scheduled to expire at one minute after 11:59 P.M., New York City time, on December 20, 2023, has been extended until one minute after 11:59 P.M., New York City time, on January 5, 2024, unless the tender offer is further extended or earlier terminated. The tender offer was extended to allow additional time for the satisfaction of the remaining closing conditions of the tender offer, including, but not limited to, regulatory approvals (other than the previously announced CFIUS approval, NSIA approval and Taiwan merger control approval) and the valid tender of ordinary shares and ADSs of Sequans representing – together with ordinary shares and ADSs of Sequans beneficially owned by Renesas, if any – at least 90% of the fully diluted ordinary shares of Sequans.
The Bank of New York Mellon, the Tender Agent for the tender offer, has advised Renesas that as of 6 p.m., New York City time, on December 18, 2023, approximately 104,685,461 ordinary shares of Sequans (including ordinary shares represented by ADSs), representing approximately 37.5% of the fully diluted ordinary shares of Sequans, have been validly tendered and not properly withdrawn pursuant to the tender offer. Holders that have previously tendered their shares do not need to re-tender their shares or take any other action in response to this extension.
The tender offer is being made pursuant to the Offer to Purchase, dated September 11, 2023 (as it may be amended or supplemented from time to time, the “Offer to Purchase”), the related Ordinary Share Acceptance Form, ADS Letter of Transmittal and certain other offer documents (together with any amendments or supplements thereto), copies of which are attached to the combined Tender Offer Statement and Rule 13e-3 Transaction Statement filed under cover of Schedule TO by Renesas and Renesas Electronics Europe GmbH with the U.S. Securities and Exchange Commission (the “SEC”) on September 11, 2023, as amended.
Suggested Items
Siemens Announces PAVE360 Support for New Arm Zena Compute Subsystems
06/04/2025 | Siemens Digital Industries SoftwareSiemens Digital Industries Software announced today that it is expanding its longstanding relationship with Arm and adding support for the newly launched Arm® Zena™ Compute Subsystems (CSS) in its PAVE360™ software, designed for software-defined vehicles (SDV).
Datest Receives Its 16th AS9100D Recertification Audit
06/03/2025 | DatestDatest, a trusted leader in advanced testing, engineering, inspection, and failure analysis services, proudly announces sixteen straight years of aerospace-grade perfection. Cue the confetti cannons (ESD-safe, of course).
Elma Electronic Bolsters Quality Management Company-wide with Added AS9100:D and ISO9001:2015 Certifications
06/02/2025 | Elma ElectronicElma Electronic now includes AS9100:D and ISO 9001:2015 certifications at its Horsham, Pa. manufacturing facility, earning the company a multiple site accreditation designation.
Maxar Space Systems Selected to Build High-Power EchoStar XXVI Satellite Share
06/02/2025 | BUSINESS WIREMaxar Space Systems, a trusted partner in satellite design and manufacturing, today announced it has been awarded a contract by EchoStar Corporation to manufacture EchoStar XXVI, a high-power geostationary communications satellite based on the Maxar 1300™ platform.
ispace Completes Success 8 of Mission 2 Milestones
06/02/2025 | ispaceispace, inc. (ispace) (TOKYO: 9348), a global lunar exploration company, announced that the RESILIENCE lunar lander has successfully completed all orbital maneuvers while in lunar orbit and is now being prepared for its landing attempt on June 6, 2025.