-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueFueling the Workforce Pipeline
We take a hard look at fueling the workforce pipeline, specifically at the early introduction of manufacturing concepts and business to young people in this issue of PCB007 Magazine.
Inner Layer Precision & Yields
In this issue, we examine the critical nature of building precisions into your inner layers and assessing their pass/fail status as early as possible. Whether it’s using automation to cut down on handling issues, identifying defects earlier, or replacing an old line...
Engineering Economics
The real cost to manufacture a PCB encompasses everything that goes into making the product: the materials and other value-added supplies, machine and personnel costs, and most importantly, your quality. A hard look at real costs seems wholly appropriate.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - pcb007 Magazine
NASA 2024: Onward and Upward
January 1, 2024 | NASAEstimated reading time: Less than a minute
Landing science on the Moon, demonstrating quiet supersonic aircraft, and launching two new Earth climate satellites, plus a mission to Europa, one of Jupiter’s icy moons, are just a few of the milestones we have planned for 2024.
Suggested Items
Curtiss-Wright Awarded $27M Contract to Provide Aircraft Handling Systems and Support for U.S. Navy Constellation Class Frigates
01/24/2025 | Curtiss-Wright CorporationCurtiss-Wright Corporation announced that it has received a $27 million contract award from the Canadian Commercial Corporation (CCC) for the supply of Aircraft Ship Integrated Securing and Traversing (ASIST) systems.
NASA Plans to Assign Missions for Two Future Artemis Cargo Landers
12/02/2024 | NASANASA, along with its industry and international partners, is preparing for sustained exploration of the lunar surface with the Artemis campaign to advance science and discovery for the benefit of all. As part of that effort, NASA intends to award Blue Origin and SpaceX additional work under their existing contracts to develop landers that will deliver large pieces of equipment and infrastructure to the lunar surface.
Japan’s First Moon Lander Touches Down with Renesas’ Rad-Hard ICs on Board
01/22/2024 | BUSINESS WIRERenesas Electronics Corporation, a premier supplier of advanced semiconductor solutions, announced that its radiation-hardened (rad-hard) ICs were onboard the Smart Lander for Investigating Moon (SLIM) spacecraft that successfully touched down on the Moon’s low latitude area on January 20, Japan Standard Time.
OSIRIS-REx Sample Capsule Safely Touches Down With NASA's First-Ever Asteroid Sample
09/25/2023 | Lockheed MartinFollowing a rapid and red-hot descent through Earth's atmosphere, NASA's OSIRIS-REx sample return capsule touched down in the desert at 8:52 a.m. MT, returning NASA's first-ever asteroid sample.
Lockheed Martin On Blue Origin's National Team Selected To Develop Human Lunar Lander
05/22/2023 | Lockheed MartinLockheed Martin is on the team that has won a contract from NASA to develop and demonstrate a human landing system for the Artemis program under the agency’s Human Landing System program.