-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueInner Layer Precision & Yields
In this issue, we examine the critical nature of building precisions into your inner layers and assessing their pass/fail status as early as possible. Whether it’s using automation to cut down on handling issues, identifying defects earlier, or replacing an old line...
Engineering Economics
The real cost to manufacture a PCB encompasses everything that goes into making the product: the materials and other value-added supplies, machine and personnel costs, and most importantly, your quality. A hard look at real costs seems wholly appropriate.
Alternate Metallization Processes
Traditional electroless copper and electroless copper immersion gold have been primary PCB plating methods for decades. But alternative plating metals and processes have been introduced over the past few years as miniaturization and advanced packaging continue to develop.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - pcb007 Magazine
Ibiden Names New President and CEO
February 27, 2024 | IBIDENEstimated reading time: 1 minute
Japanese PCB maker IBIDEN Co. Ltd has named Koji Kawashima as the company’s new president and chief executive officer (CEO). He will succeed Takeshi Aoki, who will become the chairman of the board of the company.
The change will be formally approved at Ibiden’s 171st General Meeting of Shareholders, which will be held on June 13, 2024, and the Board of Directors meeting following the General Meeting of Shareholders.
The move was in line with the company’s five-year mid-term management plan, "Moving on to our New Stage 115 Plan" (MNS115 Plan), for the next leap forward. Under this plan, the entire group is working together to achieve sustainable growth by responding to changes in the business environment based on the following Five Pillars of Activities—capabilities to be strengthened—and fundamental activities as a manufacturing company. The Five Pillars include the “Power to Earn”, “Power to Grow”, “Power to Maintain”, “Power to Change”, and “Power to Sustainability”.
The executive management change is intended to further strengthen the competitiveness of the mainstay electronics business in preparation for market recovery and the launch of new plants in Ono and Gama under a new structure.
Suggested Items
Saki to Highlight Advanced Inspection Innovation at 39th NEPCON JAPAN
12/23/2024 | Saki CorporationSaki Corporation, an innovator in the field of automated optical and X-ray inspection equipment, will be exhibiting at the 39th NEPCON JAPAN at the Tokyo Big Site Exhibition Center.
Hitachi Energy Wins Over EUR 2 Billion Oder from Amprion
12/23/2024 | Hitachi EnergyHitachi Energy has signed contracts totaling over 2 billion euros with German transmission system operator (TSO) Amprion to deliver four converter stations for two high-voltage direct current (HVDC) links that will support Germany’s clean energy transition.
Two Additional Boeing O3b mPOWER Satellites Successfully Communicating in Space
12/23/2024 | BoeingTwo more Boeing-built O3b mPOWER satellites are sending and receiving signals in space after launching from the Kennedy Space Center, Florida at 5:26 p.m.
The Knowledge Base: The Era of Advanced Packaging
12/23/2024 | Mike Konrad -- Column: The Knowledge BaseThe semiconductor industry is at a pivotal juncture. As the traditional scaling predicted by Moore's Law encounters significant physical and economic barriers, transistor density can no longer double every two years without escalating costs and complications. As a result, the industry is shifting its focus from chip-level advancements to innovative packaging and substrate technologies. I Invited Dr. Nava Shpaisman, strategic collaboration manager at KLA, to provide some insight.
GB200 Rack Supply Chain Requires Further Optimization, Peak Shipments Expected Between 2Q25 and 3Q25
12/18/2024 | TrendForceAs the market closely follows the progress of NVIDIA’s GB200 rack-mounted solution, TrendForce’s latest research indicates that the supply chain requires additional time for optimization and adjustment.