-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueRules of Thumb
This month, we delve into rules of thumb—which ones work, which ones should be avoided. Rules of thumb are everywhere, but there may be hundreds of rules of thumb for PCB design. How do we separate the wheat from the chaff, so to speak?
Partial HDI
Our expert contributors provide a complete, detailed view of partial HDI this month. Most experienced PCB designers can start using this approach right away, but you need to know these tips, tricks and techniques first.
Silicon to Systems: From Soup to Nuts
This month, we asked our expert contributors to weigh in on silicon to systems—what it means to PCB designers and design engineers, EDA companies, and the rest of the PCB supply chain... from soup to nuts.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - design007 Magazine
VDL ETG: New Location in Vietnam
March 20, 2024 | VDL ETGEstimated reading time: 1 minute
VDL ETG, the high-tech cluster of VDL Groep, during the Dutch trade mission in Vietnam, ratified a cooperation with Frasers Property for the construction of a new facility in Vietnam. Construction of the new VDL factory in the northeast of Vietnam will start soon. The schedule is for the first modules to leave the new plant to supply international customers by the end of the first quarter, beginning of the second quarter of 2025.
VDL Groep's overall growth strategy is global, on 3 continents: in Europe, America and Asia. VDL's global customers are asking for even better global coverage, with local production for the local market. Being able to deliver anywhere is a major advantage for VDL's existing and new customers.
VDL is therefore also investing on all 3 of these continents, the majority in Europe and some in both other continents. These investments are aimed at maintaining and strengthening employment in the current plants. VDL ETG also has locations in Asia in Singapore and Suzhou (China).
About 60 colleagues will initially join VDL ETG in Vietnam. At the end of the first quarter, beginning of the second quarter of 2025, the first modules are scheduled to leave this location to supply the international customers.
Suggested Items
L3Harris Receives $182 Million Video Data Link IDIQ
09/19/2024 | L3Harris TechnologiesL3Harris Technologies has received an Indefinite Delivery, Indefinite Quantity (IDIQ) contract worth up to $182 million from the U.S. Air Force to deliver advanced situational awareness capabilities.
Peter Wennink Appointed Member of the Supervisory Board of VDL Groep
09/03/2024 | VDL GroepPeter Wennink has joined the Supervisory Board of VDL Groep. On 1 September 2024, the 67-year-old former CEO of chip machine maker ASML joined the Supervisory Board of the industrial family business with its headquarters in Eindhoven.
VDL Executive Vice Presidents Guus Savenije and Paul Van Vuuren Due to Retire
06/07/2024 | VDL GroepAfter 11 and 6 years of service respectively, Guustaaf Savenije (66) and Paul van Vuuren (65), both members of the VDL Groep's Executive Board for 3.5 years, will retire with effect from 1 July 2024.
Siemens Nederland, VDL Strengthen Partnership for Second-Generation Automated Guided Vehicles (AGVS)
04/24/2024 | VDL Automated VehiclesThis fall, Siemens Nederland and VDL Automated Vehicles will launch the second generation of their automated logistics platform based on Automated Guided Vehicles (AGVs) for industrial firms with mixed-traffic sites.
2023: Year of Extremes for VDL Groep
04/08/2024 | VDL GroepThe year 2023 showed us two sides, with highs and lows. Low points were the passing of Wim van der Leegte in November, the reduction in the number of employees at VDL Nedcar and headwind in the Buses & Coaches division.