-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueCreating the Ideal Data Package
Why is it so difficult to create the ideal data package? Many of these simple errors can be alleviated by paying attention to detail—and knowing what issues to look out for. So, this month, our experts weigh in on the best practices for creating the ideal design data package for your design.
Designing Through the Noise
Our experts discuss the constantly evolving world of RF design, including the many tradeoffs, material considerations, and design tips and techniques that designers and design engineers need to know to succeed in this high-frequency realm.
Learning to Speak ‘Fab’
Our expert contributors clear up many of the miscommunication problems between PCB designers and their fab and assembly stakeholders. As you will see, a little extra planning early in the design cycle can go a long way toward maintaining open lines of communication with the fab and assembly folks.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - design007 Magazine
UcamX and Integr8tor v2024.06 are Now Available
July 16, 2024 | UcamcoEstimated reading time: Less than a minute
Ucamco is proud to release UcamX v2024.06 and Integr8tor v2024.06. These new versions of our CAM and Pre-CAM software include plenty of additions to increase our customers’ productivity, highlighted by the topics below.
UcamX v2024.06
- Clipping Preview
- Fill Pattern
- Copper Count
- ATG Output
- Edit Contour Text
- Extended View
- Board Analyzer
- Output Gerber X2/X3
Integr8tor v2024.06
- Individual barrel surface areas
- Via in Pad
- Copper free of solder mask area relative to board surface
- Pad-to-pad clearance
- Min. clearance legend-to-pad
- Checkpoint Unit conversion
- Archive contents exclusion
UcamX and Integr8tor v2024.06 are now available for download for all maintenance contract users. Customers who wish to upgrade to this version outside of a maintenance contract or wish to take out a maintenance contract, are welcome to contact their local sales channel.
Suggested Items
Saki America, Appoints Mario Ramírez Galindo as Project Engineer in Mexico
04/17/2025 | Saki America,Saki America, Inc., an innovator in the field of automated optical and X-ray inspection equipment, is pleased to announce the appointment of Mario Ramírez Galindo as Project Engineer in Mexico. In this role, Mario will support Saki’s customers by providing technical expertise, process optimization, and project management to enhance manufacturing efficiency and inspection accuracy.
Siemens Expands Industrial Copilot with New Generative AI-powered Maintenance Offering
03/24/2025 | SiemensThe Siemens Industrial Copilot is revolutionizing industry by enabling customers to leverage generative AI across the entire value chain – from design and planning to engineering, operations, and services.
Panasonic Avionics and Riyadh Air Sign Landmark 10-Year Turnkey Maintenance Agreement
02/24/2025 | Panasonic AvionicsPanasonic Avionics Corporation (Panasonic Avionics) has announced a landmark 10-year agreement with Riyadh Air, Saudi Arabia’s premium global airline, to provide in-flight entertainment maintenance support for their fleet of confirmed orders of 39 Boeing 787 Dreamliners.
Laser Photonics Secures Repeat Bruce Power Order for Advanced CleanTech Laser Technology
02/11/2025 | BUSINESS WIRELaser Photonics Corporation (LPC), a leading global developer of industrial laser systems for cleaning and other material processing applications, announced that it has received an order for a second and third CleanTech 500-CTHD laser cleaning system from Sargent & Lundy for use by Bruce Power in Ontario, Canada, the operator of North America’s largest operational nuclear power plant.
Zhen Ding’s Subsidiary BoardTek Electronics Experienced a Fire Incident
02/10/2025 | Zhen Ding TechnologyZhen Ding Technology Holding Co., Ltd. (Ticker: 4958) announced that its subsidiary, BoardTek Electronics, experienced a fire incident in the copper plating workshop of their second factory (January 5). BoardTek promptly evacuated all personnel without any injuries. After firefighters arrived and handled the situation, the fire was extinguished, and follow-up measures were taken safely.