-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueRules of Thumb
This month, we delve into rules of thumb—which ones work, which ones should be avoided. Rules of thumb are everywhere, but there may be hundreds of rules of thumb for PCB design. How do we separate the wheat from the chaff, so to speak?
Partial HDI
Our expert contributors provide a complete, detailed view of partial HDI this month. Most experienced PCB designers can start using this approach right away, but you need to know these tips, tricks and techniques first.
Silicon to Systems: From Soup to Nuts
This month, we asked our expert contributors to weigh in on silicon to systems—what it means to PCB designers and design engineers, EDA companies, and the rest of the PCB supply chain... from soup to nuts.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - design007 Magazine
RTX's Raytheon SM-3 Block IIA Achieves Full-rate Production Approval
October 22, 2024 | RTXEstimated reading time: 1 minute
Raytheon, an RTX business, has entered full-rate production for Standard Missile-3 Block IIA, validating the program's design maturity amid increased demand for the product from the United States and allied partners.
The SM-3 Block IIA production milestone cleared the way for a $1.9 billion award from the U.S. Missile Defense Agency in July 2024 to produce rounds for both the U.S. government and Japan Ministry of Defense.
Full-rate production signals that there is no elevated design or manufacturing risk in the missile and validates its reliability and performance.
"SM-3 Block IIA is a testament to the continuing partnership with Japanese industry to mature ballistic missile defense capabilities for the defense of our nation and our allies around the globe," said Barbara Borgonovi, president of Naval Power at Raytheon. "This milestone indicates that the team has achieved full maturity in the missile's design which leads to greater efficiencies throughout the program."
SM-3 Block IIA, created in a landmark cooperative development program between MDA, Japan Ministry of Defense and their industry partners (Raytheon and Japanese industry), is the first MDA-procured program of its kind to achieve this manufacturing milestone. SM-3 Block IIA features larger rocket motors and an enhanced kinetic warhead compared to its predecessors, allowing it to engage threats faster and protect larger regions from short- to intermediate-range ballistic missile threats.
Work under this contract will be done at Raytheon facilities in Tucson, Ariz.; and Huntsville, Ala., with completion by February 2031.