-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueThe Path Ahead
What are you paying the most attention to as we enter 2025? Find out what we learned when we asked that question. Join us as we explore five main themes in the new year.
Soldering Technologies
Soldering is the heartbeat of assembly, and new developments are taking place to match the rest of the innovation in electronics. There are tried-and-true technologies for soldering. But new challenges in packaging, materials, and sustainability may be putting this key step in flux.
The Rise of Data
Analytics is a given in this industry, but the threshold is changing. If you think you're too small to invest in analytics, you may need to reconsider. So how do you do analytics better? What are the new tools, and how do you get started?
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - smt007 Magazine
Sierra Space’s Dream Chaser Spaceplane Successfully Passes NASA Testing Milestone in Preparation for Launch
January 31, 2025 | BUSINESS WIREEstimated reading time: 2 minutes
Sierra Space, a leading commercial space company and defense tech prime that is Building a Platform in Space to Benefit Life on Earth®, announced today it has successfully completed and passed its Joint Test 10B milestone in collaboration with NASA on the Dream Chaser® spaceplane.
The test demonstrated several capabilities of Dream Chaser, including its ability to power-on, air-cool, and exchange data with multiple powered payloads inside its pressurized cabin. This is an important progression toward Dream Chaser’s planned mission to resupply the International Space Station (ISS).
“Tests like these are critical demonstrations of the capabilities of the Dream Chaser spaceplane and confirms our ability to handle specialized payloads such as vital scientific research that will be integral to our mission to the ISS,” said Pablo Gonzalez, Vice President of Crew & Cargo Transportation Systems at Sierra Space. "This milestone highlights Dream Chaser’s flexibility, reliability, and capability to meet the diverse needs of our payload customers – including NASA and commercial partners – and it brings us another step closer to launch."
The successful completion of this milestone confirms that Dream Chaser will accommodate various payloads. The Joint Test 10B demonstrated that Sierra Space can provide power within a specific voltage range and maintain the necessary environmental requirements for payloads. It also ensured all vehicle and payload data are seen in both Sierra Space’s mission control room in Louisville, Colorado, and in the payload support control rooms at NASA’s Marshall Spaceflight Center (MSFC) in Huntsville, Alabama.
During the Joint Test 10B, the test team successfully evaluated three key payloads, all of which are candidates for flight on DCC-1, the first official mission of Dream Chaser.
These payloads included:
Polar: A cryogenic preservation system developed by the University of Alabama at Birmingham and managed by NASA's Cold Stowage Lab and the University of Alabama at Birmingham. Polar is designed to preserve scientific samples aboard the ISS and other visiting spacecraft at temperatures ranging from -95°C to +10°C.
Powered Ascent Utility Locker (PAUL): A facility developed by Space Tango that holds two CubeLab experiments requiring power during ascent. These experiments often focus on biological research, such as cell and tissue cultures.
NASA’s Single Stowage Locker: A standard stowage system designed to carry experiments and other payloads in the Dream Chaser spaceplane.
"Space Tango's recent integration testing with the Sierra Space Dream Chaser went well and all teams were very happy with the results," said Anne Currin, Director of Mission Management at Space Tango. "We appreciate the steps the Sierra Space team has taken to get both the vehicle and Space Tango ready for a successful flight. It's been exciting to see this come together as we count down to a maiden flight that is scheduled to increase access for payload delivery to the International Space Station."
The tests took place at NASA’s Kennedy Space Center in Florida last month, with oversight from Sierra Space and NASA.
Suggested Items
SiriusXM’s SXM-9 Satellite Completes In-Orbit Testing and Begins Service
01/31/2025 | BUSINESS WIRESiriusXM and Maxar Space Systems announced that the SXM-9 satellite has completed in-orbit testing and is now fully operational by SiriusXM after being successfully launched by a SpaceX Falcon 9 rocket on December 5, 2024.
Planet Signs $230 Million Commercial Agreement for Pelican Satellites
01/31/2025 | BUSINESS WIREPlanet Labs PBC, a leading provider of daily data and insights about Earth, announced the signing of a multi-year $230 million agreement to expand its partnership with a long-standing, Asia-Pacific commercial partner.
EdgeCortix SAKURA-I AI Accelerator Demonstrates Robust Radiation Resilience, Suitable for Many Orbital and Lunar Expeditions
01/29/2025 | EdgeCortixEdgeCortix® Inc., a leading fabless semiconductor company specializing in energy-efficient Artificial Intelligence (AI) processing at the edge, announced that its SAKURA-I AI Accelerator is suitable for space missions including in Earth orbit and on the lunar surface, demonstrating high levels of radiation resiliency.
Bajaj Electronics Supercharges Digital Transformation with Google Workspace and Brio Technologies
01/28/2025 | PRNewswireBajaj Electronics, a leading consumer electronics retailer, has modernized its operations by migrating to Google Workspace with the assistance of Brio Technologies, a specialized Google Cloud partner.
Orbex Appoints Leading UK Space Expert as CTO Ahead of First Launch
01/28/2025 | OrbexUK-based orbital launch services company, Orbex, has today announced the appointment of its new Chief Technology Officer, Andy Bradford.