Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Testimonial

"Our marketing partnership with I-Connect007 is already delivering. Just a day after our press release went live, we received a direct inquiry about our updated products!"

Rachael Temple - Alltemated

Suggested Items

Trouble in Your Tank: Pre-electroless Causes of Voids

09/02/2026 | Michael Carano -- Column: Trouble in Your Tank
To support advanced 2.5D and 3D heterogeneous integration, product and motherboard designs are now using higher layer counts. As layer counts increase, plated through-holes (PTHs) become deeper and higher in aspect ratio, making it more difficult to achieve a continuous, void-free copper deposit. Drilling these thicker panels and higher aspect ratio vias adds another layer of complexity. Since there are many potential causes of PTH voiding, I’ll focus on pre-electroless copper causes, including drilling.

Navitas to Acquire Claros

08/27/2026 | Navitas
Navitas Semiconductor Corporation, the industry leader in next-generation GaNFast™ gallium nitride (GaN) and GeneSiC™ silicon carbide (SiC) power semiconductors, announced the signing of a definitive agreement to acquire Claros, Inc. (Claros) a power management solutions company developing vertical power delivery (VPD) and integrated voltage regulator (IVR) technology for next-generation AI data centers, in a transaction valued at up to approximately $232.8 million, based on the per share closing price of Navitas’ stock on August 21, 2026.

Decoding the CMMC Suspension

08/25/2026 | Divyash Patel, MX2 Technology
The recent CMMC suspension put all of us in something of a state of shock and confusion, and I have been closely following the discussion in the Defense Industrial Base (DIB) community, including vendors, customers, and cybersecurity specialists. In a memo to my clients, I shared some details for the decision. A common theme among those reasons is cost and capacity. We’ve learned that CMMC has prohibitive compliance costs, with individual bills approaching $600,000; SBA estimates above $7 billion annually across the base, that there is a severe assessor shortage; roughly 100,000+ firms need assessments from only about 100 approved organizations and that the DoD stood up a 60-day CMMC Reform Task Force to recommend a lower-barrier replacement framework.

Target Condition: Life in the Engineering Ecosystem

08/25/2026 | Kelly Dack -- Column: Target Condition
A while back, I started thinking about the word ecosystem, a term that's become almost mandatory in discussions about electronics: the PCB ecosystem, the electronics ecosystem, and the design ecosystem. Is it more than an overused metaphor, or what if it really is an ecosystem? That question sent me down the kind of rabbit hole I enjoy. I started imagining electrical engineers, product managers, PCB designers, manufacturing and test engineers, supplier management, quality, and everyone else we work with fitting into the same kind of biological classification system we learned in high school.

Nordson Reports Record Q3 FY2026, Raises Full-Year Guidance

08/20/2026 | BUSINESS WIRE
Nordson Corporation reported results for the fiscal third quarter ended July 31, 2026. Sales were a quarterly record of $818 million, an increase of 10% compared to the prior year’s third quarter sales of $742 million.
Copyright © I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in