Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Testimonial

"We’re proud to call I-Connect007 a trusted partner. Their innovative approach and industry insight made our podcast collaboration a success by connecting us with the right audience and delivering real results."

Julia McCaffrey - NCAB Group

Suggested Items

RTX's Raytheon Completes Installation of First SPY-6(V)4 Array at Wallops Island Test Site

08/03/2026 | Raytheon Company
Raytheon, an RTX business, has delivered and installed the first SPY-6(V)4 radar array at Surface Combat Systems Center at Wallops Island in Virginia, marking a major milestone for the U.S. Navy's Flight IIA Destroyer modernization effort and the SPY-6 backfit program.

Foxconn Research Develops 34.1 Tbps Silicon Photonics Technology

07/30/2026 | Foxconn
Foxconn Research Institute, in collaboration with National Yang Ming Chiao Tung University, has developed a 34.132 Tbps ultra-high-capacity silicon photonics transmission technology designed to address growing data bandwidth demands driven by artificial intelligence (AI).

Will Your Vias Survive the Heat? New Book From I-Connect007 Has the Answers

08/03/2026 | I-Connect007
I-Connect007 is excited to announce the release of The Printed Circuit Assembler's Guide to... Via Structures: Reflow Process Survivability, Reliability, and Robustness, the newest title in its technical resources library. Written by reliability expert Bob Neves, the book examines one of the industry's most misunderstood topics: how to properly evaluate PCB via structures for assembly process survivability, long-term reliability, and robustness.

Celestica Reports Record Q2 2026 Results, Raises Full-Year Outlook

07/29/2026 | Celestica Inc.
Celestica Inc., a global leader in data center infrastructure and advanced technology solutions, announced its financial results for the second quarter ended June 30, 2026 (Q2 2026).

AMD and Anthropic Announce Strategic Partnership to Deploy Up to 2 Gigawatts of AMD Instinct MI450 Series GPUs

07/23/2026 | AMD
AMD and Anthropic today announced a strategic partnership to deploy up to 2 gigawatts of AMD Instinct MI450 Series GPUs in AMD Helios rack-scale solutions, with deployment of the first gigawatt beginning in the first half of 2027.
Copyright © I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in