-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueCreating the Ideal Data Package
Why is it so difficult to create the ideal data package? Many of these simple errors can be alleviated by paying attention to detail—and knowing what issues to look out for. So, this month, our experts weigh in on the best practices for creating the ideal design data package for your design.
Designing Through the Noise
Our experts discuss the constantly evolving world of RF design, including the many tradeoffs, material considerations, and design tips and techniques that designers and design engineers need to know to succeed in this high-frequency realm.
Learning to Speak ‘Fab’
Our expert contributors clear up many of the miscommunication problems between PCB designers and their fab and assembly stakeholders. As you will see, a little extra planning early in the design cycle can go a long way toward maintaining open lines of communication with the fab and assembly folks.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - design007 Magazine
Altium Updates its PCB Design Data Management Tool
June 9, 2015 | Altium LimitedEstimated reading time: 2 minutes

Altium Limited has released a major update to their enterprise PCB design data management solution: Altium Vault. This new update includes a number of new features to improve the automation and management of design data, with updates to every major feature category including component management, data management, project collaboration, and infrastructure management. Altium Vault 2.5 is available now to all Altium Vault Subscription customers.
“We’ve taken the opportunity in this newest Altium Vault update to carefully identify and optimize those tasks that we found our customers utilizing on a daily basis,” said Nikolay Ponomarenko, product manager at Altium. “Altium Vault 2.5 is all about automating those data management tasks that pull designers away from the actual design process, and providing greater control and specificity in those domains that still rely on human precision and analysis.”
New Features in Altium Vault 2.5
The new features in Altium Vault build off an existing foundation of improved data management tools with an expansion of the ability to search, update, and organize design data in more efficient ways. Altium Vault 2.5 includes 14 new features, with the following highlights:
Component Management Improvements
- Component Update Notifications. Engineers are automatically alerted inside of Altium Designer when footprints or symbols associated with components have been updated in the Altium Vault, and are provided with the option to sync all new changes.
Data Management Improvements
- Lifecycle Change Approvals. Lifecycle changes can be controlled only by team members granted change permission rights, or through an approval-driven process where team members can submit lifecycle change requests to be approved by managers.
Infrastructure Management Improvements
- NIS Deployment Packages. Deploying an NIS server for local installs of Altium Designer on client machines is now simplified with an automated installation package.
Project Management & Collaboration Improvements
- Automated Project Notifications. Team members are notified of any changes made to projects with email notifications for updates to commits, state changes, project releases, and comments.
- Binary File Storage. Users can store all documents and data for the project, not just data generated by Altium Designer, in the same central location in the Altium Vault.
Availability
Altium Vault 2.5 is available now for all existing Altium Vault Subscription customers, and users can update immediately with the installer on the Altium Product Downloads page.
Altium Vault comes in three editions for a variety of use cases: Component, Workgroup, and Enterprise Editions. Altium Vault can be purchased now through Altium sales offices and certified resellers.
Additional information on all the new features included in Altium Vault 2.5 can be found on the Altium Vault What’s New page.
Suggested Items
Canadian Circuits Inc. Unveils Rapid Prototype PCB Assembly Service to Accelerate Innovation
05/14/2025 | Canadian Circuits, Inc.Canadian Circuits Inc. (CCI), a leading provider of high-quality, made-in-Canada, Printed Circuit Board (PCB) solutions, is proud to announce the launch of its Prototype PCB Assembly (PCBA) service. This new offering enhances CCI’s commitment to empowering engineers and OEMs by accelerating the journey from concept to product launch with precision and efficiency in electronics manufacturing.
New Episode of NCAB Podcast Series Explores Cutting-edge Thermal Management Solutions
05/14/2025 | I-Connect007In this episode we continue the conversation with NCAB Field Application Engineer Ryan Miller as we dive into practical design and manufacturing techniques for controlling thermal effects. Topics include via farms, insulated metal substrates, coin technology, and copper pedestals—solutions that help meet today's high-performance demands.
American Standard Circuits to Exhibit and Speak at SMTA Oregon Expo
05/14/2025 | American Standard CircuitsAnaya Vardya, President, and CEO of American Standard Sunstone Circuits has announced that his company will be exhibiting SMTA Oregon Expo & Tech Forum to be held on May 20 at the Wingspan Events and Conference Center in Hillsboro, Oregon.
indie Semiconductor Reports Q1 2025 Results
05/13/2025 | BUSINESS WIREindie Semiconductor, Inc., an automotive solutions innovator, today announced first quarter results for the period ended March 31, 2025. Q1 revenue was up 3.3 percent year-over-year to $54.1 million with Non-GAAP gross margin of 49.5 percent. On a GAAP basis, first quarter 2025 operating loss was $38.9 million compared to $49.6 million a year ago.
Elementary, Mr. Watson: Design Data Packages—Circle of Concern or Circle of Influence?
05/14/2025 | John Watson -- Column: Elementary, Mr. WatsonI've often been asked, "Can you have a perfect PCB design?" At first blush, it seems like the answer should be yes. After all, if you follow all the rules, double-check your work, and use the right tools, it should be perfect. Right?