-
-
News
News Highlights
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueAll About That Route
Most designers favor manual routing, but today's interactive autorouters may be changing designers' minds by allowing users more direct control. In this issue, our expert contributors discuss a variety of manual and autorouting strategies.
Creating the Ideal Data Package
Why is it so difficult to create the ideal data package? Many of these simple errors can be alleviated by paying attention to detail—and knowing what issues to look out for. So, this month, our experts weigh in on the best practices for creating the ideal design data package for your design.
Designing Through the Noise
Our experts discuss the constantly evolving world of RF design, including the many tradeoffs, material considerations, and design tips and techniques that designers and design engineers need to know to succeed in this high-frequency realm.
- Articles
- Columns
- Links
- Media kit
||| MENU - design007 Magazine
Avoid Overbuilding your RF Printed Circuit Board
July 9, 2015 | Barry Matties, I-Connect007Estimated reading time: 11 minutes
Hofer: We're a quick-turn manufacturer in prototyping, and in many good R&D processes, an engineer can run a little bit late, because you always think of a way to do it better or something that you didn't address, and you have to go back and fix it. We find an incredible amount of demand for RF products in five days or less. The biggest problem that we run up against is a lot of the advanced dielectric manufacturers have lead times that exceed 20 or 30 days.
Rogers is a big name, but there's also Taconic out there, there's Isola making high-frequency products, and actually we're very excited by some of the products that Isola is developing. You've got Nelco in that arena as well, and the issue comes when somebody needs a board in five days; if you have to wait 10 or 15 or 20 business days to get material, it throws the whole project out the door. We combat that by stocking a lot of that material and taking it upon ourselves to make sure that we keep a min/max stock on hand so we can eliminate that lead time.
Matties: That's good. Not everybody has that ability.
Hofer: No, and I think that sets us apart. We got an engineer who needs to put a satellite up next year, and he's got this last board in design and he says, “I need this one in three days.” No problem, just hold on three weeks while I get the material. It just doesn't go over well.
Matties: Isn't part of the problem that we see, though, is these OEMs and engineers are spec’ing that material? Are you seeing a shift where they're giving you second-source approvals?
Hofer: With customers that are repeat customers, we're finding that they understand that we offer help at the beginning when they're doing that stack-up. We can then say, “Okay, if you run with this material, you might have a lead time of 20 business days. Here's two options. This one has a lead time of 5–7 days, this one we stock, or this one has a lead time of 10 days. Here are the performance differentials.”
Typically, between high-performance material manufacturers, you can see Dks within 0.1 between differing materials and loss tangents between 0.001 between different materials, and sometimes your design can handle that. If it can and the lead-time is much less, it's nice to have that option.
Matties: In terms of bringing new customers into the business, one of the things that we're looking at is the process of qualifying a vendor. There was a day when audits were just mandatory. Are you seeing a lot of audits demanded in your situation?
Hofer: I think the industry is moving towards allowing the AS9000 certification and the MIL-certification to circumvent the audits. We still see some of the bigger OEMs maintaining an in-house auditor that goes out and does auditing. We've had a couple of smaller aerospace customers hire a third-party auditor to come in and audit, but I can say as an average, on-site audits are trending downward, because with the AS9100 certification, you've got audits every year. With the MIL-spec certification, we've got audits every two years, and those audits aren't just come in for a day like the old ISO audit. It's a three-day, two-man party that comes in and thoroughly vets the system. They're allowing your internal process controls and the certifications to suffice versus on-site audits.
Matties: Regarding the topic of lowering costs, there's obviously a big demand for lowering costs.
Hofer: There's always a demand for lowering costs.
Matties: What strategies do you bring, not necessarily to take the profit out of what you're doing, but to help your customers lower their costs?
Hofer: That's a very good question and difficult for a quick-turn prototype house, because one of the best ways to lower cost is have it built slower—increase your lead time. What we do is offer lower-cost alternatives. We help with the stack-up and the DFM at the beginning. We try to run some processes as lean as possible. It would be great if I could run my raw material very lean and just bring in material as I need it, but unfortunately the cost versus gains on lead times is not there.
What we try to do is offer design assistance and stack-up assistance to help use the most cost-effective performance materials and to make sure that the design is robust and gets you what you want the first run.
Matties: Don't overbuild it, and don't over-materialize it.
Hofer: I've had several people say, “Wow, why don't they just build the whole board out of Rogers?” Well, it's not cost-effective. Run some FR-4 in there. That's a fifth to a tenth of the price of the Rogers, where you don't need the Rogers. I've had other customers come up and say, “I've heard Rogers doesn't bond well with FR-4.” Well, as a manufacturer who has run literally every part number of Rogers that they've made, I've mixed 90% of them with FR-4 and they all work great.
I think there are also some misconceptions with some designers not understanding that they can mix and match materials to make the most cost-effective package.Page 2 of 3
Suggested Items
I-Connect007 Editor’s Choice: Five Must-Reads for the Week
06/27/2025 | Nolan Johnson, I-Connect007While news outside our industry keeps our attention occupied, the big news inside the industry is the rechristening of IPC as the Global Electronics Association. My must-reads begins with Marcy LaRont’s exclusive and informative interview with Dr. John Mitchell, president and CEO of the Global Electronics Association. For designers, have we finally reached the point in time where autorouters will fulfill their potential?
Knocking Down the Bone Pile: Tin Whisker Mitigation in Aerospace Applications, Part 3
06/25/2025 | Nash Bell -- Column: Knocking Down the Bone PileTin whiskers are slender, hair-like metallic growths that can develop on the surface of tin-plated electronic components. Typically measuring a few micrometers in diameter and growing several millimeters in length, they form through an electrochemical process influenced by environmental factors such as temperature variations, mechanical or compressive stress, and the aging of solder alloys.
RTX, the Singapore Economic Development Board Sign MOU Outlining 10-year Growth Roadmap
06/20/2025 | RTXRTX and the Singapore Economic Development Board (EDB) have signed a Memorandum of Understanding (MoU) which outlines a 10-year roadmap to further long-term strategic collaboration in Singapore.
Indra Signs Agreement with AXISCADES to Boost Production of Cutting-Edge Systems in India
06/18/2025 | PRNewswireParis Air Show -- Indra and the Indian technology company AXISCADES have signed an agreement to collaborate on the production of solutions for the aerospace and defense markets.
GKN Aerospace Delivers First High Voltage EWIS System for Clean Aviation’s SWITCH Project
06/16/2025 | GKN AerospaceGKN Aerospace has completed and delivered the first high voltage Electrical Wiring Interconnection System (EWIS) for the Clean Aviation SWITCH project.