-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueSpotlight on India
We invite you on a virtual tour of India’s thriving ecosystem, guided by the Global Electronics Association’s India office staff, who share their insights into the region’s growth and opportunities.
Supply Chain Strategies
A successful brand is built on strong customer relationships—anchored by a well-orchestrated supply chain at its core. This month, we look at how managing your supply chain directly influences customer perception.
What's Your Sweet Spot?
Are you in a niche that’s growing or shrinking? Is it time to reassess and refocus? We spotlight companies thriving by redefining or reinforcing their niche. What are their insights?
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
Assemblers Play the ‘Revise or Wait’ Game With Designers
June 22, 2022 | Nolan Johnson, I-Connect007Estimated reading time: 2 minutes

Nolan Johnson recently spoke with Duane Benson at Milwaukee Electronics and Screaming Circuits. Duane was pointing out a trend in moving designs into production, which he termed “revise or wait.” This excerpt provides a preview of our exploration of similar topics involving supply chain issues, lead times, and proceeding forward despite the supply challenges.
Nolan Johnson: Duane, the idea of “revise or wait” is interesting. Tell me more.
Duane Benson: It really is. I keep going back to the old “build or buy” idea. See, there are people who say, “I can design that little module much better than someone else can.” But there are also submodules which nobody designs; almost nobody designs their own Bluetooth or Wi-Fi section of their circuit, for example. Instead, you buy a module. You have that decision, though: Are you going to build it, or are you going to buy it?
The “revise or wait” design methodology is very similar except, instead of gambling against your ability to design something better, you’re gambling against the supply chain. We’ve got vendors who are saying some components are out 52 weeks, and then they’re telling us they will be late even to that wait time. We can’t even ask about expedite fees until after those 52 weeks are over. So, what do you do?
Well, perhaps you’ve designed in one of these awesome new little power components that cut the size of your power supply in half; you don’t want to give that up. But is it worth it to wait an extra year before your design makes it to market? Sometimes the redesign will propagate off the board, throughout the system and all the way out to the packaging, but you must make that decision because a significant edge over your competition might be in the balance.
The fun part, of course, comes when the part manufacturer quotes you 52+ weeks, and you go ahead and spend a month redesigning a tiny little bit of the circuit, lay it out again, and get a couple of prototypes made—only to have the original manufacturer surprise you by saying, “Oh, by the way, we happened to get some fab capacity early. So, all those parts that we said you’d never ever be able to get? Here’s a bunch of them.”
That is absolutely the world we live in. Doesn’t matter if we like it or not, that’s where we are right now, and we must be willing to make those kinds of decisions. But trade-offs really are a big part of the stock-in-trade of the engineering world. "Revise or wait" is just another name for what we always do—create great things out of chaos.
I-Connect007 continues to cover industry topics and challenges. Subscribe to SMT007 Magazine, PCB007 Magazine and DESIGN007 Magazine to keep up with the industry conversations.
Testimonial
"The I-Connect007 team is outstanding—kind, responsive, and a true marketing partner. Their design team created fresh, eye-catching ads, and their editorial support polished our content to let our brand shine. Thank you all! "
Sweeney Ng - CEE PCBSuggested Items
Accelerating Embedded Innovation: Orthogone Becomes Texas Instruments Design Partner
09/17/2025 | PRNewswireOrthogone Technologies Inc., a leader in advanced embedded systems and FPGA development, is proud to announce its official designation as a Texas Instruments (TI) Design Services Partner.
BLT Joins Microchip Partner Program as Design Partner
09/17/2025 | BUSINESS WIREBLT, a U.S.-owned and operated engineering design services firm announced it has joined the Microchip Design Partner Program.
Staying on Top of Signal Integrity Challenges
09/16/2025 | Andy Shaughnessy, Design007 MagazineOver the years, Kris Moyer has taught a variety of advanced PCB design classes, both online IPC courses and in-person classes at California State University-Sacramento, where he earned his degrees in electrical engineering. Much of his advanced curriculum focuses on signal integrity, so we asked Kris to discuss the trends he’s seeing in signal integrity today, the SI challenges facing PCB designers, and his go-to techniques for controlling or completely eliminating SI problems.
American Standard Circuits to Exhibit and Host Lunch & Learn at PCB West 2025
09/17/2025 | American Standard CircuitsAnaya Vardya, President, and CEO of American Standard Circuits/ASC Sunstone Circuits has announced that his company will once again be exhibiting at PCB West 2025 to be held at the Santa Clara Convention Center on Wednesday, October 1, 2025.
ASM Technologies Limited signs MoU with the Guidance, Government of Tamilnadu to Expand Design-Led Manufacturing capabilities for ESDM
09/15/2025 | ASM TechnologiesASM Technologies Limited, a pioneer in Design- Led Manufacturing in the semiconductor and automotive industries, announced signing of Memorandum of Understanding (MoU) with the Guidance, Government of Tamilnadu whereby it will invest Rs. 250 crores in the state to expand its ESDM related Design-Led Manufacturing and precision engineering capacity. ASM Technologies will acquire 5 acres of land from the Government of Tamilnadu to set up a state-of-the-art design facility in Tamil Nadu's growing technology manufacturing ecosystem, providing a strong strategic advantage and long-term benefits for ASM.