-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueBox Build
One trend is to add box build and final assembly to your product offering. In this issue, we explore the opportunities and risks of adding system assembly to your service portfolio.
IPC APEX EXPO 2024 Pre-show
This month’s issue devotes its pages to a comprehensive preview of the IPC APEX EXPO 2024 event. Whether your role is technical or business, if you're new-to-the-industry or seasoned veteran, you'll find value throughout this program.
Boost Your Sales
Every part of your business can be evaluated as a process, including your sales funnel. Optimizing your selling process requires a coordinated effort between marketing and sales. In this issue, industry experts in marketing and sales offer their best advice on how to boost your sales efforts.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - smt007 Magazine
Tips & Tricks: What to Do if You Can't Have Reference Designators on Your Board
December 5, 2017 | Duane Benson, Screaming CircuitsEstimated reading time: 1 minute
The logical response to the question "What do you do if you can't have reference designators" is "Put them on the PC board." But the truth is, sometimes you can't have reference designators on your board. Perhaps it's because it's too densely populated and there isn't room. Or maybe, for aesthetic reasons, you've chosen to leave them off.
And with some products like development boards, it's sometimes necessary to use the space for instruction or functional identification, and reference designators would confuse your customers.
It's always best to put reference designators as close to the part as possible, and on the same side as the part, but if that's not possible, you can still create an assembly drawing. When laying out the board, put the reference designators in a different layer than the text you want in silk screen.
Then, create a PDF that has all of the component outlines in their place, with reference designators. Make one for the top and one for the bottom. You can call this document your "assembly drawing" and include it in the files you send in to be manufactured.
You might ask why PCB assemblers need reference designators when all the surface mount parts are machine assembled. First, any through-hole parts are hand assembled. Their locations and board side needs to be clear for the people stuffing them. Second, CAD systems don't always have 100 percent accurate information. If the center point of the footprint is off, surface mount machines will center the part where file says to put it, which could be the wrong spot.
The reference designators are also part of quality control. It's another opportunity to remove ambiguity. Ambiguity is bad. Certainty is good.
Suggested Items
The Knowledge Base: A CM’s Perspective on Box Build Practices
04/30/2024 | Mike Konrad -- Column: The Knowledge BaseIn the ever-evolving landscape of electronics manufacturing, the box-build process stands out as a critical phase that bridges the gap between individual component manufacturing and the delivery of a fully functional electronic system. This intricate procedure, encompassing the assembly of everything from PCBs to wire harnesses and mechanical enclosures, demands a high level of precision, efficiency, and innovation. As the electronics assembly industry expands and diversifies, understanding the best practices within box-build assembly has become paramount for manufacturers aiming to stay ahead in a competitive market.
Latest Test and Inspection Solutions from GOEPEL electronic at SMTconnect 2024
04/29/2024 | GOEPEL electronicGOEPEL electronic will be demonstrating automated test and inspection equipment at SMTconnect, taking place in Nuremberg from June 11 to 13, 2024.
Determining the Value-add of Box Build
04/24/2024 | Nolan Johnson, I-Connect007At a strategic level, adding box-building services makes sense for customer loyalty. But is it really that simple? Jon Schmitz, who manages customer engagement at RiverSide Integrated Solutions, talk about about what it really takes to be successful in offering EMS and final assembly services under the same company banner.
IMAPS & IPC to Host Onshoring Workshop
04/16/2024 | IPCThe International Microelectronics Assembly and Packaging Society (IMAPS) and IPC will host an Onshoring Workshop to discuss ongoing progress and forward-looking strategies to drive the Onshoring Advanced Packaging and Assembly, April 29 – May 1, 2024, in Arlington, Virginia.
IPC WinterCom 2024 Through the Eyes of One Dedicated Student
04/12/2024 | Sanjay Huprikar, IPCLauriane Testuz stands as a testament to the power of curiosity, perseverance, and the relentless pursuit of knowledge. Her story serves as a reminder that the path to success is often paved by an unwavering commitment to one's dreams.