-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueBox Build
One trend is to add box build and final assembly to your product offering. In this issue, we explore the opportunities and risks of adding system assembly to your service portfolio.
IPC APEX EXPO 2024 Pre-show
This month’s issue devotes its pages to a comprehensive preview of the IPC APEX EXPO 2024 event. Whether your role is technical or business, if you're new-to-the-industry or seasoned veteran, you'll find value throughout this program.
Boost Your Sales
Every part of your business can be evaluated as a process, including your sales funnel. Optimizing your selling process requires a coordinated effort between marketing and sales. In this issue, industry experts in marketing and sales offer their best advice on how to boost your sales efforts.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - smt007 Magazine
Koh Young Opens New North American Facility
October 28, 2019 | Andy ShaughnessyEstimated reading time: 6 minutes
Koh Young America recently opened its new corporate headquarters for the Americas outside of Atlanta, Georgia. I attended the open house and spoke with Joel Scutchfield, director of sales for the Americas, about the state-of-the-art facility and the benefits of relocating to the East Coast.
Andy Shaughnessy: I’m here at the Koh Young America open house for their new facility in Gwinnett County. Joel, tell us about this facility.
Joel Scutchfield: Absolutely, Andy. We’re incredibly happy to have you here today and have the opportunity to talk with you. For some time now, we’ve been planning for what we consider to be the next leap forward in improving the overall customer experience that we can offer. Our complete focus is on serving our customers in a much more aggressive, efficient, and all-encompassing way. To improve the customer experience, we needed a facility that allowed us to bring all the right people together from a collaboration perspective and have all of the right tools and systems in one place to provide training, demonstrations, and research for customer projects and applications. Now, we can better test new hardware, software, and special applications our customers bring us. Then, we can supply definitive results before installing a system on their floor.
Again, this facility is all about improving the customer experience for our customers and prospects. And from that, we feel that both our business and their business will grow, which is the key driver. We’re taking the approach of fostering happy customers for life, which is the whole edict behind our celebration today, and what we’ve achieved by opening this facility. It has been a lot of work to get to this point, but looking around today, it’s impressive. It’s an ultramodern facility, and we’re not even finished yet. We have a lot of ideas we still want to implement, plus processes and procedures in the way that we train and how we can best use the demonstration room. We want to help the customer and ensure when they leave here, they’re good to go. We want them to be power users of our systems and software that will enable them to drive their business forward.
Shaughnessy: You have the machines set up. How many machines do you have here?
Scutchfield: Currently, we have 10 machines installed in our demo room plus two in our training rooms, which represents various technologies that we serve, but we have room for about 15 fully outfitted. There have been discussions about bringing a system in from one of our pick-and-place partners to continue to evolve and develop the mount feedback initiative. We’re taking information from our pre-reflow AOI system and feeding that to the mounter for identification of anomalies with things like feeders, spindles, nozzles, etc., which all lead back to the self-correcting, self-healing line. There are lots of opportunities with that, and our facility allows us the space to do that and more.
Shaughnessy: So, it’s also for training. You could train customers, but if you have new people come on board, you can train them.
Scutchfield: Right, we have the demo area, plus separate training rooms for both SPI and AOI. Training is important to complement the demo and process verification initiatives, as I mentioned earlier. I sat in one of the other sessions here earlier in the day with a large group of our visiting customers. Training was one of the things I wanted to emphasize to them. We are making a concerted push to step up the capabilities of all our service and application team members by cross-training them to ensure we’re running a closed-loop system when it comes to how we execute our internal training. We want everyone to be well-trained and fresh as new systems and software are released. We also want to provide information to our customers on all aspects of new software, features, and even systems before they’re released into the field. Our field service engineers do a lot of field training. When a customer buys a machine, the field service engineers typically do the first round of training on the customer’s floor. So, we want to make sure they have been trained to our rigorous standards, including how to “train” someone properly, so it’s not all technical.
Shaughnessy: You’re training the trainer.
Page 1 of 2
Suggested Items
Micron First to Ship Critical Memory for AI Data Centers
05/01/2024 | MicronMicron Technology, Inc. announced it is leading the industry by validating and shipping its high-capacity monolithic 32Gb DRAM die-based 128GB DDR5 RDIMM memory in speeds up to 5,600 MT/s on all leading server platforms.
HQ NextPCB of HQ Electronics Debut on the International Stage for Electronics Manufacture at IPC APEX 2024
05/01/2024 | PRNewswireHQ NextPCB of HQ Electronics, a leading Chinese-based multilayer PCB manufacturer and assembly house showcased its industrial prowess on the international stage for the first time at the IPC APEX Expo 2024.
GPV’s Q1 2024 Interim Financial Report Shows Strong Navigation in Uncertain Times
05/01/2024 | GPVDanish-based GPV recorded an expected drop in sales to DKK 2.3 billion for the first quarter of 2024. The decline also affected the operating profit, which was DKK 155 million compared to DKK 179 million in the same quarter last year, although the EBITDA margin was maintained. In general, demand has been softer in 2024, but GPV continues to invest for the long-term and expects the trend to turn in the second half of 2024.
The Knowledge Base: A CM’s Perspective on Box Build Practices
04/30/2024 | Mike Konrad -- Column: The Knowledge BaseIn the ever-evolving landscape of electronics manufacturing, the box-build process stands out as a critical phase that bridges the gap between individual component manufacturing and the delivery of a fully functional electronic system. This intricate procedure, encompassing the assembly of everything from PCBs to wire harnesses and mechanical enclosures, demands a high level of precision, efficiency, and innovation. As the electronics assembly industry expands and diversifies, understanding the best practices within box-build assembly has become paramount for manufacturers aiming to stay ahead in a competitive market.
I-Connect007 Editor’s Choice: Five Must-Reads for the Week
04/26/2024 | Andy Shaughnessy, Design007 MagazineIn this week’s roundup, we have a variety of articles covering everything from design through assembly, and even box build. I’ve always wondered whether box build was all it was cracked up to be. Do customers really pick one EMS provider over another because one company offers box build? And if you’ve ever wanted to volunteer, IPC’s Thought Leaders Program is looking for a few good technologists to help them on their mission. Check out Stanton Rak’s article, which was published in the spring issue of IPC Community.