- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssuePower Integrity
Current power demands are increasing, especially with AI, 5G, and EV chips. This month, our experts share “watt’s up” with power integrity, from planning and layout through measurement and manufacturing.
Signal Integrity
If you don’t have signal integrity problems now, you will eventually. This month, our expert contributors share a variety of SI techniques that can help designers avoid ground bounce, crosstalk, parasitic issues, and much more.
Proper Floor Planning
Floor planning decisions can make or break performance, manufacturability, and timelines. This month’s contributors weigh in with their best practices for proper floor planning and specific strategies to get it right.
- Articles
- Columns
- Links
- Media kit
||| MENU - design007 Magazine
When Your Fabricator Is Late
April 3, 2020 | I-Connect007 Editorial TeamEstimated reading time: 2 minutes

The I-Connect007 Editorial Team recently had a wide-ranging discussion with John Watson, CID, of Legrand. Questions covered include, “What happens when your fabricator is late, whether it’s a prototype or volume production?” and, “What are the costs and ramifications up and down the chain?”
Andy Shaughnessy: You and I have spoken before about time to market, and how we’re all battling time. Let’s talk about what happens when one cog in the system is late. What are the costs?
John Watson: Time is the big issue that I hear about. The VPs at my company say, “We need to decrease our time to market,” because they see our competitors. The lead dog always gets that biggest piece of the pie if they can get out there with their product first.
Barry Matties: To that point, when you’re working with your fabricator, you place the order, and they give you a delivery date that then goes one, two, or three days late. What happens if they miss it by one day?
Watson: That has a significant impact.
Matties: From a designer’s point of view, what does that do to you?
Watson: It puts us in a place where you can’t put a number on it for how much market share you’ve lost. We have a lot of external things involved in our design process that throw monkey wrenches into it, such as tariffs because we do work with China. One of our places is in China, so we have some outside influences on our designs, but we try to keep it to a consistent schedule. We identify what we call “blockers” in what we’re trying to accomplish, meaning things that are blocking us both internally and externally. We need to identify those blockers and get them out of our way because those can constantly be problems. I would talk to the fabrication house about potential issues.
Happy Holden: The first thing you learn as a young engineer at Hewlett-Packard is breakeven time. It’s like ROI, but for designers. It came about because if design managers hit obstacles and they’re going to be late, they go to management and say, “I need more resources,” and managers say no. Lo and behold, they are late. Hewlett-Packard made money off of being the first to market. Then, Stanford MBAs used Professor William Ireson’s idea of break-even time, which the financial guys understood. Break-even time is when the profits have paid for all the R&D development money, so it’s not a return on investment. After the break-even time, you’re truly making a profit.
Matties: You had your schedule.
Holden: And if they were too late, they would pay us more.
Matties: Do they agree to that in advance?
Holden: Yes, before they ever took the orders. If they didn’t, they didn’t get any orders.
Matties: I don’t know many board shops that have a money-back guarantee for on-time delivery, so to speak, because it’s more than money back.
To read this entire interview, which appeared in the March 2020 issue of PCB007 Magazine, click here.
Testimonial
"We’re proud to call I-Connect007 a trusted partner. Their innovative approach and industry insight made our podcast collaboration a success by connecting us with the right audience and delivering real results."
Julia McCaffrey - NCAB GroupSuggested Items
ICT Symposium Review: Sustainability and the Circular Economy
10/09/2025 | Pete Starkey, I-Connect007It was pleasant autumnal weather as we made our way once again to Meriden, the nominal centre of England, for the 2025 Annual Symposium of the Institute of Circuit Technology. Delegates were welcomed by technical director Emma Hudson who introduced and moderated a skilfully coordinated programme, focused on the highly relevant theme of sustainability.
Circular Packaging Market to Reach $98.0 Billion by 2035
10/08/2025 | Fact.MRThe market's journey from USD 45.8 billion in 2025 to USD 98.0 billion by 2035 represents substantial growth, the market will rise at a CAGR of 7.9% demonstrating the accelerating adoption of sustainable packaging systems and circular economy solutions across food & beverage, personal care, and e-commerce sectors.
It’s Only Common Sense: Stop Whining About the Market—Outwork It
10/06/2025 | Dan Beaulieu -- Column: It's Only Common SenseWhenever the market hiccups or the industry cycle dips, I hear the same tired chorus: “The market is down. Customers aren’t buying. What can we do? We just have to wait it out.” Nonsense. If you think that by showing up, opening your doors, and waiting for the economy to smile kindly upon you, that success will follow, you are in the wrong business. Worse yet, you’re living in the wrong mindset. Most people don’t want to hear the truth that winners find business in down cycles. Losers blame the economy.
Schweizer Ends Staff Restructuring Measures and Short-Time Working at the Schramberg Site
10/01/2025 | Schweizer Electronic AGSchweizer Electronic AG has implemented comprehensive measures to adjust its cost and personnel structure at its Schramberg site due to strong market fluctuations in the automotive and industrial electronics sector. Thanks to the successful restructuring, short-time working can now be ended with immediate effect. A stable order situation is expected for the fourth quarter, with signs of growth momentum returning in 2026.
American Standard Circuits to Exhibit at the Battery Show 2025
09/24/2025 | American Standard CircuitsAmerican Standard Circuits/ASC Sunstone Circuits will be exhibiting at the Battery Show North America to be held at Huntington Place in Detroit, Michigan, October 6-9, 2025.