-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueSignal Integrity
If you don’t have signal integrity problems now, you will eventually. This month, our expert contributors share a variety of SI techniques that can help designers avoid ground bounce, crosstalk, parasitic issues, and much more.
Proper Floor Planning
Floor planning decisions can make or break performance, manufacturability, and timelines. This month’s contributors weigh in with their best practices for proper floor planning and specific strategies to get it right.
Showing Some Constraint
A strong design constraint strategy carefully balances a wide range of electrical and manufacturing trade-offs. This month, we explore the key requirements, common challenges, and best practices behind building an effective constraint strategy.
- Articles
- Columns
- Links
- Media kit
||| MENU - design007 Magazine
Designing in a Vacuum Q&A: Nick Barbin
June 7, 2022 | Andy Shaughnessy, Design007 MagazineEstimated reading time: 3 minutes

Optimum Design Associates President Nick Barbin has worn a lot of hats in this industry, from PCB designer to EMS company owner. We asked Nick to share his thoughts on what it’s like to design in a vacuum, while offering some strategies for escaping the vacuum.
Andy Shaughnessy: How often do you design a board without knowing who is going to fabricate and/or assemble it?
Nick Barbin: As a PCB design service provider, we are generally not always privy to this information unless we ask, and at Optimum, we do ask. It’s not so much that we care about the “who” aspect; it’s more about being in alignment with the specific manufacturer’s capabilities to ensure we are providing a design that meets our customer’s objectives for cost and reliability. This is especially important in the case of fabrication shops where capabilities tend to vary dramatically and can result in the shop requesting to modify the artwork to be able to meet the specifications called out.
Shaughnessy: Why do so many designers not know who is going to manufacture their boards?
Barbin: In the case of fabrication shops, once an OEM has qualified multiple vendors to build their boards, purchasing departments will consider that part number a commodity item, since it is generally one of the highest-cost items on any given bill of materials (BOM). In some cases, the OEM allows the commodity manager (CM) to choose the fabrication vendor. Because of these dynamics, it is very difficult for designers to keep track of specific vendors. Designers should have a pretty good idea of who their CM partner is, as most OEMs have one strategic vendor they rely on. Global time differences and language barriers may also contribute to designers not knowing who’s manufacturing their boards.
Shaughnessy: What other missing information or data do you find yourself having to “design around?”
Barbin: We believe designing around missing data is a mistake with unknown consequences. If there are missing datasheets or constraints that are truly missing, all efforts must be made to acquire the data or receive a satisfactory sign-off before moving forward. I cannot think of one instance where anything else would be acceptable.
Shaughnessy: When you find yourself designing in a vacuum, what tricks have you devised as workarounds to get the job done?
Barbin: Whether we are designing in a vacuum, at Optimum, we have documented our DFM (design for manufacturing) guidelines in our Designer Handbook so each of our designers have best DFM practices at their fingertips. Additionally, each designer has a checklist of over 90 items, many of which pertain to DFM, that must be checked off as completed or considered for each design that is delivered. This is part of our ISO 9001-2015 quality control system. Lastly, each design must pass through a DFM check using the Valor NPI software from Siemens. It is Optimum’s objective to ensure each of our designers deliver data for their respective designs to the downstream manufacturers that is both comprehensive and manufacturable to each of our customer requirements.
Shaughnessy: What are some of the hidden costs, in addition to monetary, of designing in a vacuum?
Barbin: Delayed time to market certainly comes to mind. The minute a released manufacturing package cannot be manufactured as-is and needs to be modified, the project is immediately put on hold waiting for approvals or answers. This can delay the development cycle by days and weeks as it progresses through many email mailboxes.
To read this entire conversation, which appeared in the May 2022 issue of Design007 Magazine, click here.
Testimonial
"The I-Connect007 team is outstanding—kind, responsive, and a true marketing partner. Their design team created fresh, eye-catching ads, and their editorial support polished our content to let our brand shine. Thank you all! "
Sweeney Ng - CEE PCBSuggested Items
U.S. Manufacturing Jobs Decline Amid Tariffs and Immigration Crackdown
09/17/2025 | I-Connect007 Editorial TeamManufacturers in the U.S. are cutting jobs even as President Donald Trump pushes policies he says will revitalize the industry. Employers shed 12,000 manufacturing jobs in August, while payrolls in the sector have fallen by 42,000 since April, according to a new analysis from the Center for American Progress (CAP) based on government labor data.
Richardson Electronics Appoints Daniel Albers to Drive Made-in-USA Contract Manufacturing Expansion
09/17/2025 | Globe NewswireRichardson Electronics, Ltd., a global provider of engineered solutions for the green energy, power management, and custom display markets, announced the appointment of Daniel Albers to spearhead business development for its expanded, Made-in-USA contract manufacturing efforts.
GlobalFoundries Joins World Economic Forum’s Global Lighthouse Network for Manufacturing Excellence
09/17/2025 | GlobalFoundriesGlobalFoundries announced that the World Economic Forum (WEF) has designated its 300mm fab in Singapore as part of the Global Lighthouse Network (GLN) of advanced manufacturers.
STMicroelectronics to Advance Next-generation Chip Manufacturing Technology with New PLP Pilot Line in Tours, France
09/17/2025 | STMicroelectronicsSTMicroelectronics, a global semiconductor leader serving customers across the spectrum of electronics applications, today announced new details regarding the development of the next generations of Panel-Level Packaging (PLP) technology through a pilot line in its Tours site, France, which is expected to be operational in Q3 2026.
Indium President and CEO to Deliver ELCINA CEO Forum Keynote at Productronica India
09/17/2025 | Indium CorporationIndium Corporation President and CEO Ross Berntson will deliver the Electronic Industries Association of India (ELCINA) CEO Forum keynote at Productronica India, to be held September 17-19 in Bengaluru, India.