-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueProduction Software Integration
EMS companies need advanced software systems to thrive and compete. But these systems require significant effort to integrate and deploy. What is the reality, and how can we make it easier for everyone?
Spotlight on India
We invite you on a virtual tour of India’s thriving ecosystem, guided by the Global Electronics Association’s India office staff, who share their insights into the region’s growth and opportunities.
Supply Chain Strategies
A successful brand is built on strong customer relationships—anchored by a well-orchestrated supply chain at its core. This month, we look at how managing your supply chain directly influences customer perception.
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
Book Excerpt: The Printed Circuit Assembler’s Guide to... Factory Analytics, Chapter 4
September 11, 2024 | I-Connect007 Editorial TeamEstimated reading time: 1 minute

Excerpt from: The Printed Circuit Assembler’s Guide to... Factory Analytics, by Julie Cliche-Dubois, Cogiscan
Chapter 4: Data Analytics: Beyond SMT
Let’s dive into what matters post-SMT: test, rework, and other back-end processes required to complete product assembly.
The less rework performed, the better. The rework process ranges in the type of work needed, but usually consists of hand and manual operations to rework PCBA defects. Whether manually placing components or resoldering poor quality connections, rework always eats into resources (materials and time), so these processes require extra attention to be fully optimized.
Rework
REWORK TECHNICIAN: The rework technician does the actual rework tasks. In order to do so correctly, the technician needs clear instructions and visual documentation guides. Ideally, a user-friendly interface covers the required steps, as well as all defect details with visual support of the affected PCBA.
Having access to rework-related KPIs helps to ensure this process is done both correctly and efficiently. Key analytics to monitor during this process include:
Time to perform rework
- Whether for the rework technician or for management, the amount of time the work requires is important to measure. This is not only important to better understand the true cost of rework, but also to help improve the process itself.
- Setting benchmarks with this information, the technician has a better understanding of how much time will be needed for various types of rework tasks.
First pass yield after rework
- This KPI measures how many good units are coming out of the rework process versus the total number of units. Indicating the quality of work, it can quickly illustrate when improvements are necessary.
Testimonial
"The I-Connect007 team is outstanding—kind, responsive, and a true marketing partner. Their design team created fresh, eye-catching ads, and their editorial support polished our content to let our brand shine. Thank you all! "
Sweeney Ng - CEE PCBSuggested Items
Advanced Rework Technology Inspires Students at National Manufacturing Day 2025
10/08/2025 | A.R.T. Ltd.Advanced Rework Technology Ltd. (A.R.T.), a leading independent IPC-accredited training provider, joined forces with Jaltek, a UK-based electronics manufacturer with over 35 years’ experience in designing and producing high-quality electronic products, to deliver hands-on workshops for students during National Manufacturing Day 2025.
The Training Connection, LLC Welcomes Industry Veteran Jack Harris to Lead Training Partnerships
10/07/2025 | The Training Connection LLCThe Training Connection, LLC (TTC-LLC), a premier provider of test engineering and development training, is proud to announce that Jack Harris, one of the most recognized names in electronics manufacturing training and technical development, has joined the company as Relationship Lead, Training.
Knocking Down the Bone Pile: Best Practices for Electronic Component Salvaging
09/17/2025 | Nash Bell -- Column: Knocking Down the Bone PileElectronic component salvaging is the practice of recovering high-value devices from PCBs taken from obsolete or superseded electronic products. These components can be reused in new assemblies, reducing dependence on newly purchased parts that may be costly or subject to long lead times.
More Than a Competition: Instilling a Champion's Skill in IPC Masters China 2025
09/01/2025 | Evelyn Cui, Global Electronics Association—East AsiaNearly 500 elite professionals from the electronics industry, representing 18 provinces and municipalities across China, competed in the 2025 IPC Masters Competition China, March 26–28, in Pudong, Shanghai. A total of 114 contestants advanced to the practical competition after passing the IPC Standards Knowledge Competition. Sixty people competed in the Hand Soldering and Rework Competition (HSRC), 30 in the Cable and Wire Harness Assembly Competition (CWAC), and 24 in the Ball Grid Array/Bottom Termination Components (BGA/BTC) Rework Competition.
BEST Inc. Provides High-Reliability BGA Reballing and Component Rework Services
08/22/2025 | BEST Inc.BEST Inc., a leader in electronic component services, is pleased to announce its component rework services are available for all types of area array devices including ball grid array, land grid array and quad flat no-lead SMT packages.