-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueRules of Thumb
This month, we delve into rules of thumb—which ones work, which ones should be avoided. Rules of thumb are everywhere, but there may be hundreds of rules of thumb for PCB design. How do we separate the wheat from the chaff, so to speak?
Partial HDI
Our expert contributors provide a complete, detailed view of partial HDI this month. Most experienced PCB designers can start using this approach right away, but you need to know these tips, tricks and techniques first.
Silicon to Systems: From Soup to Nuts
This month, we asked our expert contributors to weigh in on silicon to systems—what it means to PCB designers and design engineers, EDA companies, and the rest of the PCB supply chain... from soup to nuts.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - design007 Magazine
The Electronic Component Shortage Crisis: A Veteran Engineer’s Perspective
February 18, 2019 | John Watson, CID, Legrand Inc.Estimated reading time: 1 minute
Most of us are familiar with the defense readiness condition (DEFCON) levels. If we could apply such a DEFCON level to the electronics industry and how it relates to the issue of component shortages, we would be sitting at a DEFCON 1, meaning nuclear war is imminent.
This issue has a huge effect on everyone who works in the electronics field, impacting schedules and how things are done. The problem began to hit in earnest about a year ago in 2017. It first appeared as longer lead times on multilayer ceramic capacitors (MLCCs) and tantalum capacitors. With longer lead times, the available stock began to disappear, and before we knew it, we had a perfect storm and an international crisis.
From where we stand now, at the beginning of 2019, we see lead times for some components in the short range of up to 16 weeks; medium-to-high is 32 weeks, and long lead times are as far out as 80 weeks. In other words, if we ordered a component today, it would arrive in over a year a half from now (maybe).
This all started with the capacitors (we will see why later), but we now see other component series being sucked into this problem.
With such volatility in the market, it has brought those who were not prepared for it to a standstill.
What Is Driving This Crisis?
It has come down to a simple principle of economics supply and demand. While the supply has gone way down, the demand for many components has exploded. The component manufacturers have not kept pace with the demand for several reasons.
There are three main sectors of the electronic industry driving these component shortages.
To read this article, which appeared in the January 2019 issue of Design007 Magazine, click here.
Suggested Items
Biden-Harris Administration: CHIPS Incentives Award to TSMC Arizona
11/15/2024 | U.S. Chamber of CommerceTSMC Arizona Corporation (TSMC Arizona), a subsidiary of Taiwan Semiconductor Manufacturing Company Limited (TSMC), up to $6.6 billion in direct funding under the CHIPS Incentives Program’s Funding Opportunity for Commercial Fabrication Facilities.
Naprotek Welcomes Aerospace and Defense Veteran to Board of Directors
11/12/2024 | Naprotek, Inc.Naprotek, LLC, a leading provider of mission-critical electronics technology solutions, today announced the addition of Jeff Hassannia to its Board of Directors.
Sustainability and Profitability: WHMA Annual Global Leadership Summit Offers Workshop Topics that Impact Wire and Cable Industry
11/11/2024 | IPCTwo career enriching topics of great interest to the wire and cable industry, sustainability and profitability will be covered during WHMA’s Annual Global Leadership Summit, January 28-30, 2025 in Fort Myers, Fla.
The Quest for Perfect Products
11/11/2024 | Marcy LaRont, I-Connect007Anna-Katrina Shedletsky is a former Apple engineer who formed her own company, Instrumental, to address what she felt were frustrating and costly engineering problems and inefficiencies at Apple. She’s passionate about her quest to build perfect products faster than ever before. In this interview, Anna shares her journey from creating innovative products like the Apple Watch to addressing the complexities of failure analysis in manufacturing. She also discusses an upcoming educational webinar she is hosting with Valentina Ratner, CEO of AllSpice.io, for engineering leaders in the manufacturing space. They look forward to providing “real talk” and value to their engineering colleagues.
Cicor Expands into Sweden with Plans to Strengthen Market Position in Germany
11/08/2024 | CicorCicor Group has acquired the Swedish development company Nordic Engineering Partner AB and thus establishes a significant presence in the Nordics. Additionally, Cicor is in advanced negotiations to acquire another German EMS provider.