-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueRules of Thumb
This month, we delve into rules of thumb—which ones work, which ones should be avoided. Rules of thumb are everywhere, but there may be hundreds of rules of thumb for PCB design. How do we separate the wheat from the chaff, so to speak?
Partial HDI
Our expert contributors provide a complete, detailed view of partial HDI this month. Most experienced PCB designers can start using this approach right away, but you need to know these tips, tricks and techniques first.
Silicon to Systems: From Soup to Nuts
This month, we asked our expert contributors to weigh in on silicon to systems—what it means to PCB designers and design engineers, EDA companies, and the rest of the PCB supply chain... from soup to nuts.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - design007 Magazine
Design for the Unknown
June 20, 2019 | Kelly Dack, CID+, EPTACEstimated reading time: 2 minutes
Our industry loves DFx, also known as the “Design Fors.” As PCB designers, we not only design for manufacturability (DFM) but we design for assembly, reliability, cost, test, and many more factors which we like to lump together as DFx. But now, I think it’s time we embrace a new DFx: Design for the Unknown, or DFU.
I’m a firm believer that electronics development really does start with the PCB designer. I am a big fan of Stephen Covey’s The 7 Habits of Highly Effective People. I especially like to practice habit No. 2 when beginning a new PCB project: Start with the end in mind. All too often, project teams seem to push ahead with only what is known about a project at the time, even to the point of starting the PCB layout. Proceeding on risk is a strategy that project teams use to make progress on a project despite not having all of the data or constraints.
But proceeding on risk may only have only a small chance of working out. When incorrect assumptions are made about a product, great amounts of resources will most certainly be wasted. Years ago as a salaried PCB designer, I’d eagerly pushed ahead on design layouts overnight, on risk, only to be informed by a program manager the next morning that an assumed board outline or component needed to change. This affected the entire layout! Assumed risk in these cases obliterated hundreds of healthy sleeping hours of my life that I’ll never get back. I needed a new strategy.
Thereafter, besides committing to design PCBs on an hourly basis, I sought to discipline myself to get all of the blanks filled before starting a PCB layout. I would do better at starting a PCB layout with the end in mind because “the end” is the culmination and validation of so many critical details which the design started with in the first place.
Where will this PCBA be manufactured? What types of equipment will be used? What are the potential volumes? What is the environment in which the PCBA will operate? How about that materials list—are we sure all of the parts are available? It all begins with design and to me, designing with the end in mind means putting all of the parts together in an organized way which would facilitate meeting all of the PCB performance and manufacturing constraints.
But in the past I found myself waiting for the blanks to be filled in. The project timelines began to slip and I had not even begun placement of any of the parts. Slap! (Figuratively, of course.) I vowed to never again find myself in the awkward position of having nothing to show at the end of a project timeline. “I’m waiting on…” is never a good strategy. Corporate management folks who report to stockholders would rather show a poorly designed PCB progress as opposed to no PCB at all.
To read this entire article, which appeared in the June 2019 issue of Design007 Magazine, click here.
Suggested Items
PCB Layout Rules of Thumb for Consideration
11/25/2024 | Patrick Davis, Cadence Design SystemsJust because a “rule of thumb” is usually based on experience instead of precise facts doesn’t negate its value. For instance, when I told my kids that a good rule of thumb was not to back-talk to their mother, they discovered very quickly how accurate my advice was once they crossed that line. There are a lot of rules of thumb that we rely on daily, including those that apply to PCB design.
HPC Customer Engages Sondrel for High End Chip Design
11/25/2024 | SondrelSondrel, a leading provider of ultra-complex custom chips, has announced that it has started front end, RTL design and verification work on a high-performance computing (HPC) chip project for a major new customer.
Rules of Thumb for PCB Layout
11/21/2024 | Andy Shaughnessy, I-Connect007The dictionary defines a “rule of thumb” as “a broadly accurate guide or principle, based on experience or practice rather than theory.” Rules of thumb are often the foundation of a PCB designer’s thought process when tackling a layout. Ultimately, a product spec or design guideline will provide the detailed design guidance, but rules of thumb can help to provide the general guidance that will help to streamline the layout process and avoid design or manufacturing issues.
PCB Design Software Market Expected to Hit $9.2B by 2031
11/21/2024 | openPRThis report provides an overview of the PCB design software market, detailing key market drivers, challenges, technological advancements, regional dynamics, and future trends. With a projected compound annual growth rate (CAGR) of 13.4% from 2024 to 2031, the market is expected to grow from USD 3.9 billion in 2024 to USD 9.2 billion by 2031.
KYZEN to Spotlight KYZEN E5631, AQUANOX A4618 and Process Control at SMTA Silicon Valley Expo and Tech Forum
11/21/2024 | KYZEN'KYZEN, the global leader in innovative environmentally friendly cleaning chemistries, will exhibit at the SMTA Silicon Valley Expo & Tech Forum on Thursday, December 5, 2024 at the Fremont Marriott Silicon Valley in Fremont, CA.