-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueRules of Thumb
This month, we delve into rules of thumb—which ones work, which ones should be avoided. Rules of thumb are everywhere, but there may be hundreds of rules of thumb for PCB design. How do we separate the wheat from the chaff, so to speak?
Partial HDI
Our expert contributors provide a complete, detailed view of partial HDI this month. Most experienced PCB designers can start using this approach right away, but you need to know these tips, tricks and techniques first.
Silicon to Systems: From Soup to Nuts
This month, we asked our expert contributors to weigh in on silicon to systems—what it means to PCB designers and design engineers, EDA companies, and the rest of the PCB supply chain... from soup to nuts.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - design007 Magazine
Contract Extension Takes NASA-Boeing Partnership for Orbiting Laboratory Into Third Decade
July 16, 2020 | BoeingEstimated reading time: 1 minute
Boeing, NASA’s lead industry partner for the International Space Station (ISS) since 1993, will continue supporting the celebrated orbiting laboratory through September of 2024 under a $916 million contract extension awarded today.
Boeing will provide engineering support services, resources, and personnel for activities aboard the ISS and manage many of the station’s systems. Work will be done at the Lyndon B. Johnson Space Center in Houston; the John F. Kennedy Space Center at Cape Canaveral, Florida; and Marshall Space Flight Center in Huntsville, Alabama, as well as other locations around the world. The contract is valued at about $225 million annually.
“As the International Space Station marks its 20th year of human habitation, Boeing continues to enhance the utility and livability of the orbiting lab we built for NASA decades ago,” said John Mulholland, Boeing vice president and program manager for the International Space Station. “We thank NASA for their confidence in our team and the opportunity to support the agency’s vital work in spaceflight and deep-space exploration for the benefit of all humankind.”
Congress, NASA and its international partners have agreed to extend ISS operations to at least 2024. Recent structural analysis shows that the spacecraft continues to be safe and mission-capable.
NASA selected Boeing as the ISS prime contractor in 1993. Throughout development, assembly, habitation and daily operations aboard ISS, Boeing has partnered closely with NASA to help the agency and its international partners safely host astronauts and cosmonauts for months at a time. The astronauts conduct microgravity experiments that help treat disease, increase food production, and manufacture technology impossible to produce on Earth’s surface.
Boeing people have contributed to human spaceflight for more than 50 years, including the Mercury and Gemini capsules; development of the Saturn V rocket; Apollo command and service modules; and space shuttle fleet, in addition to the ISS. Boeing is building on this legacy with its CST-100 Starliner, a spacecraft developed in partnership with NASA’s Commercial Crew Program. The company is also building the core stage of NASA’s Space Launch System, a rocket powerful enough to lift astronauts and spacecraft to destinations beyond Earth orbit, such as lunar orbit and Mars.
Suggested Items
L3Harris Electronic Warfare System Completes Safety of Flight Testing
11/08/2024 | L3 TechnologiesL3Harris Technologies has completed Safety of Flight (SOF) qualification on its Viper Shield™ all-digital electronic warfare (EW) suite for F-16 fighter jets. The company will provide the advanced capability to F-16 fleets for six international partners.
Real Time with... SMTAI 2024: The Value of Experience in Outsourced Assembly Services
11/08/2024 | Real Time with...SMTAINolan Johnson interviews Alan Couchman, president of Process Sciences, Inc. during SMTAI 2024. Couchman discusses the opportunities and benefits to being an outsourced assembly services company based in Austin, Texas.
Real Time with... SMTAI 2024: Coating Solutions for Every Size from ECT
11/07/2024 | Real Time with...SMTAIErick Campos reviews the one-stop coatings solutions offered by ECT, ranging from coating services to equipment installation and training.
Real Time with... SMTAI 2024: SPEA Brings Added Sophistication to Board Testing Capabilities
11/05/2024 | Real Time with...SMTAILuca Fanelli describes SPEA's new AI-based optical inspection technology and shares a powerful example from the field. He also updates Nolan Johnson on SPEA's organizational growth meant to improve customer value.
Real Time with... SMTAI 2024: Post-event Excitement and Momentum
11/05/2024 | Real Time with...SMTAIOn the last day of SMTA International 2024 Nolan Johnson had the opportunity to speak with Ryan Flaherty, SMTA's director of communications, to reflect on a return to Rosemont and a full week of activities at this year's big event.