-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueAll About That Route
Most designers favor manual routing, but today's interactive autorouters may be changing designers' minds by allowing users more direct control. In this issue, our expert contributors discuss a variety of manual and autorouting strategies.
Creating the Ideal Data Package
Why is it so difficult to create the ideal data package? Many of these simple errors can be alleviated by paying attention to detail—and knowing what issues to look out for. So, this month, our experts weigh in on the best practices for creating the ideal design data package for your design.
Designing Through the Noise
Our experts discuss the constantly evolving world of RF design, including the many tradeoffs, material considerations, and design tips and techniques that designers and design engineers need to know to succeed in this high-frequency realm.
- Articles
- Columns
- Links
- Media kit
||| MENU - design007 Magazine
Boeing, Salt River Project Sign Renewable Energy Agreement for Mesa Site
September 11, 2020 | BoeingEstimated reading time: 1 minute
Boeing and the Salt River Project (SRP) utility have signed a multi-year agreement to power Boeing’s Mesa site with renewable solar energy.
Boeing will be one of several companies to receive power from SRP’s soon-to-be-built 100-megawatt solar photovoltaic plant in Eloy, Arizona. Boeing’s Mesa site will receive about 25% of its electricity needs from this plant over the next 15 years. This supports the company’s overall goal to reduce greenhouse gas emissions 25% by 2025, and ultimately power operations with 100% renewable energy.
“It makes sense to take advantage of renewable solar energy at a location that enjoys 295 days of sunshine a year,” said Beth Schryer, Boeing vice president of Facilities & Asset Management. “This will help offset the same amount of energy equivalent to that used in one year by 670 average U.S. homes.”
SRP’s 700-acre Eloy plant is expected to begin operation in December 2021. Located approximately 50 miles from the plant is Boeing’s Mesa site. The Mesa site produces Apache helicopters and houses various corporate, commercial and defense teams in more than 40 buildings. Boeing employs more than 4,600 people in Arizona, with most based in Mesa.
“Boeing’s longstanding vision of improving the environment and reducing carbon emissions is a natural fit for the SRP Sustainable Energy Offering,” said Jim Pratt, SRP Associate General Manager and Chief Customer Executive. “We appreciate customers like Boeing working with us on this collaborative initiative to invest in renewable energy that not only helps them achieve their aerospace industry sustainability goals, but does so at an affordable cost.”
This agreement expands Boeing’s leadership in the use of renewable energy and energy efficiency. Two Boeing sites – Renton, Washington, and Charleston, South Carolina – use 100% renewable energy today. The company is also ranked 17th on the EPA’s Green Power Partnership Fortune 500® Partners List, and has been named an EPA ENERGY STAR® Partner of the Year for 10 years running.
Suggested Items
Moog Announces Acquisition of COTSWORKS
07/07/2025 | BUSINESS WIREMoog Inc., a worldwide designer, manufacturer and systems integrator of high-performance precision motion and fluid controls and control systems, announced the acquisition of COTSWORKS Inc., an aerospace and defense fiber optics transceiver component manufacturer, for a purchase price of $63 million.
S&K Aerospace Awarded Major Contract Under DLA Maritime Acquisition Advancement Program
07/02/2025 | BUSINESS WIRES&K Aerospace, LLC has been awarded a significant contract under the Defense Logistics Agency’s (DLA) Maritime Acquisition Advancement Program, managed by the U.S. Naval Supply Command - Weapon Systems Support (NAVSUP WSS) in Mechanicsburg, PA.
Green Circuits to Exhibit Full-Service Electronics Manufacturing Solutions at 2025 SMD Symposium
07/02/2025 | Green CircuitsGreen Circuits, a full-service Electronics Manufacturing Services (EMS) partner to leading OEMs, is pleased to announce its participation in the 2025 SMD Symposium, taking place August 5-7 at the Von Braun Center in Huntsville, Alabama.
I-Connect007 Editor’s Choice: Five Must-Reads for the Week
06/27/2025 | Nolan Johnson, I-Connect007While news outside our industry keeps our attention occupied, the big news inside the industry is the rechristening of IPC as the Global Electronics Association. My must-reads begins with Marcy LaRont’s exclusive and informative interview with Dr. John Mitchell, president and CEO of the Global Electronics Association. For designers, have we finally reached the point in time where autorouters will fulfill their potential?
Knocking Down the Bone Pile: Tin Whisker Mitigation in Aerospace Applications, Part 3
06/25/2025 | Nash Bell -- Column: Knocking Down the Bone PileTin whiskers are slender, hair-like metallic growths that can develop on the surface of tin-plated electronic components. Typically measuring a few micrometers in diameter and growing several millimeters in length, they form through an electrochemical process influenced by environmental factors such as temperature variations, mechanical or compressive stress, and the aging of solder alloys.