-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueSilicon to Systems: From Soup to Nuts
This month, we asked our expert contributors to weigh in on silicon to systems—what it means to PCB designers and design engineers, EDA companies, and the rest of the PCB supply chain... from soup to nuts.
Cost Drivers
In this month’s issue of Design007 Magazine, our expert contributors explain the impact of cost drivers on PCB designs and the need to consider a design budget. They discuss the myriad design cycle cost adders—hidden and not so hidden—and ways to add value.
Mechatronics
Our expert contributors discuss the advent of mechatronics in PCB design, the challenges and opportunities this creates for circuit board designers, and the benefits—to the employee and the company—of becoming a mechatronics engineer.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - design007 Magazine
NASA to Air Third Spacewalk to Install New Station Solar Arrays
June 24, 2021 | NASAEstimated reading time: 2 minutes
Two astronauts will venture outside the International Space Station Friday, June 25, for a third spacewalk to continue power system upgrades that are already increasing output and proving the technology that will enable NASA’s future Gateway lunar outpost.
Live coverage will begin at 6:30 a.m. EDT on NASA Television, the agency’s website, and the NASA app, with the crew members scheduled to exit the station’s Quest airlock around 8 a.m. The spacewalk will last approximately 6 hours, 30 minutes.
Shane Kimbrough of NASA and Thomas Pesquet of ESA (European Space Agency) will install and deploy the second of six new ISS Roll-Out Solar Arrays (iROSA) on the station’s 4B power channel.
Pesquet will be extravehicular crew member 1 (EV 1), with red stripes on his spacesuit, while Kimbrough will be extravehicular crew member 2 (EV 2), with an unmarked suit. During the spacewalk, Pesquet will secure himself to the end of the station’s robotic Canadarm2 then grasp the iROSA. Operating from inside the station, NASA astronaut Megan McArthur, with NASA astronaut Mark Vande Hei serving as backup, will command the robotic arm to maneuver Pesquet and the array as close as possible to the installation location.
The spacewalk will follow two other recent spacewalks. On June 16, Kimbrough and Pesquet moved the first iROSA to a mounting bracket on the 2B power channel on the port 6 truss, where it was secured in its folded configuration. On June 20, the duo returned to the 2B power channel to complete installation and deployment.
This will be the fifth spacewalk for Kimbrough and Pesquet working together and the ninth spacewalk for Kimbrough and the fifth for Pesquet overall. Kimbrough and Pesquet previously conducted two spacewalks together during Expedition 50 in January and March 2017. It will be the 241st spacewalk in support of station assembly, maintenance, and upgrades.
The current solar arrays are functioning well, but have begun to show signs of degradation, as expected, as they were designed for a 15-year service life. The first pair of the space station’s original solar arrays were deployed in December 2000 and have been powering the station for more than 20 years. The new solar arrays are being positioned in front of six of the current arrays, increasing the station’s total available power from 160 kilowatts to a maximum of 215 kilowatts. The same solar array design will be used to power elements of the agency’s Gateway lunar-orbiting outpost.
In November 2020, the International Space Station surpassed its 20-year milestone of continuous human presence, providing opportunities for unique research and technological demonstrations that help prepare for long-duration missions to the Moon and Mars and also improve life on Earth. In that time, 244 people from 19 countries have visited the orbiting laboratory that has hosted nearly 3,000 research investigations from researchers in 108 countries and areas.
Suggested Items
GPV Enters Power Purchase Agreement for Danish Solar Park
09/26/2024 | GPVRecently, GPV entered into a Power Purchase Agreement (PPA) with Reel for its Danish entities. The PPA supports the construction of a 14,00 GWh/year solar park situated at Mesballe on Djursland in Denmark.
Home Energy Management Systems Booming in Europe and North America
09/16/2024 | Berg InsightBerg Insight, the world’s leading IoT market research provider, today released a new market report covering the Home Energy Management Systems (HEMS) market. In this study, a HEMS is defined as a system that at minimum consists of a solar PV system, battery storage system and a web-based management portal or smartphone app that allows for remote monitoring and control of the system.
Airbus Ships the Third European Service Module to Cape Canaveral on Behalf of ESA
08/23/2024 | AirbusOrion’s third European Service Module (ESM-3) is leaving Airbus’ facilities in Bremen, Germany, and heading to NASA’s Kennedy Space Center in Florida, USA, where it will be assembled and tested with the Crew Module.
Terran Orbital’s Pathfinder-R and Pathfinder-4 Scheduled for Launch
08/16/2024 | BUSINESS WIRETerran Orbital Corporation, a global leader in satellite-based solutions primarily serving the aerospace and defense industries, announced the scheduled launch of its Pathfinder-R (PTD-R) and Pathfinder-4 (PTD-4) spacecraft.
We Energies, Foxconn Complete Clean Energy Project in Wisconsin
07/25/2024 | FoxconnWe Energies, a Wisconsin-based utility company of WEC Energy Group, and Hon Hai Technology Group (Foxconn) are pleased to announce the completion of a solar panel installation project at Foxconn’s Science and Technology Park in Mount Pleasant, Wisconsin.