-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueThe Hole Truth: Via Integrity in an HDI World
From the drilled hole to registration across multiple sequential lamination cycles, to the quality of your copper plating, via reliability in an HDI world is becoming an ever-greater challenge. This month we look at “The Hole Truth,” from creating the “perfect” via to how you can assure via quality and reliability, the first time, every time.
In Pursuit of Perfection: Defect Reduction
For bare PCB board fabrication, defect reduction is a critical aspect of a company's bottom line profitability. In this issue, we examine how imaging, etching, and plating processes can provide information and insight into reducing defects and increasing yields.
Voices of the Industry
We take the pulse of the PCB industry by sharing insights from leading fabricators and suppliers in this month's issue. We've gathered their thoughts on the new U.S. administration, spending, the war in Ukraine, and their most pressing needs. It’s an eye-opening and enlightening look behind the curtain.
- Articles
- Columns
- Links
- Media kit
||| MENU - pcb007 Magazine
NASA Updates Astronaut Assignments for Boeing Starliner Test Flight
June 17, 2022 | NASAEstimated reading time: 3 minutes

NASA will fly two astronaut test pilots aboard the agency’s Boeing Crew Flight Test (CFT) mission to the International Space Station, where they will live and work off the Earth for about two weeks.
CFT commander Barry “Butch” Wilmore, whom NASA assigned to the prime crew in October 2020, will join NASA astronaut Suni Williams, who will serve as pilot. Williams previously served as the backup test pilot for CFT while assigned as commander of NASA’s Boeing Starliner-1 mission, Starliner’s first post-certification mission. As CFT pilot, Williams takes the place of NASA astronaut Nicole Mann, originally assigned to the mission in 2018. NASA reassigned Mann to the agency’s SpaceX Crew-5 mission in 2021.
Based upon current space station resources and scheduling needs, a short duration mission with two astronaut test pilots is sufficient to meet all NASA and Boeing test objectives for CFT, which include demonstrating Starliner’s ability to safely fly operational crewed missions to and from the space station. To protect against unforeseen events with crew transportation to the station, NASA may extend the CFT docked duration up to six months and add an additional astronaut later, if needed.
NASA astronaut Mike Fincke, whom the agency previously assigned as the Joint Operations Commander for CFT, will now train as the backup spacecraft test pilot and remains eligible for assignment to a future mission. Fincke’s unique expertise will continue to benefit the team as he retains his position as flight test lead, filling a vital role in Starliner certification.
"Mike Fincke has dedicated the last nine years of his career to these first Boeing missions and Suni the last seven. Butch has done a marvelous job leading the team as the spacecraft commander since 2020,” said Reid Wiseman, chief, Astronaut Office at NASA’s Johnson Space Center in Houston. “It was great to see Starliner’s successful journey to the International Space Station during the Orbital Flight Test-2 (OFT-2) mission last month. We are all looking forward to cheering on Butch and Suni as they fly the first crewed Starliner mission."
Wilmore, Williams, and Fincke each have flown previously as long-duration crew members aboard the space station.
NASA astronaut Jeanette Epps continues to prepare for an upcoming long duration mission aboard Starliner-1. NASA also has identified backup flight opportunities for Epps on the SpaceX Crew Dragon spacecraft for additional scheduling and resource flexibility. Epps has begun cross-training on the SpaceX Crew Dragon spacecraft to prepare for this possibility.
Meanwhile, NASA and Boeing are continuing to conduct OFT-2 data reviews while assessing future CFT launch opportunities. Following successful completion of the uncrewed OFT-2 mission, the Starliner crew module has returned to Boeing’s Commercial Crew and Cargo Processing Facility at NASA’s Kennedy Space Center in Florida, where it will undergo system checkouts and vehicle inspections. The Starliner team is in the process of delivering the initial test flight data to NASA and jointly determining forward work ahead of a crewed flight. These engineering and program reviews are expected to continue for several weeks, culminating in a launch schedule assessment at the end of July, based upon spacecraft readiness, space station scheduling needs, and Eastern Range availability.
“Starliner and the Atlas V performed well during all phases of OFT-2, and now we are taking a methodical look at each system to determine what needs to be upgraded or improved ahead of CFT, just as we do with every other crewed flight,” said Steve Stich, manager, NASA’s Commercial Crew Program. “Additionally, Butch, Suni, and Mike have been instrumental in the development of Starliner on the path to having a second space station crew transportation system.”
For the crewed flight test, Boeing’s Starliner will launch aboard a United Launch Alliance Atlas V rocket from Space Launch Complex-41 at Cape Canaveral Space Force Station in Florida.
Following a successful CFT mission, NASA will begin the final process of certifying the Starliner spacecraft and systems for crew missions to the space station. Regular, long-duration commercial crew rotation missions enable NASA to continue the important research and technology investigations taking place aboard the orbiting laboratory. Such research benefits people on Earth and lays the groundwork for future exploration of the Moon and Mars, starting with the agency’s Artemis missions, which include landing the first woman and first person of color on the lunar surface.
Suggested Items
Meet the Author Podcast: Martyn Gaudion Unpacks the Secrets of High-Speed PCB Design
07/10/2025 | I-Connect007In this special Meet the Author episode of the On the Line with… podcast, Nolan Johnson sits down with Martyn Gaudion, signal integrity expert, managing director of Polar Instruments, and three-time author in I-Connect007’s popular The Printed Circuit Designer’s Guide to... series.
TTCI Joins Printed Circuit Engineering Association to Strengthen Design-to-Test Collaboration and Workforce Development
07/09/2025 | The Test Connection Inc.The Test Connection Inc. (TTCI), a leading provider of electronic test and manufacturing solutions, is proud to announce its membership in the Printed Circuit Engineering Association (PCEA), further expanding the company’s efforts to support cross-functional collaboration, industry standards, and technical education in the printed circuit design and manufacturing community.
Study on Resonance Mitigation in Metallic Shielding for Integrated Circuits
07/08/2025 | Maria Cuesta-Martin, Victor Martinez, Vidal Gonzalez Aguado, Würth ElektronikInherent cavity resonant modes often lead to significant degradation of shielding effectiveness, responsible for unwanted electromagnetic coupling. Cavity resonant modes of the metal shielding enclosure can produce two adverse problems: the mutual coupling among different RF modules and shielding effectiveness reduction of the metal enclosure. The cabinets serve to shield certain components from electromagnetic interference (EMI). However, these cavities present some resonance peaks at 5 GHz, making it impossible to use them at higher frequencies.
The Global Electronics Association Releases IPC-8911: First-Ever Conductive Yarn Standard for E-Textile Application
07/02/2025 | Global Electronics AssociationThe Global Electronics Association announces the release of IPC-8911, Requirements for Conductive Yarns for E-Textiles Applications. This first-of-its-kind global standard establishes a clear framework for classifying, designating, and qualifying conductive yarns—helping to address longstanding challenges in supply chain communication, product testing, and material selection within the growing e-textiles industry.
Magnalytix and Foresite to Host Technical Webinar on SIR Testing and Functional Reliability
06/26/2025 | MAGNALYTIXMagnalytix, in collaboration with Foresite Inc., is pleased to announce an upcoming one-hour Webinar Workshop titled “Comparing SIR IPC B-52 to Umpire 41 Functional & SIR Test Method.” This session will be held on July 24, 2025, and is open to professionals in electronics manufacturing, reliability engineering, and process development seeking insights into new testing standards for climatic reliability.