-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueEngineering Economics
The real cost to manufacture a PCB encompasses everything that goes into making the product: the materials and other value-added supplies, machine and personnel costs, and most importantly, your quality. A hard look at real costs seems wholly appropriate.
Alternate Metallization Processes
Traditional electroless copper and electroless copper immersion gold have been primary PCB plating methods for decades. But alternative plating metals and processes have been introduced over the past few years as miniaturization and advanced packaging continue to develop.
Technology Roadmaps
In this issue of PCB007 Magazine, we discuss technology roadmaps and what they mean for our businesses, providing context to the all-important question: What is my company’s technology roadmap?
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - pcb007 Magazine
RTX's Raytheon SM-3 Block IIA Achieves Full-rate Production Approval
October 22, 2024 | RTXEstimated reading time: 1 minute
Raytheon, an RTX business, has entered full-rate production for Standard Missile-3 Block IIA, validating the program's design maturity amid increased demand for the product from the United States and allied partners.
The SM-3 Block IIA production milestone cleared the way for a $1.9 billion award from the U.S. Missile Defense Agency in July 2024 to produce rounds for both the U.S. government and Japan Ministry of Defense.
Full-rate production signals that there is no elevated design or manufacturing risk in the missile and validates its reliability and performance.
"SM-3 Block IIA is a testament to the continuing partnership with Japanese industry to mature ballistic missile defense capabilities for the defense of our nation and our allies around the globe," said Barbara Borgonovi, president of Naval Power at Raytheon. "This milestone indicates that the team has achieved full maturity in the missile's design which leads to greater efficiencies throughout the program."
SM-3 Block IIA, created in a landmark cooperative development program between MDA, Japan Ministry of Defense and their industry partners (Raytheon and Japanese industry), is the first MDA-procured program of its kind to achieve this manufacturing milestone. SM-3 Block IIA features larger rocket motors and an enhanced kinetic warhead compared to its predecessors, allowing it to engage threats faster and protect larger regions from short- to intermediate-range ballistic missile threats.
Work under this contract will be done at Raytheon facilities in Tucson, Ariz.; and Huntsville, Ala., with completion by February 2031.