-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueCreating the Ideal Data Package
Why is it so difficult to create the ideal data package? Many of these simple errors can be alleviated by paying attention to detail—and knowing what issues to look out for. So, this month, our experts weigh in on the best practices for creating the ideal design data package for your design.
Designing Through the Noise
Our experts discuss the constantly evolving world of RF design, including the many tradeoffs, material considerations, and design tips and techniques that designers and design engineers need to know to succeed in this high-frequency realm.
Learning to Speak ‘Fab’
Our expert contributors clear up many of the miscommunication problems between PCB designers and their fab and assembly stakeholders. As you will see, a little extra planning early in the design cycle can go a long way toward maintaining open lines of communication with the fab and assembly folks.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - design007 Magazine
Nortech Systems Reports Net Sales of $31.4 Million in Q3 2024
November 8, 2024 | Nortech SystemsEstimated reading time: 1 minute
Nortech Systems Incorporated, a leading provider of engineering and manufacturing solutions for complex electromedical and electromechanical products serving the medical, industrial and defense markets, reported financial results for the third quarter ended September 30, 2024.
2024 Q3 Highlights:
- Net sales of $31.4 million
- Net loss of ($739) thousand, or ($0.27) per diluted share
- Adjusted earnings before interest, taxes, depreciation, and amortization ("EBITDA") of $143 thousand
- 90-day backlog of $29.6 million as of September 30, 2024
Management Commentary
"Third quarter net sales were impacted by a continuing pattern of customers' delaying product purchases, as well as customers' desire to reduce their inventory and to shorten purchase order to fulfillment timelines, both of which have also negatively impacted many in the contract manufacturing industry over the last several quarters," said Jay D. Miller, President and CEO of Nortech. "We see this as an opportunity to further strengthen customer relationships which are key to achieving the Company's long-term strategic objectives. 2024 has been a difficult year with significant headwinds. However, we are meeting these challenges by consolidating facilities and moving a significant number of programs to lower-cost, higher-margin locations, while investing in important new capabilities. In general, we are continuing to position Nortech for sustained long-term health and growth in the face of short-term challenges."
"We have just completed a restructuring of our back office and plant operations to better serve our customers by delivering high-quality products and services on-time with shorter lead times," Miller noted. "We are very pleased with the progress in the third quarter of 2024 to consolidate the Company's North American footprint and to move customer programs to manufacturing locations that better fit our customers' needs. These are strategic moves to better scale the business, improve efficiency and reduce our ongoing cost structure. We are very bullish about our customer pipeline and the future of Nortech Systems."
Suggested Items
Siemens Announces PAVE360 Support for New Arm Zena Compute Subsystems
06/04/2025 | Siemens Digital Industries SoftwareSiemens Digital Industries Software announced today that it is expanding its longstanding relationship with Arm and adding support for the newly launched Arm® Zena™ Compute Subsystems (CSS) in its PAVE360™ software, designed for software-defined vehicles (SDV).
Datest Receives Its 16th AS9100D Recertification Audit
06/03/2025 | DatestDatest, a trusted leader in advanced testing, engineering, inspection, and failure analysis services, proudly announces sixteen straight years of aerospace-grade perfection. Cue the confetti cannons (ESD-safe, of course).
Elma Electronic Bolsters Quality Management Company-wide with Added AS9100:D and ISO9001:2015 Certifications
06/02/2025 | Elma ElectronicElma Electronic now includes AS9100:D and ISO 9001:2015 certifications at its Horsham, Pa. manufacturing facility, earning the company a multiple site accreditation designation.
Maxar Space Systems Selected to Build High-Power EchoStar XXVI Satellite Share
06/02/2025 | BUSINESS WIREMaxar Space Systems, a trusted partner in satellite design and manufacturing, today announced it has been awarded a contract by EchoStar Corporation to manufacture EchoStar XXVI, a high-power geostationary communications satellite based on the Maxar 1300™ platform.
ispace Completes Success 8 of Mission 2 Milestones
06/02/2025 | ispaceispace, inc. (ispace) (TOKYO: 9348), a global lunar exploration company, announced that the RESILIENCE lunar lander has successfully completed all orbital maneuvers while in lunar orbit and is now being prepared for its landing attempt on June 6, 2025.