ispace Completes Success 8 of Mission 2 Milestones
June 2, 2025 | ispaceEstimated reading time: 1 minute

ispace, inc. (ispace) (TOKYO: 9348), a global lunar exploration company, announced that the RESILIENCE lunar lander has successfully completed all orbital maneuvers while in lunar orbit and is now being prepared for its landing attempt on June 6, 2025.
This marks the completion of Success 8 milestone of Mission 2 “SMBC x HAKUTO-R Venture Moon.”
RESILIENCE conducted a lunar orbital control maneuver at 5:27 p.m. JST (08:27 UTC) on May 28, 2025, to move into a circular orbit around the Moon in accordance with the mission operation plan. The operation required an engine burn of approximately 10 minutes, the longest to date on Mission 2. Since then, the lander has been in a 100 km orbit around the Moon and completes a full orbit every 2 hours. After RESILIENCE completed the orbital control maneuver, ispace engineers in the Mission Control Center in Nihonbashi, Tokyo, Japan worked to confirm the precise orbit in advance of the landing sequence.
The RESILIENCE lander, which reached lunar orbit on May 7, 2025 (JST), orbited the moon in an elliptical orbit with a perilune (closest point to the moon) altitude of approximately 70 km and an apolune (farthest point from the moon) altitude of approximately 5,800 km. After performing three orbital control maneuvers, it reached a circular orbit around the moon at an altitude of approximately 100 km.
A lunar landing is scheduled for no earlier than June 5, 2025 (UTC) (June 6, 2025, JST). The RESILIENCE lander is scheduled to begin descent from its current circular orbit. During the descent phase, the lander will automatically fire its main propulsion system to gradually decelerate and adjust its attitude, with the goal of achieving a soft landing on the lunar surface.
“Having completed eight of 10 mission milestones, RESILIENCE is now ready to attempt a historic landing on the Moon, carrying not only the payloads of our customers but also the hopes of our employees, their families, our partners and all of our supporters,” said Takeshi Hakamada, Founder & CEO of ispace. “We have leveraged the operational experience gained in Mission 1 and during this current voyage to the Moon, and we are confident in our preparations for success of the lunar landing.”
Suggested Items
INSPECTIS AB ‘Makes it a Meal’ with Series U50s Advanced Kit
07/18/2025 | INSPECTIS ABFamous chefs the world over maintain that an entrée doesn’t make a great meal without side dishes. At INSPECTIS, we call those ‘sides’ an Advanced Kit.
July 2025 PCB007 Magazine: Sales—From Pitch to PO
07/18/2025 |Though all parts of a company are essential for holistic success, it is a foundational truth that a company lives and dies by its sales. If there are no sales, the company eventually ceases to exist, or as Henry Ford says, “Nothing happens until someone sells something.” In the July issue of PCB007 Magazine, we break down the sales stack and provide a guide to up your sales game.
Silicon Mountain Contract Services Enhances SMT Capabilities with New HELLER Reflow Oven
07/17/2025 | Silicon Mountain Contract ServicesSilicon Mountain Contract Services, a leading provider of custom electronics manufacturing solutions, is proud to announce a significant upgrade to its SMT production capability with the addition of a HELLER 2043 MK5 10‑zone reflow oven to its Nampa facility.
KONIG Launches KP400: Advanced 3D Digital Conformal Coating System for High-Density Electronics
07/15/2025 | KONIGKONIG, a leader in electronic packaging protection solutions, is proud to announce the launch of the KP400 3D Digital Packaging Solution—a breakthrough conformal coating system that brings new levels of precision, speed, and material efficiency to electronics manufacturing.
Electronics Manufacturing & Assembly Collaborative (EMAC) Announces Innovative Student Competition
07/15/2025 | EMACThe Electronics Manufacturing & Assembly Collaborative (EMAC) recently announced the launch of the Bright Manufacturing Challenge 2025, a revolutionary hands-on competition that transforms how students experience electronics manufacturing and robotics engineering.