-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueSpotlight on India
We invite you on a virtual tour of India’s thriving ecosystem, guided by the Global Electronics Association’s India office staff, who share their insights into the region’s growth and opportunities.
Supply Chain Strategies
A successful brand is built on strong customer relationships—anchored by a well-orchestrated supply chain at its core. This month, we look at how managing your supply chain directly influences customer perception.
What's Your Sweet Spot?
Are you in a niche that’s growing or shrinking? Is it time to reassess and refocus? We spotlight companies thriving by redefining or reinforcing their niche. What are their insights?
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
ispace Completes Success 8 of Mission 2 Milestones
June 2, 2025 | ispaceEstimated reading time: 1 minute

ispace, inc. (ispace) (TOKYO: 9348), a global lunar exploration company, announced that the RESILIENCE lunar lander has successfully completed all orbital maneuvers while in lunar orbit and is now being prepared for its landing attempt on June 6, 2025.
This marks the completion of Success 8 milestone of Mission 2 “SMBC x HAKUTO-R Venture Moon.”
RESILIENCE conducted a lunar orbital control maneuver at 5:27 p.m. JST (08:27 UTC) on May 28, 2025, to move into a circular orbit around the Moon in accordance with the mission operation plan. The operation required an engine burn of approximately 10 minutes, the longest to date on Mission 2. Since then, the lander has been in a 100 km orbit around the Moon and completes a full orbit every 2 hours. After RESILIENCE completed the orbital control maneuver, ispace engineers in the Mission Control Center in Nihonbashi, Tokyo, Japan worked to confirm the precise orbit in advance of the landing sequence.
The RESILIENCE lander, which reached lunar orbit on May 7, 2025 (JST), orbited the moon in an elliptical orbit with a perilune (closest point to the moon) altitude of approximately 70 km and an apolune (farthest point from the moon) altitude of approximately 5,800 km. After performing three orbital control maneuvers, it reached a circular orbit around the moon at an altitude of approximately 100 km.
A lunar landing is scheduled for no earlier than June 5, 2025 (UTC) (June 6, 2025, JST). The RESILIENCE lander is scheduled to begin descent from its current circular orbit. During the descent phase, the lander will automatically fire its main propulsion system to gradually decelerate and adjust its attitude, with the goal of achieving a soft landing on the lunar surface.
“Having completed eight of 10 mission milestones, RESILIENCE is now ready to attempt a historic landing on the Moon, carrying not only the payloads of our customers but also the hopes of our employees, their families, our partners and all of our supporters,” said Takeshi Hakamada, Founder & CEO of ispace. “We have leveraged the operational experience gained in Mission 1 and during this current voyage to the Moon, and we are confident in our preparations for success of the lunar landing.”
Testimonial
"In a year when every marketing dollar mattered, I chose to keep I-Connect007 in our 2025 plan. Their commitment to high-quality, insightful content aligns with Koh Young’s values and helps readers navigate a changing industry. "
Brent Fischthal - Koh YoungSuggested Items
Breakthrough in Non-Contact Solder Removal Earns Kurtz Ersa 2025 Mexico Technology Award at SMTA Guadalajara
09/18/2025 | Kurtz Ersa Inc.Kurtz Ersa Inc., a leading supplier of electronics production equipment, is proud to announce that it has been awarded a 2025 Mexico Technology Award in the category of Rework & Repair for its HR 600P Automatic Rework System.
Knocking Down the Bone Pile: Best Practices for Electronic Component Salvaging
09/17/2025 | Nash Bell -- Column: Knocking Down the Bone PileElectronic component salvaging is the practice of recovering high-value devices from PCBs taken from obsolete or superseded electronic products. These components can be reused in new assemblies, reducing dependence on newly purchased parts that may be costly or subject to long lead times.
On the Line With… Podcast: UHDI and RF Performance
09/17/2025 | I-Connect007I-Connect007 is excited to announce the release of a new episode in its latest On the Line with... podcast series, which shines a spotlight on one of the most important emerging innovations in electronics manufacturing: Ultra-High-Density Interconnect (UHDI).
The Marketing Minute: Cracking the Code of Technical Marketing
09/17/2025 | Brittany Martin -- Column: The Marketing MinuteMarketing is never a one-size-fits-all endeavor, but the challenges are magnified for highly technical industries like electronics. Products and processes are complex, audiences are diverse, and the stakes are high, especially when your customers are engineers, decision-makers, and global partners who depend on your expertise.
EV Group Achieves Breakthrough in Hybrid Bonding Overlay Control for Chiplet Integration
09/12/2025 | EV GroupEV Group (EVG), a leading provider of innovative process solutions and expertise serving leading-edge and future semiconductor designs and chip integration schemes, today unveiled the EVG®40 D2W—the first dedicated die-to-wafer overlay metrology platform to deliver 100 percent die overlay measurement on 300-mm wafers at high precision and speeds needed for production environments. With up to 15X higher throughput than EVG’s industry benchmark EVG®40 NT2 system designed for hybrid wafer bonding metrology, the new EVG40 D2W enables chipmakers to verify die placement accuracy and take rapid corrective action, improving process control and yield in high-volume manufacturing (HVM).