-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueWhat's Your Sweet Spot?
Are you in a niche that’s growing or shrinking? Is it time to reassess and refocus? We spotlight companies thriving by redefining or reinforcing their niche. What are their insights?
Moving Forward With Confidence
In this issue, we focus on sales and quoting, workforce training, new IPC leadership in the U.S. and Canada, the effects of tariffs, CFX standards, and much more—all designed to provide perspective as you move through the cloud bank of today's shifting economic market.
Intelligent Test and Inspection
Are you ready to explore the cutting-edge advancements shaping the electronics manufacturing industry? The May 2025 issue of SMT007 Magazine is packed with insights, innovations, and expert perspectives that you won’t want to miss.
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
ispace Completes Success 8 of Mission 2 Milestones
June 2, 2025 | ispaceEstimated reading time: 1 minute

ispace, inc. (ispace) (TOKYO: 9348), a global lunar exploration company, announced that the RESILIENCE lunar lander has successfully completed all orbital maneuvers while in lunar orbit and is now being prepared for its landing attempt on June 6, 2025.
This marks the completion of Success 8 milestone of Mission 2 “SMBC x HAKUTO-R Venture Moon.”
RESILIENCE conducted a lunar orbital control maneuver at 5:27 p.m. JST (08:27 UTC) on May 28, 2025, to move into a circular orbit around the Moon in accordance with the mission operation plan. The operation required an engine burn of approximately 10 minutes, the longest to date on Mission 2. Since then, the lander has been in a 100 km orbit around the Moon and completes a full orbit every 2 hours. After RESILIENCE completed the orbital control maneuver, ispace engineers in the Mission Control Center in Nihonbashi, Tokyo, Japan worked to confirm the precise orbit in advance of the landing sequence.
The RESILIENCE lander, which reached lunar orbit on May 7, 2025 (JST), orbited the moon in an elliptical orbit with a perilune (closest point to the moon) altitude of approximately 70 km and an apolune (farthest point from the moon) altitude of approximately 5,800 km. After performing three orbital control maneuvers, it reached a circular orbit around the moon at an altitude of approximately 100 km.
A lunar landing is scheduled for no earlier than June 5, 2025 (UTC) (June 6, 2025, JST). The RESILIENCE lander is scheduled to begin descent from its current circular orbit. During the descent phase, the lander will automatically fire its main propulsion system to gradually decelerate and adjust its attitude, with the goal of achieving a soft landing on the lunar surface.
“Having completed eight of 10 mission milestones, RESILIENCE is now ready to attempt a historic landing on the Moon, carrying not only the payloads of our customers but also the hopes of our employees, their families, our partners and all of our supporters,” said Takeshi Hakamada, Founder & CEO of ispace. “We have leveraged the operational experience gained in Mission 1 and during this current voyage to the Moon, and we are confident in our preparations for success of the lunar landing.”
Suggested Items
I-Connect007 Editor’s Choice: Five Must-Reads for the Week
07/11/2025 | Andy Shaughnessy, Design007 MagazineThis week, we have quite a variety of news items and articles for you. News continues to stream out of Washington, D.C., with tariffs rearing their controversial head again. Because these tariffs are targeted at overseas copper manufacturers, this news has a direct effect on our industry.I-Connect007 Editor’s Choice: Five Must-Reads for the Week
Infineon Advances on 300-millimeter GaN Manufacturing Roadmap as Leading Integrated Device Manufacturer (IDM)
07/10/2025 | InfineonAs the demand for gallium nitride (GaN) semiconductors continues to grow, Infineon Technologies AG is poised to capitalize on this trend and solidify its position as a leading Integrated Device Manufacturer (IDM) in the GaN market.
The Global Electronics Association Releases IPC-8911: First-Ever Conductive Yarn Standard for E-Textile Application
07/02/2025 | Global Electronics AssociationThe Global Electronics Association announces the release of IPC-8911, Requirements for Conductive Yarns for E-Textiles Applications. This first-of-its-kind global standard establishes a clear framework for classifying, designating, and qualifying conductive yarns—helping to address longstanding challenges in supply chain communication, product testing, and material selection within the growing e-textiles industry.
SMT007 Magazine July—What’s Your Competitive Sweet Spot?
07/01/2025 | I-Connect007 Editorial TeamAre you in a niche that’s growing or shrinking? Is it time to reassess and refocus? We spotlight companies thriving by redefining or reinforcing their niche—what are their insights? In the July 2025 issue of SMT007 Magazine, we spotlight companies thriving by redefining or reinforcing their niche and offer insights to help you evaluate your own.
TRI Unveils New Multi-Camera AOI, TR7500 SIII Ultra
06/27/2025 | TRITest Research, Inc. (TRI), the leading test and inspection systems provider for the electronics manufacturing industry, proudly introduces the new TR7500 SIII Ultra.