Share on:

Share on LinkedIn Share on X Share on Facebook Share with email


Subscribe

Stay ahead of the technologies shaping the future of electronics with our latest newsletter, Advanced Electronics Packaging Digest. Get expert insights on advanced packaging, materials, and system-level innovation, delivered straight to your inbox.

Subscribe now to stay informed, competitive, and connected.

Suggested Items

The Electronic Component Shortage Crisis: A Veteran Engineer’s Perspective

02/18/2019 | John Watson, CID, Legrand Inc.
From where we stand now, at the beginning of 2019, we see lead times for some components in the short range of up to 16 weeks; medium-to-high is 32 weeks, and long lead times are as far out as 80 weeks. In other words, if we ordered a component today, it would arrive in over a year a half from now (maybe). This all started with the capacitors (we will see why later), but we now see other component series being sucked into this problem.

TANAKA Expands FC Catalyst Production Capacity

07/16/2018 | ACN Newswire
TANAKA Holdings Co., Ltd. announced that TANAKA Kikinzoku Kogyo K.K., which operates the TANAKA Precious Metals manufacturing business, established a new Fuel Cell Catalyst Development Center in Kanagawa Prefecture to develop and manufacture electrode catalysts used in fuel cells.
Copyright © I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in