-
- News
- Books
Featured Books
- I-Connect007 Magazine
Latest Issues
Current Issue
Beyond the Rulebook
What happens when the rule book is no longer useful, or worse, was never written in the first place? In today’s fast-moving electronics landscape, we’re increasingly asked to design and build what has no precedent, no proven path, and no tidy checklist to follow. This is where “Design for Invention” begins.
March Madness
From the growing role of AI in design tools to the challenge of managing cumulative tolerances, these articles in this issue examine the technical details, design choices, and manufacturing considerations that determine whether a board works as intended.
Looking Forward to APEX EXPO 2026
I-Connect007 Magazine previews APEX EXPO 2026, covering everything from the show floor to the technical conference. For PCB designers, we move past the dreaded auto-router and spotlight AI design tools that actually matter.
- Articles
- Columns
- Links
- Media kit
||| MENU - I-Connect007 Magazine
Redwire Imaging Tech Supports Artemis II Mission
April 1, 2026 | BUSINESS WIREEstimated reading time: 1 minute
Redwire Corporation, a global leader in space and defense technology solutions, announced that its advanced optical imaging and sun sensor technology will launch on board the Orion spacecraft as part of NASA’s Artemis II mission, the first crewed mission for the Artemis program. Through contracts with Lockheed Martin, NASA’s prime contractor for Orion, Redwire is responsible for the production and testing of the Orion Camera System for Artemis missions I-V.
“You may have heard the phrase, ‘the camera is the mission,’ which certainly still resonates today. I am so proud that Redwire is providing its trusted and flight-proven imaging and navigation technology for Artemis II, which will play a vital role in this historic endeavor,” said Mike Gold, President of Redwire Space. “We can’t all be astronauts, but through the amazing imagery that our cameras will capture, the whole world can be a part of the extraordinary journey of discovery that is Artemis II.”
The camera system for Artemis II comprises 11 internal and external inspection and navigation cameras, including wireless cameras positioned on each of Orion’s four solar arrays to allow in-flight inspection of the entire spacecraft. The system’s Optical Navigation Camera provides high resolution imagery to the spacecraft's machine vision algorithm to determine Orion’s position and velocity relative to Earth. Other cameras will record 4k video and 12MP images and livestream both the inside and outside of the vehicle, including key mission events such as separation, jettison, deployment, and crew demonstrations. The Redwire cameras on board Artemis I successfully captured imagery and video, including livestream views from the solar array wing cameras that were made available to the public throughout the mission.
Redwire is also providing four redundant Coarse Sun Sensor (CSS) assemblies for Orion’s European Service Module (ESM) through a contract with Airbus. The CSS are part of Orion’s solar power generation system and will provide important data to the Solar Array Drive Electronics to adjust the ESM’s solar panels. The CSS were part of and performed successfully on Artemis I.
Testimonial
"Advertising in PCB007 Magazine has been a great way to showcase our bare board testers to the right audience. The I-Connect007 team makes the process smooth and professional. We’re proud to be featured in such a trusted publication."
Klaus Koziol - atgSuggested Items
Synopsys Solutions Support NASA's Artemis Program with Spacesuit Analysis and Communication System Development
04/14/2026 | PRNewswireNASA selected Synopsys, Inc. and EMA to verify spacesuit compatibility with the lunar environment.
Teledyne Supports NASA Artemis II with Critical Technologies
04/09/2026 | BUSINESS WIRETeledyne Technologies Incorporated announced its broad support of NASA’s Artemis II mission, with multiple Teledyne businesses delivering mission‑critical technologies that help power, protect, connect, and track America’s first crewed voyage around the Moon in more than 50 years.
Honeywell’s Mission-Critical Technologies Help Enable NASA's Crewed Artemis II Mission
04/08/2026 | HoneywellBuilding on the success of the Artemis I mission, Honeywell has provided multiple critical technologies for NASA's Artemis II launch and ongoing mission around the moon.
Renesas’ Radiation-Hardened ICs Take Flight on NASA’s Artemis II Crewed Lunar Mission
04/02/2026 | BUSINESS WIRERenesas Electronics Corporation, a premier supplier of advanced semiconductor solutions, today announced its radiation-hardened (rad-hard) ICs are being used in NASA’s Artemis II mission, which successfully launched from the Kennedy Space Center in Florida on April 1.
Sypris Wins Expanded Follow-On Award for Deep Space Program
01/21/2026 | Sypris Electronics LLCSypris Electronics, LLC, a subsidiary of Sypris Solutions, Inc., announced that it has received an expanded follow-on award from a leading U.S. aerospace and defense contractor to produce and test circuit card assemblies for use in Orion spacecraft supporting the missions of NASA’s Artemis program. Production is scheduled to begin in 2026.