NASA Seeks US Partners to Develop Reusable Systems to Land Astronauts on Moon
February 18, 2019 | NASAEstimated reading time: 2 minutes

As the next major step to return astronauts to the Moon under Space Policy Directive-1, NASA announced plans on December 13 to work with American companies to design and develop new reusable systems for astronauts to land on the lunar surface. The agency is planning to test new human-class landers on the Moon beginning in 2024, with the goal of sending crew to the surface in 2028.
Image Caption: Artist’s concept of a human landing system and its crew on the lunar surface with Earth near the horizon.
Through multi-phased lunar exploration partnerships, NASA is asking American companies to study the best approach to landing astronauts on the Moon and start the development as quickly as possible with current and future anticipated technologies.
“Building on our model in low-Earth orbit, we’ll expand our partnerships with industry and other nations to explore the Moon and advance our missions to farther destinations such as Mars, with America leading the way,” said NASA Administrator Jim Bridenstine. “When we send astronauts to the surface of the Moon in the next decade, it will be in a sustainable fashion.”
The agency’s leading approach to sending humans to the Moon is using a system of three separate elements that will provide transfer, landing, and safe return. A key aspect of this proposed approach is to use the Gateway for roundtrip journeys to and from the surface of the Moon.
Using the Gateway to land astronauts on the Moon allows the first building blocks for fully reusable lunar landers. Initially NASA expects two of the lander elements to be reusable and refueled by cargo ships carrying fuel from Earth to the Gateway. The agency is also working on technologies to make rocket propellants using water ice and regolith from the Moon. Once the ability to harness resources from the Moon for propellant becomes viable, NASA plans to refuel these elements with the Moon’s own resources. This process, known as in-situ resource utilization or ISRU, will make the third element also refuelable and reusable.
NASA published a formal request for proposals to an appendix of the second Next Space Technologies for Exploration Partnerships (NextSTEP-2) Broad Agency Announcement (BAA) on Feb. 7, and responses are due March 25.
According to the solicitation, NASA will fund industry-led development and flight demonstrations of lunar landers built for astronauts by supporting critical studies and risk reduction activities to advance technology requirements, tailor applicable standards, develop technology, and perform initial demonstrations by landing on the Moon.
When NASA again sends humans to the Moon, the surface will be buzzing with new research and robotic activity, and there will be more opportunities for discovery than ever before. Private sector innovation is key to these NASA missions, and the NextSTEP public-private partnership model is advancing capabilities for human spaceflight while stimulating commercial activities in space.
The President’s direction from Space Policy Directive-1 galvanizes NASA’s return to the Moon and builds on progress on the Space Launch System rocket and Orion spacecraft, efforts with commercial and international partners, and knowledge gained from current robotic presence at the Moon and Mars.
Suggested Items
Anda Technologies to Feature Automated Dispensing and Coating at SMTA Guadalajara
09/21/2023 | Anda TechnologiesAnda Technologies, a leading provider of fluid application and custom automated manufacturing equipment, is excited to announce its participation in SMTA Guadalajara, a premier event in the electronics manufacturing industry.
Designer’s Notebook: DFM Principles for Flexible Circuits
09/14/2023 | Vern Solberg -- Column: Designer's NotebookFlexible circuit applications can be as basic as furnishing electrical interconnect between two conventional circuit board assemblies, or to prove a platform for placing and interconnecting electronic components. During the planning and pre-design phase of the flexible circuit, there will be several material and process related questions that need to be addressed. Most flexible circuit fabricators welcome the opportunity to discuss their customers’ flexible circuit objectives prior to beginning the actual design process.
ZESTRON to Showcase Innovative Cleaning Solutions and Process Support at SMTA International 2023
09/11/2023 | ZESTRONZESTRON, the leading global provider of high-precision cleaning products, services, and training solutions in the electronics manufacturing and semiconductor industries, is thrilled to announce its participation in the upcoming Surface Mount Technology Association (SMTA) International Conference and Exhibition, scheduled to take place from October 9-12, 2023.
Austin American Technology Creates Buzz with Justin Worden’s 1st SMTA Presentation
09/07/2023 | Austin American Technology (AAT)Justin Worden, the dynamic Global Sales and Marketing Director at Austin American Technology (AAT), is no stranger to creating a buzz in the electronics industry.
Anda Technologies to Showcase State-of-the-Art Plasma, Dispensing and Coating Systems at SMTA International
09/06/2023 | Anda Technologies USA, Inc.Anda Technologies, a leading provider of fluid application and custom automated manufacturing equipment, will exhibit in Booth #916 at the upcoming SMTA International exhibition. The event will be held at the Minneapolis Convention Center in Minnesota from Oct. 10-11, 2023.