-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueThe Growing Industry
In this issue of PCB007 Magazine, we talk with leading economic experts, advocacy specialists in Washington, D.C., and PCB company leadership to get a well-rounded picture of what’s happening in the industry today. Don’t miss it.
The Sustainability Issue
Sustainability is one of the most widely used terms in business today, especially for electronics and manufacturing but what does it mean to you? We explore the environmental, business, and economic impacts.
The Fabricator’s Guide to IPC APEX EXPO
This issue previews many of the important events taking place at this year's show and highlights some changes and opportunities. So, buckle up. We are counting down to IPC APEX EXPO 2024.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - pcb007 Magazine
Viking Test to Relocate to Larger Facility
January 25, 2016 | Viking Test LimitedEstimated reading time: Less than a minute
Viking Test has purchased a new building and will be moving into the facility early next month. Due to a general increased level of business, Viking required a larger space to house their various product line and keep up with demand. The new facility, just some 5 miles away from their current site, has almost three times the internal space of its predecessor.
The new facility will give Viking the space needed to accommodate their current workload and future expansion plans.
Viking can now be found at:
Unit 15, Bordon Trading Estate
Old Station Way, Bordon
Hants, UK GU35 9HH
About Viking Test Ltd
Viking Test Ltd is a leading printed circuit board equipment supplier providing quality services and products throughout Europe. For more information on Viking Test and their products and service you can visit them on the web at www.vikingtest.com or by contacting sales manager Veena Bopanna at veena@vikingtest.com.
Suggested Items
Real Time with… IPC APEX EXPO 2024: Circuit Board Testing Strategies and the Impact of AI
05/08/2024 |Editor Marcy LaRont speaks with Bert Horner, president of The Test Connection, about the importance of strategic planning and design-for-test (DFT). Bert touches on some common mistakes that occur when DFT is not adequately considered early on. The discussion outlines an overarching industry need for a culture shift toward increasingly higher levels of integration and collaboration. Bert mentions that AI now has an influence on testing, as everywhere else, and announces his forthcoming book.
Real Time with… IPC APEX EXPO 2024: Understanding Objective Evidence in Manufacturing Processes
05/07/2024 | Real Time with...IPC APEX EXPOGraham Naisbitt explains the importance of objective evidence in manufacturing processes, debunking the common misconception that the ROSE test is a cleanliness test. He also discusses the introduction of Rev J, a requirement for measuring ionic contamination on circuit assemblies, and the challenges in accurately measuring contamination. Alternative methods like ion chromatography and the need for updating standards like the ROSE test are mentioned.
U.S. Air Force Secretary Kendall Flies in AI-Piloted X-62A VISTA
05/06/2024 | Lockheed MartinLockheed Martin Skunk Works joined the U.S. Air Force Test Pilot School and other government and industry partners in hosting U.S. Secretary of the Air Force Frank Kendall to fly in the X-62A Variable In-flight Simulation Test Aircraft (VISTA), a one-of-a-kind aircraft modified to test artificial intelligence (AI) and autonomy capabilities.
Real Time with… IPC APEX EXPO 2024: Software Solutions for Circuit Board Challenges
05/03/2024 | Real Time with...IPC APEX EXPONolan Johnson speaks with Will Webb from Aster Technologies about their software solutions for design teams, manufacturing, test engineers, and process engineers. Aster's software addresses the increasing complexities of circuit boards and the need for alternative testing methods.
Manta Ray UUV Prototype Completes In-Water Testing
05/02/2024 | DARPAThe Manta Ray prototype uncrewed underwater vehicle (UUV) built by performer Northrop Grumman completed full-scale, in-water testing off the coast of Southern California in February and March 2024.