- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueWhat's Your Sweet Spot?
Are you in a niche that’s growing or shrinking? Is it time to reassess and refocus? We spotlight companies thriving by redefining or reinforcing their niche. What are their insights?
Moving Forward With Confidence
In this issue, we focus on sales and quoting, workforce training, new IPC leadership in the U.S. and Canada, the effects of tariffs, CFX standards, and much more—all designed to provide perspective as you move through the cloud bank of today's shifting economic market.
Intelligent Test and Inspection
Are you ready to explore the cutting-edge advancements shaping the electronics manufacturing industry? The May 2025 issue of SMT007 Magazine is packed with insights, innovations, and expert perspectives that you won’t want to miss.
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
Why the Right Preparation is Crucial for Your NPI
February 15, 2018 | Neil Sharp, JJS ManufacturingEstimated reading time: 3 minutes

Taking a new product design from conception to reality is a hugely exciting prospect for any original equipment manufacturer (OEM), whether you’re planning to bring a brand-new prototype to market, to up-issue an existing design, or to transfer your outsourcing requirements to a new assembly partner.
In today's increasingly competitive manufacturing environment it's crucial that you are able to produce high quality new products that can be delivered on time, at the volumes required and at the right cost. And the key to ensuring a smooth transition from the initial design through to final manufacture is the implementation of a new product introduction (NPI) process.
If your electronics manufacturing services (EMS) provider gets each stage of the NPI process right, then you could be on track to boost sales, encourage company growth and achieve lucrative market share. But if you fail to complete your project on time, within budget or to the required standard then it could be a completely different story.
Critical to the success of your NPI process will be the rigorous behind-the-scenes preparation work that your EMS partner puts into action before the build of your product even gets underway.
In this blog post we explore the vital importance of preparation for NPI, and what you can (and should) expect of your EMS provider throughout this essential stage.
Of course, no two EMS partners are the same. Each will have their own unique assembly equipment, build documents, internal procedures and staffing capabilities. And each is likely to have their own approach as to how they manage the process of NPI within their manufacturing environment.
What's crucial though is that your EMS partner provides you with complete transparency as to how they manage each stage of this complex process and that they can clearly demonstrate the quality controls that they have in place.
Preparing for the Build
A huge amount of detailed behind-the-scenes work needs to take place before your NPI build can even begin. Your EMS will kick off the process by quoting the product, loading the bill of materials (BoM) onto their system and acknowledging the order. They'll then move on to procuring the materials, taking delivery, inspecting them and assigning them to a unique works order.
Your EMS provider's engineering team, meanwhile, will be responsible for checking the PCB panelization, setting up the programs for pick-and-place and AOI machines and for creating custom-built packs for the production teams to work to.
All the materials for the job will then need to be prepared for assembly - from baking bare boards to draw out moisture, to cropping component legs for through-hole placement (PTH) and the loading of pick and place feeders with surface mount reeled devices.
Your EMS partner will ideally capture all of these tasks in a 'tollgate' process which will culminate in a pre-build review meeting controlled by their engineering team. It's vital that everything is in place before the build begins. So, as an example, the logistics team shouldn't be in a position to release any material out to the production team until engineering gives the final approval.
Your EMS partner may also insist on creating a small batch first before they even consider moving on to 'production' volumes. Testing your NPI build in small batches can be invaluable in ensuring that any errors in the build information or the build process are identified and nipped in the bud to avoid any time-consuming and costly rework further down the line.
While the NPI process is a necessarily complex one, many of the tasks and procedures that your EMS partner will carry out may not always be so obvious to you as the OEM. And to some extent of course, they probably don't need to be.
After all, what's most important to you as the customer, is that your products turn up on time, in budget and in full working order.
Ultimately though, the quality and robustness of the NPI process that your EMS provider has in place, will be a critical contributor to your success, from the initial pre-planning stages right through to the final delivery of your new product.
This article originally appeared on the JJS Manufacturing blog, which can be found here.
Suggested Items
Smarter Machines Use AOI to Transform PCB Inspections
06/30/2025 | Marcy LaRont, PCB007 MagazineAs automated optical inspection (AOI) evolves from traditional end-of-process inspections to proactive, in-line solutions, the integration of AI and machine learning is revolutionizing defect reduction and enhancing yields, marking a pivotal shift in how quality is managed in manufacturing.
SolderKing’s Successful Approach to Modern Soldering Needs
06/18/2025 | Nolan Johnson, I-Connect007Chris Ward, co-founder of the family-owned SolderKing, discusses his company's rapid growth and recent recognition with the King’s Award for Enterprise. Chris shares how SolderKing has achieved these award-winning levels of service in such a short timeframe. Their secret? Being flexible in a changing market, technical prowess, and strong customer support.
ZETWERK Enhances Manufacturing Capabilities with TRI
06/04/2025 | TRITest Research, Inc. (TRI), the leading test and inspection systems provider for the electronics manufacturing industry, is pleased to announce that ZETWERK Electronics has integrated TRI's Automated Optical Inspection (AOI) and Solder Paste Inspection (SPI) solutions into its state-of-the-art manufacturing facility in Tamil Nadu.
Axxon-Mycronic Enhances Conformal Coating Quality with New Inline AOI and Thickness Measurement Technology
06/03/2025 | Axxon-MycronicAxxon-Mycronic, a leading, global supplier of innovative and production-ready, dispensing and conformal coating systems, announced a breakthrough in automated optical inspection (AOI) technology for conformal coating with the introduction of its Modus inline conformal coating AOI system—CCAOI.
I-Connect007 Editor’s Choice: Five Must-Reads for the Week
05/30/2025 | Andy Shaughnessy, Design007I don’t have a scorecard, but I do have a weekly wrap-up of must-reads that I think deserve another “bite of the apple,” so to speak. IPC’s Rich Cappetto shares his perspective on everything from tariffs to the CHIPS Act. Columnist Josh Casper discusses the use of AI in 3D AOI systems and the immediate benefits that AI can bring about. Columnist Anaya Vardya explains how technologies like AI can improve our customer service, as well as our manufacturing processes.