-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueBreaking High-speed Material Constraints
Do you need specialty materials for your high-speed designs? Maybe not. Improvements in resins mean designers of high-speed boards can sometimes use traditional laminate systems. Learn more in this issue.
Level Up Your Design Skills
This month, our contributors discuss the PCB design classes available at IPC APEX EXPO 2024. As they explain, these courses cover everything from the basics of design through avoiding over-constraining high-speed boards, and so much more!
Opportunities and Challenges
In this issue, our expert contributors discuss the many opportunities and challenges in the PCB design community, and what can be done to grow the numbers of PCB designers—and design instructors.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - design007 Magazine
Designing Through Supply Chain Pain
September 13, 2022 | Chris Young, Young Engineering ServicesEstimated reading time: 2 minutes
Engineers are accustomed to the demanding challenges of designing for miniaturization, cost reduction, cross platform compatibility, and harsh environments. What has proven to be the most painful experience of my career (and for many of my colleagues) is the sheer lack of components from which to build our designs. Development cycles—commercial, industrial, medical, avionics—have been severely impacted, from large enterprise corporations to small design/integration companies. Even as consultants, we have had a rough time. The good news is that design engineers tend to be tenacious in nature and this aids in finding ways to manage/mitigate difficult problems.
Awareness of the situation is the first step to understanding the underlying problems faced by today’s design engineers industry wide. Here are a few of the situations I have faced in the last year alone.
Long Lead Times
I experienced a product launch failure due to component unavailability. The client had a great idea, practical experience with the market, and identified a need which is not currently being served. What was needed was a compact, robust design that would fit the application—my bread and butter. I could not bring this product to fruition because of the lack of simple microcontrollers and peripheral devices. I was upfront with the customer that component availability was an issue and we needed to procure prototype and initial production materials early on, with the expectation that not all purchases may not be used in the design.
Several months into the development, I was notified that my orders were not only delayed but cancelled. Lead times for components previously on order now extended anywhere from 50 to 100 weeks, well beyond the needed date. PCBs already in hand, I then proceeded to delay/cancel my assembly orders and inform the customer that I could not produce a prototype, let alone a production-ready device to meet their launch window; the current status is in limbo.
Cost Increases
Massive product component cost increases due to the use of brokers to procure components have been a standard process of late as well. I have designs in production that doubled or tripled in cost due to a few hard-to-find ICs that were once considered plain, run-of-the-mill components. I typically avoid using brokers due to the increased level of scrutiny (cost) needed to ensure the components are indeed authentic, not reused/reclaimed parts, and undamaged. Typically, I would initiate a redesign to mitigate the unavailable component(s). In today’s barren component landscape, redesign has become second place to using a broker because of the risk of not being able to procure the replacement components.
Board Respins
The increased number of board respins I have performed lately has been troublesome and expensive. I have not been able to produce a design within the last year without having to perform a respin based on component unavailability. I now commonly hear from customers and colleagues that non-recurring engineering (NRE) cost is becoming more like recurring engineering (RE) cost. The sheer number of delivery cancellations and delays has caused me and many others to respin PCBs before they even hit the assembly line. In an attempt to stay positive, I will jokingly say, “These respins spin me right ‘round, like a record, right ‘round, ‘round, ‘round.”
To read this entire article, which appeared in the September 2022 issue of Design007 Magazine, click here.
Suggested Items
Quantic Electronics Announces Acquisition of M Wave Design
05/20/2024 | Quantic ElectronicsQuantic® Electronics, a portfolio company of Arcline Investment Management, announced the acquisition of M Wave Design, a leading supplier of ferrite-based RF and Microwave components for aerospace, defense, and quantum computing applications.
Textron Systems Collaborates with Kodiak to Develop Uncrewed Military Vehicle
05/20/2024 | PRNewswireTextron Systems Corporation, a Textron Inc. company, a leading developer of crewed and uncrewed military ground vehicles, and Kodiak Robotics, Inc., a leading self-driving technology developer for the trucking and defense markets, announced that they are collaborating to develop an autonomous military ground vehicle specifically designed for driverless operations.
Spring 2024 Santa Clara County Flexfactor Finals Held at Nextflex
05/20/2024 | NextFlexNextFlex hosts this semester’s FlexFactor. Four teams of high school students competed by pitching their inventive products to a panel of esteemed judges composed of Robert de Neve, General Partner & Chief Strategist General Partner & Chief Strategist at NextPhase Ventures; Christine Holly Ngo, VP of Operations and Business Development at Silicon Valley Elite Manufacturing, Inc; and Jackson Rambough, FHE Design and Process Engineer at NextFlex.
Würth Elektronik in United States Embarks on New Milestone with State-of-the-Art Headquarters
05/17/2024 | Wurth ElektronikWürth Elektronik in the United States, a leading manufacturer of electronic and electromechanical components as well as custom magnetics, has announced the commencement of construction on a new 70,000-square-foot headquarters. This new facility underscores the company’s commitment to innovation and grow in the electronics industry.
IPC APEX EXPO: Some Thoughts About Growth
05/16/2024 | Dan Feinberg, I-Connect007After two and a half days of wandering the aisles at IPC APEX EXPO 2024, for the first time, I almost felt like I was exploring CES. There were so many booths and exhibits that I could describe, but I’d like to focus on the growth and huge value of this event, which has expanded well beyond just the growing and impressive exhibit show floor.