-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssuePower Integrity
Current power demands are increasing, especially with AI, 5G, and EV chips. This month, our experts share “watt’s up” with power integrity, from planning and layout through measurement and manufacturing.
Signal Integrity
If you don’t have signal integrity problems now, you will eventually. This month, our expert contributors share a variety of SI techniques that can help designers avoid ground bounce, crosstalk, parasitic issues, and much more.
Proper Floor Planning
Floor planning decisions can make or break performance, manufacturability, and timelines. This month’s contributors weigh in with their best practices for proper floor planning and specific strategies to get it right.
- Articles
- Columns
- Links
- Media kit
||| MENU - design007 Magazine
Redwire Awarded Contract to Provide Roll-Out Solar Arrays for Axiom Space’s First Space Station Module
September 25, 2025 | BUSINESS WIREEstimated reading time: 2 minutes
Redwire Corporation, a global leader in space and defense technology solutions, announced it has been awarded a contract from Axiom Space, a leader in commercial space infrastructure, to develop and deliver roll-out solar array (ROSA) wings for Axiom Station’s Payload Power Thermal Module (AxPPTM)—the first module for the company’s commercial space station.
“As a market leader for space power solutions, Redwire is proud to be selected as a strategic supplier to deliver ROSAs for Axiom Space’s first space station module,” said Mike Gold, Redwire President of Civil and International Space. “As NASA and industry take the next steps to build out commercial space stations to maintain U.S. leadership in low-Earth orbit (LEO), Redwire continues to be the partner of choice enabling critical capabilities to ensure on-orbit success.”
Axiom Space plans to attach its AxPPTM to the International Space Station as the first module in its assembly sequence followed by Habitat 1 (AxH1), an airlock, Habitat 2 (AxH2), and finally the Research and Manufacturing Facility (AxRMF). After the launch and berthing of AxPPTM to the International Space Station, the module will separate and rendezvous with AxH1 on orbit resulting in Axiom Station’s independent operational capability. This approach enables the two-module station to become a free-flyer as early as 2028 and an independent four-module station by 2030, ensuring a continuous U.S. human presence in LEO after the International Space Station retires. The Axiom Station development plan aligns with U.S. objectives and preserves critical capabilities currently utilized on the International Space Station. AxPPTM is anticipated to launch toward the end of 2027.
Progress continues on the AxPPTM primary structure built by Thales Alenia Space in Turin, Italy, having completed its final weld in July. Axiom Station modules will be integrated and assembled at Axiom Space’s Assembly and Integration facility in Houston, marking the first human-rated spacecraft ever built in Space City.
“This contract with Redwire on the roll-out solar array (ROSA) wings is a critical step toward developing our first Axiom Station module,” said Tejpaul Bhatia, CEO of Axiom Space. “Redwire’s decades of spaceflight heritage developing advanced spacecraft technology will ultimately enable Axiom Station’s global customers to conduct research, innovate, discover, and scale for the benefit of humanity.”
Redwire’s ROSA technology has a 100% success rate of on-orbit performance and is being used on a wide range of civil and commercial missions including the International Space Station, NASA’s Double Asteroid Redirection Test mission, the Maxar-built Power and Propulsion Element for the Artemis Lunar Gateway, and Thales Alenia Space’s Space Inspire satellites.
Testimonial
"In a year when every marketing dollar mattered, I chose to keep I-Connect007 in our 2025 plan. Their commitment to high-quality, insightful content aligns with Koh Young’s values and helps readers navigate a changing industry. "
Brent Fischthal - Koh YoungSuggested Items
The Republic of Korea Selects L3Harris for Airborne Early Warning and Control Aircraft Program
10/20/2025 | BUSINESS WIREL3Harris Technologies has received a contract to deliver modified Bombardier Global 6500 airborne early warning and control (AEW&C) aircraft to the Republic of Korea Air Force.
SemiQon's Cryogenic Chip Technology for Quantum Computing and Space Applications Receives Award from EARTO
10/17/2025 | PRNewswireEARTO, the organisation of the European Research and Technology Organisations, awarded SemiQon and VTT first prize in the "Impact Expected" category on 14 October 2025 in Brussels for a pioneering cryogenic CMOS (complementary metal-oxide semiconductor) chip innovation.
Molex Announces Agreement to Acquire Smiths Interconnect
10/17/2025 | MolexMolex, a leading global electronics connectivity innovator, announced that it has signed an agreement to acquire Smiths Interconnect.
SemiQon's Cryogenic Chip Technology for Quantum Computing and Space Applications Receives Award from EARTO
10/16/2025 | PRNewswireEARTO, the organisation of the European Research and Technology Organisations, awarded SemiQon and VTT first prize in the "Impact Expected" category on 14 October 2025 in Brussels for a pioneering cryogenic CMOS (complementary metal-oxide semiconductor) chip innovation.
Light-curable Solutions for Reliable Electronics in Space Applications
10/15/2025 | Virginia Hogan, DymaxDesigning electronics for space environments, particularly those in low Earth orbit (LEO), requires careful consideration of materials that can withstand extreme conditions while supporting long-term reliability. Engineers designing satellite systems, aerospace instrumentation, and high-altitude platforms face a familiar set of challenges: contamination control, mechanical stress, thermal cycling, and manufacturability.