- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueCreating the Ideal Data Package
Why is it so difficult to create the ideal data package? Many of these simple errors can be alleviated by paying attention to detail—and knowing what issues to look out for. So, this month, our experts weigh in on the best practices for creating the ideal design data package for your design.
Designing Through the Noise
Our experts discuss the constantly evolving world of RF design, including the many tradeoffs, material considerations, and design tips and techniques that designers and design engineers need to know to succeed in this high-frequency realm.
Learning to Speak ‘Fab’
Our expert contributors clear up many of the miscommunication problems between PCB designers and their fab and assembly stakeholders. As you will see, a little extra planning early in the design cycle can go a long way toward maintaining open lines of communication with the fab and assembly folks.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - design007 Magazine
Hunter Technology on Design Operations and Business Strategies
March 23, 2015 | Kelly Dack, I-Connect007Estimated reading time: 9 minutes
Dack: Part of the curricula in the CID program includes using standards and specifications that have been developed to allow parts and designs to be manufactured anywhere, by anybody; it's really neat to see two designers who are embedded in an EMS company, who can design. They have the answers and can design for manufacturability and are right down the hall.
Grover: That is well said. In fact, that's exactly what they said when they came back. They are very experienced designers, without question, but what they learned and came back with is knowledge of fab and assembly and industry terms and maybe even specs. In fact, they are sitting with a customer right now. When the customer found out they had passed the CID course, he said, "Now you're going to be able to tell what you can and can't do, right?" So with more knowledge comes more experience to say what we can and can't do.
Dack: Since you do design and assembly here, the missing link on site is fabrication.
Grover: It's the worst part of the whole manufacturing process. That's why we're not involved (laughs).
Dack: Tell us how it works. How do you qualify a bare board vendor?
Grover: I'm going to tell you from my perspective, because from a design service bureau mentality, we engage with customers, like I alluded to earlier. We engage with them in their current supply chain where we're going to do design help for that organization, outsource and then it goes right back into to that organization. They pick their own fab path. That's already set in stone. In other cases, we engage with the customer with an initial product and if they have no option or have no experience, we drive that selection. That's what you're referring to.
Dack: Yes.
Grover: In that case, we typically want to use a local Bay Area shop. The reason that's important is turn time. If they can drive the fab over here when it's done, the three-day turn really is three days because it can get here that third-day afternoon. So that's key.
Those organizations typically tend to be Streamline, Viasystems, TTM—those kinds of fab shops. We pick them based on the complexity of the board, the technology, and their price.
Dack: That's a good concept. It's a good topic from the standpoint of acknowledging that everything's got a tolerance. Everything has a range that we're trying to fit into. Everything has a risk. When things do screw up, how is it resolved? How does your customer or your supplier resolve it?
Chris Alessio: If there's a fab issue, we'll first try to understand what that fab issue is and then get the quality department involved and their supplier corrective action request. Then there's also mitigation, which is financial. Depending on at what point in that process we found the problem and what the root cause of that problem is, whether it's a design-related aspect or a fab-related aspect, we have arrangements with key suppliers to cover bare board costs, consequential loss type of components, and labor content. It's across-the-board.
Grover: From my perspective, though, Kelly, if somebody screws up I'm just going to use the next guy, because I have kind of free range in that environment of the front-end engineering prototype world. To Chris’s point, that's more on the production side. To be honest, really, that's the production model of Hunter. I'm kind of a rogue entity where I can pick and choose what’s best for the initial protos to get built, tested and delivered on time and free of defects.
Dack: We side-barred into what happens when things go wrong. I think we got a good answer. You audit, you check and you go through a process that doesn't lop their head off right away.
Grover: They're still in the queue, still in the AVL, but we just start using another guy. Dack: Importantly, you keep a queue or a stable of sources/fab shops, and that is very wise.
Page 2 of 3
Suggested Items
Connection Wins Intel Partner of the Year Award for AI PC
05/16/2025 | BUSINESS WIREConnection, a leading information technology solutions provider to business, government, healthcare, and education markets, is pleased to announce that it has received Intel’s 2025 Partner of the Year award for AI PC. Connection earned this distinction for demonstrating exceptional technology innovation and collaboration in developing solutions and marketing strategies.
Rheinmetall, ICEYE Sign MoU to Establish Joint Venture
05/14/2025 | RheinmetallRheinmetall and globally leading SAR satellite manufacturer ICEYE are further intensifying their cooperation. The two companies intend to establish a joint venture for satellite production. A memorandum of understanding to this effect was signed on 8 May 2025.
Northrop Grumman Navigation Technology Completes Hypersonic Test Flights
05/14/2025 | Northrop GrummanNorthrop Grumman Corporation successfully completed two test flights of its Advanced Hypersonic Technology Inertial Measurement Unit at hypersonic speed, leveraging Stratolaunch’s reusable hypersonic airplane, Talon-A.
L3Harris Receives $214 Million in Orders to Support German Armed Forces
05/12/2025 | L3Harris TechnologiesL3Harris Technologies has received multiple orders expected to total $214 million under Germany’s Digitalization – Land Based Operations (D-LBO) program.
Kaynes Technology Acquires Canada-Based August Electronics
05/09/2025 | PRNewswireAugust Electronics Inc. is pleased to announce that it has entered into a definitive agreement to be acquired by Kaynes Canada Limited, a wholly owned step-down subsidiary of Kaynes Technology India Limited, a leading Electronics System Design & Manufacturing (ESDM) company. The transaction is expected to close by the end of May 2025, subject to customary regulatory approvals and closing conditions.