- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueShowing Some Constraint
A strong design constraint strategy carefully balances a wide range of electrical and manufacturing trade-offs. This month, we explore the key requirements, common challenges, and best practices behind building an effective constraint strategy.
All About That Route
Most designers favor manual routing, but today's interactive autorouters may be changing designers' minds by allowing users more direct control. In this issue, our expert contributors discuss a variety of manual and autorouting strategies.
Creating the Ideal Data Package
Why is it so difficult to create the ideal data package? Many of these simple errors can be alleviated by paying attention to detail—and knowing what issues to look out for. So, this month, our experts weigh in on the best practices for creating the ideal design data package for your design.
- Articles
- Columns
- Links
- Media kit
||| MENU - design007 Magazine
Hunter Technology on Design Operations and Business Strategies
March 23, 2015 | Kelly Dack, I-Connect007Estimated reading time: 9 minutes
Dack: Part of the curricula in the CID program includes using standards and specifications that have been developed to allow parts and designs to be manufactured anywhere, by anybody; it's really neat to see two designers who are embedded in an EMS company, who can design. They have the answers and can design for manufacturability and are right down the hall.
Grover: That is well said. In fact, that's exactly what they said when they came back. They are very experienced designers, without question, but what they learned and came back with is knowledge of fab and assembly and industry terms and maybe even specs. In fact, they are sitting with a customer right now. When the customer found out they had passed the CID course, he said, "Now you're going to be able to tell what you can and can't do, right?" So with more knowledge comes more experience to say what we can and can't do.
Dack: Since you do design and assembly here, the missing link on site is fabrication.
Grover: It's the worst part of the whole manufacturing process. That's why we're not involved (laughs).
Dack: Tell us how it works. How do you qualify a bare board vendor?
Grover: I'm going to tell you from my perspective, because from a design service bureau mentality, we engage with customers, like I alluded to earlier. We engage with them in their current supply chain where we're going to do design help for that organization, outsource and then it goes right back into to that organization. They pick their own fab path. That's already set in stone. In other cases, we engage with the customer with an initial product and if they have no option or have no experience, we drive that selection. That's what you're referring to.
Dack: Yes.
Grover: In that case, we typically want to use a local Bay Area shop. The reason that's important is turn time. If they can drive the fab over here when it's done, the three-day turn really is three days because it can get here that third-day afternoon. So that's key.
Those organizations typically tend to be Streamline, Viasystems, TTM—those kinds of fab shops. We pick them based on the complexity of the board, the technology, and their price.
Dack: That's a good concept. It's a good topic from the standpoint of acknowledging that everything's got a tolerance. Everything has a range that we're trying to fit into. Everything has a risk. When things do screw up, how is it resolved? How does your customer or your supplier resolve it?
Chris Alessio: If there's a fab issue, we'll first try to understand what that fab issue is and then get the quality department involved and their supplier corrective action request. Then there's also mitigation, which is financial. Depending on at what point in that process we found the problem and what the root cause of that problem is, whether it's a design-related aspect or a fab-related aspect, we have arrangements with key suppliers to cover bare board costs, consequential loss type of components, and labor content. It's across-the-board.
Grover: From my perspective, though, Kelly, if somebody screws up I'm just going to use the next guy, because I have kind of free range in that environment of the front-end engineering prototype world. To Chris’s point, that's more on the production side. To be honest, really, that's the production model of Hunter. I'm kind of a rogue entity where I can pick and choose what’s best for the initial protos to get built, tested and delivered on time and free of defects.
Dack: We side-barred into what happens when things go wrong. I think we got a good answer. You audit, you check and you go through a process that doesn't lop their head off right away.
Grover: They're still in the queue, still in the AVL, but we just start using another guy. Dack: Importantly, you keep a queue or a stable of sources/fab shops, and that is very wise.
Page 2 of 3
Suggested Items
Microchip Expands Space-Qualified FPGA Portfolio with New RT PolarFire® Device Qualifications and SoC Availability
07/10/2025 | MicrochipContinuing to support the evolving needs of space system developers, Microchip Technology has announced two new milestones for its Radiation-Tolerant (RT) PolarFire® technology: MIL-STD-883 Class B and QML Class Q qualification of the RT PolarFire RTPF500ZT FPGA and availability of engineering samples for the RT PolarFire System-on-Chip (SoC) FPGA.
Infineon Advances on 300-millimeter GaN Manufacturing Roadmap as Leading Integrated Device Manufacturer (IDM)
07/10/2025 | InfineonAs the demand for gallium nitride (GaN) semiconductors continues to grow, Infineon Technologies AG is poised to capitalize on this trend and solidify its position as a leading Integrated Device Manufacturer (IDM) in the GaN market.
Bell to Build X-Plane for Phase 2 of DARPA Speed and Runway Independent Technologies (SPRINT) X-Plane Program
07/09/2025 | Bell Textron Inc.Bell Textron Inc., a Textron Inc. company, has been down-selected for Phase 2 of Defense Advanced Research Projects Agency (DARPA) Speed and Runway Independent Technologies (SPRINT) X-Plane program with the objective to complete design, construction, ground testing and certification of an X-plane demonstrator.
2025 ASEAN IT Spending Growth Slows to 5.9% as AI-Powered IT Expansion Encounters Post-Boom Normalization
06/26/2025 | IDCAccording to the IDC Worldwide Black Book: Live Edition, IT spending across ASEAN is projected to grow by 5.9% in 2025 — down from a robust 15.0% in 2024.
DownStream Acquisition Fits Siemens’ ‘Left-Shift’ Model
06/26/2025 | Andy Shaughnessy, I-Connect007I recently spoke to DownStream Technologies founder Joe Clark about the company’s acquisition by Siemens. We were later joined by A.J. Incorvaia, Siemens’ senior VP of electronic board systems. Joe discussed how he, Rick Almeida, and Ken Tepper launched the company in the months after 9/11 and how the acquisition came about. A.J. provides some background on the acquisition and explains why the companies’ tools are complementary.